TenderDekho Logo
Active GEM

Indian Air Force Illuminated Wind Direction Indicator Tender Pulwama Jammu & Kashmir 2026

Bid Publish Date

10-Oct-2026, 5:47 pm

Bid End Date

20-Oct-2026, 6:00 pm

Progress

Issue10-Oct-2026, 5:47 pm
AwardPending

Tender Overview

The Indian Air Force, Department of Military Affairs, invites bids for an Illuminated Wind Direction Indicator to be supplied and installed at AIR FORCE STATION AWANTIPUR, Pulwama, Jammu & Kashmir. The procurement specifies installation, commissioning, testing, and potential field support via OEM or OEM-certified resources. Bidders must upload Data Sheets, commit to warranty clauses, and provide ink-signed ATC on official letterhead. The buyer reserves flexible quantity adjustment up to 25% of bid quantity and extended delivery timelines based on contract performance, with delivery linked to the original delivery period and calculated extensions. This tender emphasizes compliance with data sheet parity and manufacturer-led installation, ensuring traceable OEM accountability at the Awantipur address. Unique emphasis on data-sheet alignment and vendor credibility differentiates compliant bids from rejections.

Key Specifications

  • Illuminated Wind Direction Indicator for airfield operations

  • OEM-certified installation and commissioning

  • Data Sheet uploaded and matched to bid product

  • Warranty undertaking as per ATC

  • Delivery to Air Force Station Awantipur, Pulwama, J&K

  • Quantity variation allowance up to 25%

Terms & Conditions

  • Delivery/installation at Awantipur, Pulwama

  • 25% quantity variation rights during and after order

  • Data Sheet parity and OEM warranty required

Important Clauses

Payment Terms

Not explicitly defined in the tender; follow standard GeM/OEM terms and GeM ATC accordingly.

Delivery Schedule

Delivery period commences from the last date of original delivery order; additional time determined by (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

Penalties/Liquidated Damages

Not specified in the provided terms; bidders should assume standard supplier performance clauses as per GeM ATC.

Bidder Eligibility

  • Proven installation capability of wind direction indicators at defense airfields

  • OEM authorization or OEM-certified installation resources

  • Compliance with warranty terms and data sheet verification

Advertisement

Tender Data

Bid Details

Quantity

1

Bid Type

Single Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

125

OEM Avg. Turnover

8

Past Performance

50 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

ILLUMINATED WIND DIRECTION INDICATOR

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

PULWAMA

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-PULWAMAPULWAMA--160-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10016697.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Air Force

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Categories 1

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Data Sheet of offered wind direction indicator

4

Ink-signed ATC with GeM Document Number on letterhead

5

Warranty compliance undertaking on official letterhead

6

OEM authorization / OEM-certified installation capability

7

Technical bid documents and scanned copies

8

Any previous installation experience certificates (if available)

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for the wind direction indicator tender in Pulwama Awantipur 2026?

Bidders must submit Data Sheets, ink-signed ATC on official letterhead, and warranty undertaking. Ensure OEM authorization or OEM-certified installation capability, and upload all required documents (GST, PAN, experience certificates). Delivery terms allow up to 25% quantity variation with calculation-based extension, and installation must be performed by OEM-level personnel.

What is the eligibility for supplying wind indicators to IAF Awantipur?

Eligibility requires OEM certification or authorization, proven installation capability at defense airfields, and demonstrable warranty compliance. Also submit Data Sheet parity, GST and PAN documentation, and previous installation experience if available.

What documents are required for the wind indicator tender submission in J&K?

Required documents include GST certificate, PAN card, Data Sheet of offered product, ink-signed ATC with GeM number, warranty undertaking on letterhead, OEM authorization, technical bid documents, and any relevant installation experience certificates.

What are the delivery terms for the Awantipur wind indicator bid 2026?

Delivery period begins after the original delivery order; quantity may increase/decrease by 25%. Extended delivery time uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days, and may be extended to the original period.

How to ensure data sheet parity for the wind indicator tender?

Upload the Data Sheet that exactly matches offered specifications; any mismatch between data sheet and product parameters can lead to bid rejection. Align model, voltage, mounting, and certification details precisely with the OEM data.

What warranty documents must accompany the wind indicator bid in Pulwama?

Submit a warranty compliance undertaking on official letterhead, confirming adherence to the warranty clause as per ATC, and ensure the warranty terms are clearly described for the installed wind indicator.

Advertisement