TenderDekho Logo
Active GEM

Rural Development Department Bihar High Mast Lighting Tower Tender Samastipur 2026 LED Flood Light Q3

Bid Publish Date

08-Sep-2026, 8:36 pm

Bid End Date

18-Sep-2026, 9:00 pm

Progress

Issue08-Sep-2026, 8:36 pm
AwardPending

Tender Overview

The Rural Development Department, Bihar invites bids for a High Mast Lighting Tower with LED Flood Lighting System (Q3) to illuminate a large area in Samastipur, Bihar 848101. The procurement scope references large-area lighting towers with LED floodlights; exact quantity and estimated value are not disclosed. Unique aspects include a 25% quantity option during contract placement and currency extensions, plus delivery-time rules tied to the original delivery period. Non-trivial requirements cover post-award service, dedicated support channels, and establishment of a state-wide service footprint. The bid emphasizes compliance with after-sale service infrastructure while maintaining flexible delivery planning within contract terms. This opportunity targets vendors capable of rapid scale, installation coordination, and local service presence to meet Bihar’s rural development goals.

Technical Specifications & Requirements

  • Product category: High Mast Lighting Tower with LED Flood Lighting System (Q3) for large-area illumination
  • Service capability: Functional Service Centre in the state of each consignee location; establishment within 30 days if not already present
  • Support infrastructure: Dedicated toll-free service number and an escalation matrix for technical support
  • Delivery terms: Option to increase quantity up to 25% of contracted quantity; delivery period adjustments based on extended quantity and original delivery period, minimum 30 days
  • Compliance expectations: Service-level commitments and proof of service capabilities required at bid submission, with documentary evidence of functional center and escalation contacts
  • Warranty/AMC: On-site or carry-in warranty considerations clarified in ATC; bidder to confirm warranty terms and post-warranty support

Terms, Conditions & Eligibility

  • Quantity option: Purchaser may increase/decrease quantity up to 25% during contract and currency, with timing rules linked to last delivery date
  • Financial standing: Bidder must not be in liquidation or bankruptcy; an undertaking to this effect is required
  • Service obligations: Establish/confirm functional service centers within 30 days of award; payment contingent on documentary evidence
  • Support channels: Dedicated toll-free number for service and an escalation matrix for rapid issue resolution
  • Documentation: Provide service-center proof, escalation contacts, and a formal service-support plan as part of bid submission

Key Specifications

  • Product: High Mast Lighting Tower with LED Flood Lighting System (Q3) for large-area illumination

  • Delivery: Up to 25% quantity variation during contract; minimum 30 days extension if required

  • Service: Functional Service Centre in Bihar; establishment within 30 days of award

  • Support: Dedicated toll-free service number; escalation matrix for service support

  • Warranty/AMC: On-site or carry-in warranty terms to be clarified; include post-warranty support plan

Terms & Conditions

  • Quantity fluctuation up to 25% with calculated delivery extension

  • Functional Service Centre in the state; establishment within 30 days of award

  • Dedicated toll-free service line and escalation matrix required

Important Clauses

Delivery Terms

Option to increase/decrease quantity up to 25% at contract; delivery period linked to last original/extended delivery date; minimum 30 days

Service Centre Requirement

Bidder must have a functional Service Centre in Bihar; if not present, establish within 30 days of award; payment dependent on documentary proof

Support & Escalation

Dedicated toll-free service number and an escalation matrix must be provided for rapid resolution

Bidder Eligibility

  • Not under liquidation, receivership, or bankruptcy

  • Demonstrate ability to establish/maintain service centers in Bihar

  • Provide documentary evidence of functional service capability and escalation processes

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

High Mast Lighting Tower for large area with LED Flood Lighting System (Q3)

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Samastipur

Delivery Pincodes

848117

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Navin Kumar Thakur848117,gram panchayat raj shripurgahar westSamastipurBihar848117115-

Authority Records

RURAL DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9866179.pdf

Main Document

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Block Office Khanpur Samastipur

Grievance Contact

[email protected]

Categories 5

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Financial statements (last 2-3 years)

4

Undertaking confirming no liquidation/bankruptcy

5

Proof of functional Service Centre in Bihar (or evidence of establishment within 30 days of award)

6

Dedicated toll-free service number and escalation matrix details

7

OEM authorization (if applicable) and technical compliance certifications

8

Any previous project experience certificates related to lighting towers or LED flood lighting

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for High Mast Lighting Tower tender in Samastipur Bihar 2026

Bidders must submit GST, PAN, financial statements, an undertaking of sound financial standing, and proof of a functional service center in Bihar (or establishment within 30 days). Include an escalation matrix and toll-free support details; ensure compliance with service obligations and option-quantity terms.

What documents are required for Bihar lighting tender submission

Required documents include GST certificate, PAN, last 2-3 years’ financial statements, an anti-liquidation undertaking, proof of Bihar service center, OEM authorizations if applicable, and a detailed service-support plan with escalation contacts.

What are the delivery terms for quantity variations in this tender

The purchaser may adjust quantity by ±25% at contract awarding and during currency, with delivery time adjusted using the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What standards or certifications are required for lighting towers in Bihar

At bid submission, provide evidence of service capability; while standards are not specified, include ISO/quality and warranty documentation, along with a robust service-center plan and escalation matrix for LED flood lighting systems.

How is payment release linked to service centers in this tender

Payment is contingent on documentary evidence of a functional service center in Bihar; bidders must demonstrate readiness to provide on-site or carry-in warranty support as per ATC terms.

What is the role of the escalation matrix in this procurement

The bidder must provide a formal escalation matrix with multiple contact levels and telephone numbers to ensure timely resolution of service issues; this is mandatory for bid submission.

When will the option to increase quantity take effect during contract

Option to increase quantity up to 25% may be exercised at contract placement and during the currency of the contract, subject to original contract terms and delivery-time rules.

What is required to prove financial stability for this Bihar tender

Submit an undertaking confirming no liquidation or bankruptcy, along with recent financial statements; this demonstrates financial stability necessary to fulfill large-scale lighting projects.