TenderDekho Logo
Active GEM

Indian Army Tender for Clothes Dryer, Stabilizers & Conditioning Units in India 2026

Bid Publish Date

30-Aug-2026, 9:41 pm

Bid End Date

10-Sep-2026, 8:00 pm

Progress

Issue30-Aug-2026, 9:41 pm
AwardPending

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for multiple listed product categories including Clothes Dryer, Refrigerator Stabilizer, Conditioning Unit Stabilizer, Window Type Conditioning Unit, Commercial Pressure Cooker, and HDPE tarpaulin with tie downs. The scope covers Supply, Installation, Testing and Commissioning (SITC) of the goods, with a potential quantity adjustment up to 25% at contract placement and during the contract currency. The buyer requires a three-year average turnover benchmark and OEM turnover criteria, with an emphasis on domestic support for imported products. A notable differentiator is the option clause enabling expansion of order quantity at contracted rates and adjusted delivery timelines.

Key Specifications

  • Product/service names and categories: Clothes Dryer, Refrigerator Stabilizer, Conditioning Unit Stabilizer, Window Type Conditioning Unit, Commercial Pressure Cooker, HDPE tarpaulin with tie downs

  • Quantities: 6 total items; exact quantities not disclosed in BOQ

  • EMD/estimated value: Not specified in provided data; verify on bid package

  • Experience: Minimum turnover criteria over last 3 years; OEM turnover alignment for bunch bids

  • Quality/standards: OEM authorization for imported products; domestic after-sales support requirement

  • Delivery: Option to increase quantity by 25%; delivery period adjustments with minimum 30 days rule

Terms & Conditions

  • Option Clause allows ±25% quantity variation at contract and during contract

  • SITC scope includes supply, installation, testing and commissioning

  • OEM turnover criteria apply; highest-value primary product OEM must meet turnover in bunch bids

Important Clauses

Payment Terms

Not explicitly defined; bidders should confirm payment terms in bid documents and any advance payment conditions

Delivery Schedule

Delivery period may be extended based on option clause; additional time calculated as (increased quantity ÷ original quantity) × original delivery period with minimum 30 days

Penalties/Liquidated Damages

Not specified in data; bidders should review tender terms for LD if any

Bidder Eligibility

  • Minimum average annual turnover as specified for last 3 financial years

  • OEM/Authorized Seller for imported products with India after-sales support

  • Compliance with SITC scope and turnover criteria; ability to fulfill 25% quantity variation

Tender Data

Bid Details

Quantity

8

Category

Clothes Dryer

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

55

OEM Avg. Turnover

4

Past Performance

50 %

Warranty Period

15 days

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Clothes Dryer , Refrigerator Stabilizer , Conditioning unit Stabilizer , Window Type Conditioning unit , Commercial Pressure Cooker , HDPE tarpaulin with tie downs

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

SIANG WEST

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SIANG WESTSIANG WEST--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9823251.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Clothes Dryer

Clothes Dryer 5.5 kg Front Load Automatic

1 pieces Delivery: 15 days
#2

Refrigerator Stabilizer

Refrigerator Stabilizer 1.5 kVA

1 pieces Delivery: 15 days
#3

Conditioning unit Stabilizer

conditioner Stabilizer 5 kVA 90V to 270 V

1 pieces Delivery: 15 days
#4

Window Type Conditioning unit

Window Type Conditioning unit 1.5 TR

1 pieces Delivery: 15 days
#5

Commercial Pressure Cooker

Commercial Pressure Cooker 22 Litre

1 pieces Delivery: 15 days
#6

HDPE tarpaulin with tie downs

600 GSM 20x20 ft HDPE tarpaulin with tie downs

3 pieces Delivery: 15 days

Categories 8

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements or CA/Cost Accountant turnover certificate for the last 3 financial years

4

OEM authorization or Authorized Seller certificate for imported products

5

Proof of after-sales support capability in India (registered office address)

6

Experience certificates for SITC projects of similar scope

7

Technical bid documents and compliance certificates

8

Any other documents specified in bid terms (EMD details, etc.)

Frequently Asked Questions

How to bid for the Indian Army clothes dryer and stabilizer tender 2026 in India?

Bidders should confirm SITC scope, provide turnover proofs for last 3 years, submit OEM authorization for imported items, and demonstrate Indian after-sales support capability. Include documentation for 25% quantity variation and ensure compliance with OEM turnover criteria. Prepare submission with audited balances or CA/Cost Accountant certificates.

What documents are required for the Indian Army SITC tender in India?

Required documents include GST certificate, PAN, audited financial statements or CA turnover certificate, OEM authorization for imported products, proof of Indian after-sales support, relevant experience certificates, and technical bid documents. Also provide turnover proof for last 3 financial years and any tender-specific forms.

What are the key technical requirements for the included product categories in this tender?

Key requirements cover supply, installation, testing and commissioning of clothes dryer, stabilizers, conditioning units, and HDPE tarpaulins. It emphasizes OEM/Authorized Seller status for imported items and a minimum 25% quantity variation capability, plus turnover criteria for bidder and OEM.

What is the delivery schedule and option clause for this Indian Army tender?

Delivery can be adjusted via the option clause allowing up to 25% quantity variation. Additional time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days, and may extend to the original delivery period under certain conditions.

Which organizations must meet turnover criteria for this procurement in 2026?

Both the bidder and the OEM of the offered product must meet the minimum average annual turnover for the last three years ending 31st March of the previous year; if the bidder is newly formed, turnover is counted from the date of incorporation for completed years.

What compliance is required for imported products in this Army tender?

Imported products must have an OEM or Authorized Seller with a registered office in India to provide after-sales service. Submit a certificate confirming the Indian service presence as part of the bid submission.

Are installation and commissioning included in the bid scope for this procurement?

Yes, the bid scope explicitly includes Supply, Installation, Testing and Commissioning of the listed goods. Ensure your bid demonstrates capabilities for on-site installation, testing, commissioning, and post-installation support as part of SITC.

What are the payment terms and penalties associated with this tender?

Specific payment terms are not detailed in the provided data; bidders should refer to the formal bid documents for payment milestones. Penalty or LD details are not specified here; clarify liability and remedies in the tender packet.