Progress
The Rural Development Department, Bihar invites bids for a High Mast Lighting Tower with LED Flood Lighting System (Q3) to illuminate a large area in Samastipur, Bihar 848101. The procurement scope references large-area lighting towers with LED floodlights; exact quantity and estimated value are not disclosed. Unique aspects include a 25% quantity option during contract placement and currency extensions, plus delivery-time rules tied to the original delivery period. Non-trivial requirements cover post-award service, dedicated support channels, and establishment of a state-wide service footprint. The bid emphasizes compliance with after-sale service infrastructure while maintaining flexible delivery planning within contract terms. This opportunity targets vendors capable of rapid scale, installation coordination, and local service presence to meet Bihar’s rural development goals.
Product: High Mast Lighting Tower with LED Flood Lighting System (Q3) for large-area illumination
Delivery: Up to 25% quantity variation during contract; minimum 30 days extension if required
Service: Functional Service Centre in Bihar; establishment within 30 days of award
Support: Dedicated toll-free service number; escalation matrix for service support
Warranty/AMC: On-site or carry-in warranty terms to be clarified; include post-warranty support plan
Quantity fluctuation up to 25% with calculated delivery extension
Functional Service Centre in the state; establishment within 30 days of award
Dedicated toll-free service line and escalation matrix required
Option to increase/decrease quantity up to 25% at contract; delivery period linked to last original/extended delivery date; minimum 30 days
Bidder must have a functional Service Centre in Bihar; if not present, establish within 30 days of award; payment dependent on documentary proof
Dedicated toll-free service number and an escalation matrix must be provided for rapid resolution
Not under liquidation, receivership, or bankruptcy
Demonstrate ability to establish/maintain service centers in Bihar
Provide documentary evidence of functional service capability and escalation processes
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3)
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Samastipur
Delivery Pincodes
848117
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Navin Kumar Thakur | 848117,gram panchayat raj shripurgahar west | Samastipur | Bihar | 848117 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Financial statements (last 2-3 years)
Undertaking confirming no liquidation/bankruptcy
Proof of functional Service Centre in Bihar (or evidence of establishment within 30 days of award)
Dedicated toll-free service number and escalation matrix details
OEM authorization (if applicable) and technical compliance certifications
Any previous project experience certificates related to lighting towers or LED flood lighting
Key insights about BIHAR tender market
Bidders must submit GST, PAN, financial statements, an undertaking of sound financial standing, and proof of a functional service center in Bihar (or establishment within 30 days). Include an escalation matrix and toll-free support details; ensure compliance with service obligations and option-quantity terms.
Required documents include GST certificate, PAN, last 2-3 years’ financial statements, an anti-liquidation undertaking, proof of Bihar service center, OEM authorizations if applicable, and a detailed service-support plan with escalation contacts.
The purchaser may adjust quantity by ±25% at contract awarding and during currency, with delivery time adjusted using the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
At bid submission, provide evidence of service capability; while standards are not specified, include ISO/quality and warranty documentation, along with a robust service-center plan and escalation matrix for LED flood lighting systems.
Payment is contingent on documentary evidence of a functional service center in Bihar; bidders must demonstrate readiness to provide on-site or carry-in warranty support as per ATC terms.
The bidder must provide a formal escalation matrix with multiple contact levels and telephone numbers to ensure timely resolution of service issues; this is mandatory for bid submission.
Option to increase quantity up to 25% may be exercised at contract placement and during the currency of the contract, subject to original contract terms and delivery-time rules.
Submit an undertaking confirming no liquidation or bankruptcy, along with recent financial statements; this demonstrates financial stability necessary to fulfill large-scale lighting projects.