TenderDekho Logo
GEM

Hindustan Petroleum Corporation Ltd De-Compression Unit DCU Tender Bareilly Uttar Pradesh 1000 SCMH 2026

Bid Publish Date

23-Jun-2026, 4:52 pm

Bid End Date

23-Jul-2026, 3:00 pm

EMD

₹3,08,000

Generate Docs

Progress

Issue23-Jun-2026, 4:52 pm
Corrigendum16-Jul-2026
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

28

Category

1000 SCMH DE-COMPRESSION UNIT DCU FOR JS GA

Bid Type

Two Packet Bid

Key Highlights

  • HPCL Bareilly 1000 SCMH De-Compression Unit DCU for JS GA and UP-UK CLUSTER GA
  • Site supervision, commissioning, performance testing, onsite client training
  • 1-year ARC maintenance after warranty period
  • EMD amount ₹ 308,000; quantity variation up to 25%
  • Delivery period rules: last-date-of-original-delivery order baseline; minimum 30 days extension
  • No technical specs provided in tender data; standard industrial gas equipment compliance expected

Categories 16

Tender Overview

Hindustan Petroleum Corporation Ltd invites bids for 1000 SCMH De-Compression Unit DCU for JS GA and UP-UK CLUSTER GA along with supervision at site commissioning, performance testing, and onsite client training for a 1000 SCMH Decompression Skid. The contract includes 1 year ARC maintenance after warranty and onsite support for both clusters. The estimated scope covers skid installation, commissioning oversight, and post-warranty call maintenance, with EMD ₹ ₹308,000. The location is Bareilly, Uttar Pradesh and the procurement targets gas processing equipment and associated services. The tender allows quantity variations up to 25% during and after contract execution, with extension rules tied to delivered quantities and timeframes. This opportunity requires coordination for on-site deployment and performance validation.

Technical Specifications & Requirements

  • Product: 1000 SCMH De-Compression Unit DCU for JS GA and UP-UK CLUSTER GA; includes skid features and integration with existing processes.
  • Scope of work: Site supervision during commissioning, performance testing, and onsite client training; ARC maintenance for 1 year after warranty; on-call support for skid maintenance.
  • Delivery terms: Option clause enabling ±25% quantity adjustment; delivery period activates from the last date of the initial delivery order; extended time calculations follow a defined formula with a minimum 30 days.
  • Financials: EMD ₹ 308,000; estimated contract value not disclosed; details governed by Buyer Added Terms and Conditions.
  • Warranty: Warranty period referenced with ARC after completion; details not specified beyond 1-year ARC scope.
  • Standards/Compliance: Not specified in the data provided; bidders should rely on standard industrial gas equipment practices and HPCL internal guidelines.

Terms, Conditions & Eligibility

  • EMD: ₹ 308,000 (EMD submission required per terms).
  • Option Clause: Quantity may increase/decrease by up to 25%; extended delivery time calculated as (additional quantity / original quantity) × original delivery period, minimum 30 days.
  • Delivery & Performance: On-site commissioning supervision, performance testing, and client training; ARC maintenance for 1 year post-warranty.
  • Warranty/Penalties: Warranty referenced with ARC; penalties not specified in data.
  • Delivery Periods: Not fixed in data; governed by option clause and delivery terms.
  • Documentation: Not specified; bidders should prepare standard bid packets per HPCL guidelines and related terms.

Key Specifications

  • Product/service names: 1000 SCMH De-Compression Unit DCU

  • Quantities/volumes: 1000 SCMH capacity per skid for JS GA and UP-UK CLUSTER GA

  • EMD/Estimated value: ₹ 308,000 EMD; estimated value not disclosed

  • Experience: installation/commissioning of similar DCU skid projects

  • Quality/standards: not specified; align with HPCL guidelines and IS/industry best practices

  • Delivery: on-site supervision, commissioning, testing, training; ARC for 1 year post-warranty

Terms & Conditions

  • EMD amount ₹ 308,000 and bid submission as per HPCL terms

  • Quantity variation up to 25% during and after contract with formula-based delivery extension

  • 1-year ARC maintenance after warranty and on-call skid maintenance support

Important Clauses

Delivery Terms

Option clause permits ±25% quantity changes; delivery period starts from last date of original delivery order; minimum 30 days for extended delivery

Payment Terms

Not specified in data; bidders should await HPCL terms and standard procurement payment schedules

Warranty & ARC

Warranty period followed by 1-year ARC maintenance; on-site maintenance during ARC may be invoked after warranty completion

Bidder Eligibility

  • Experience in supplying and commissioning 1000 SCMH DCU skid systems or equivalent gas-decompression units

  • Financial credibility with audited statements for at least 2-3 years

  • GST registration and PAN; OEM authorization for DCU components

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

1000 SCMH DE-COMPRESSION UNIT DCU FOR JS GA , Supervision at site commissioning performance testing onsite training of client OF 1000 SCMH Decompression Skid of JS GA , Assistance in maintenance of the skid at site on a call basis during the 01 year ARC after completion of the warranty period of JS GA , 1000 SCMH DE-COMPRESSION UNIT DCU FOR UP-UK CLUSTER GA , Supervision at site commissioning performance testing onsite training of client OF 1000 SCMH Decompression Skid of UP-UK CLUSTER GA , Assistance in maintenance of the skid at site on a call basis during the 01 year ARC after completion of the warranty period of UP-UK CLUSTER GA

Advisory Bank

ICICI

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

112

Delivery Locations

1

Delivery Cities

Bareilly

Delivery Pincodes

243001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Bhanu Pratap Singh243001,HPCL, BAREILLY LPG REGIONAL OFFICE 1ST & 2ND FLOOR MAHALAKSHMI TOWER, CIVIL LINES, PIN Code 243001BareillyUttar Pradesh2430011112-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9509901.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

1000 SCMH DE-COMPRESSION UNIT DCU FOR JS GA

1000 SCMH DE-COMPRESSION UNIT DCU FOR JS GA as per tender document

1 nos Delivery: 112 days
#2

Supervision at site commissioning performance testing onsite training of client OF 1000 SCMH Decompression Skid of JS GA

Supervision at site commissioning performance testing onsite training of client personnel including hook up with SS tubing at the battery limit and all other related works for commissioning performance testing of 1000 SCMH Decompression Skid of JS GA as per tender document

1 nos Delivery: 112 days
#3

Assistance in maintenance of the skid at site on a call basis during the 01 year ARC after completion of the warranty period of JS GA

Assistance in maintenance of the skid at site on a call basis during the 01 year ARC after completion of the warranty period The price shall be inclusive of Airfare Boarding Lodging Local Transport Incidental Travelling etc all other expenses of JS GA as per tender document

12 mandays Delivery: 112 days
#4

1000 SCMH DE-COMPRESSION UNIT DCU FOR UP-UK CLUSTER GA

1000 SCMH DE-COMPRESSION UNIT DCU FOR UP-UK CLUSTER GA as per tender document

1 nos Delivery: 112 days
#5

Supervision at site commissioning performance testing onsite training of client OF 1000 SCMH Decompression Skid of UP-UK CLUSTER GA

Supervision at site commissioning performance testing onsite training of client personnel including hook up with SS tubing at the battery limit and all other related works for commissioning performance testing of 1000 SCMH Decompression Skid of UP-UK CLUSTER GA as per tender document

1 nos Delivery: 112 days
#6

Assistance in maintenance of the skid at site on a call basis during the 01 year ARC after completion of the warranty period of UP-UK CLUSTER GA

Assistance in maintenance of the skid at site on a call basis during the 01 year ARC after completion of the warranty period The price shall be inclusive of Airfare Boarding Lodging Local Transport Incidental Travelling etc all other expenses UP-UK CLUSTER GA as per tender document

12 mandays Delivery: 112 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration

2

Permanent Account Number (PAN)

3

Experience certificates for similar DCU/ skid installations

4

Financial statements (audited) for last 2-3 years

5

EMD submission proof (₹ 308,000)

6

Technical bid documents showing DCU skid compatibility and commissioning plan

7

OEM authorizations or vendor credentials for De-Compression Unit components

8

Any site-specific safety and training certifications

Corrigendum Updates

6 Updates
#1

Update

16-Jul-2026
#2

Update

16-Jul-2026

Extended Deadline

23-Jul-2026, 3:00 pm

Opening Date

23-Jul-2026, 3:30 pm

#3

Update

14-Jul-2026

Extended Deadline

21-Jul-2026, 3:00 pm

Opening Date

21-Jul-2026, 3:30 pm

#4

Update

07-Jul-2026
#5

Update

07-Jul-2026

Extended Deadline

14-Jul-2026, 3:00 pm

Opening Date

14-Jul-2026, 3:30 pm

#6

Update

03-Jul-2026

Extended Deadline

07-Jul-2026, 3:00 pm

Opening Date

07-Jul-2026, 3:30 pm

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for the HPCL 1000 SCMH DCU tender in Bareilly Uttar Pradesh 2026?

Bid submission requires EMD of ₹308,000 and documents listed in the Terms & Conditions. Include company credentials, GST, PAN, experience certificates for DCU/skid installations, and OEM authorizations. Follow HPCL’s project-specific forms, ensure bid aligns with option clause allowing ±25% quantity variation, and prepare on-site commissioning and ARC maintenance plan.

What documents are required for HPCL DCU equipment procurement in UP?

Key documents include GST certificate, PAN, audited financial statements, experience certificates for DCU skid projects, EMD proof of ₹308,000, technical bid detailing commissioning plan, OEM authorization letters, and safety/training certifications. Ensure alignment with Buyer Added Terms and Conditions regarding delivery extensions.

What are the delivery terms for HPCL Bareilly 1000 SCMH DCU tender?

Delivery allows up to a 25% quantity variation during contract; delivery period begins after the last date of the original delivery order, with extended time calculated as (additional/ original) × original period, minimum 30 days. Ensure scheduling accommodates on-site commissioning and training.

What maintenance is included after warranty for HPCL DCU skids?

The contract includes 1-year ARC maintenance following the warranty period, with on-call maintenance support for the skid. Timely service during ARC is critical to sustain performance for JS GA and UP-UK CLUSTER GA deployments.

Which standards or compliance are required for the HPCL DCU bid?

The tender data does not specify formal standards; bidders should comply with standard industrial gas equipment practices and HPCL internal guidelines, ensuring safe operation, proper commissioning, and training delivery for 1000 SCMH DCU skid systems.

What is the scope of site work in this HPCL tender in Bareilly?

Scope includes on-site supervision during commissioning, performance testing, and client training for the 1000 SCMH DCU skid, plus maintenance during the ARC period. The bidder should provide a detailed commissioning plan and training schedule within the bid.

How is the ARC maintenance duration defined for HPCL DCU contracts?

ARC maintenance lasts for 1 year after the warranty period. Bidders must outline response times, visit frequency, spare part provisioning, and escalation procedures to ensure uninterrupted skid performance across JS GA and UP-UK CLUSTER GA.

What are the payment terms for HPCL De-Compression Unit procurement?

Payment terms are not specified in the data provided; bidders should refer to HPCL standard procurement terms, awaiting explicit schedule in the tender release, and prepare for milestone-based payments aligned with commissioning and acceptance.