Bid Publish Date
31-Aug-2026, 9:34 am
Bid End Date
12-Sep-2026, 2:00 pm
Location
Progress
Bharat Heavy Electricals Limited (BHEL) invites offers for the LARGE DIA. STAINLESS STEEL PIPE ASSEMBLY as per STE-Z16-603-01 for the Kaiga site. The item is non-divisible with a tentative delivery window of 240 days from QAP/document clearance. The procurement strategy emphasizes OEM manufacture, IP integrity pact, and inspection by BHEL/NPCIL. MSE bidders enjoy a 100% quantity offer if L2 equals L1+15% and QAP-compliant delivery; price bid is subject to L1/L2 matching. The order requires a TC/GC and strict vendor eligibility.
Product: LARGE DIA. STAINLESS STEEL PIPE ASSEMBLY
Standard reference: STE-Z16-603-01; PQR.NO.STE-Z16-603-05 Rev. 0
Delivery location: KAIGA SITE, KAIGA ATOMIC POWER PROJECT-5&6, KAIGA-5&6, KAIGA SITE, KARWAR, 581400
Delivery timeline: 240 days from QAP/document approval
Inspection: BHEL/NPCIL appointed agency; test and guarantee certificates required
Payment terms: 100% within 90 days of receipt; MSE adjustments apply
Delivery: 240 days post-approval; non-divisible item with +5% variation
Warranty/quality: Test and guarantee certificates required with supply
100% payment within 90 days of receipt; MSE: 45 days, MED: 60 days, subject to material acceptance
Delivery within 240 days from QAP/document clearance; direct dispatch to KAIGA site
LD at 0.5% of total order value per week of delay or part; +5% quantity variation permitted
Only manufacturers may submit bids; OEM certificate required
No debarred suppliers; compliance with Integrity Pact
Must comply with PQR.STE-Z16-603-05 Rev. 0 and QAP requirements
Quantity
144124
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
LARGE DIA. STAINLESS STEEL PIPE ASSEMBLY AS PER SPEC. STE-Z16-603-01
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
240
Delivery Locations
1
Delivery Cities
Uttara Kannada
Delivery Pincodes
581400
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Shivaputrappa Gadad | 581400,Chief Construction Engineer,Kaiga Atomic Power Project-5&6 (KAIGA-5&6) Kaiga Site, Via - Karwar, Dist- Uttar Kannada, Karnataka- 581400 | Uttara Kannada | Karnataka | 581400 | 144124 | 240 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
OEM certificate proving manufacturer status
TC/GC (test certificate / guarantee certificate) with material supply
Integrity Pact signed and sealed
PQR.NO.STE-Z16-603-05 Rev. 0 documentation
GST registration, PAN card, financial statements
Past experience certificates and inspection records
Key insights about KARNATAKA tender market
Bidders must be manufacturers with an OEM certificate and submit TC/GC; comply with PQR.STE-Z16-603-05 Rev. 0; sign and seal Integrity Pact; ensure non-debarment status; delivery to KAIGA site within 240 days after QAP approval.
BHEL offers 100% payment within 90 days of receipt; MSE bidders receive 45 days; medium enterprises get 60 days; payment is contingent on material acceptance and compliance with order terms.
Submit OEM certificate, TC/GC for the material, Integrity Pact copy, GST registration, PAN, financial statements, and experience certificates; ensure debarment status is clear and QAP requirements are met.
Delivery must be within 240 days from QAP/document clearance and is directly dispatched to the KAIGA SITE; stage-wise inspection by BHEL/NPCIL may be required.
Suppliers must furnish Test Certificate and Guarantee Certificate along with the material; ensure QC documentation aligns with STE-Z16-603-05 Rev. 0 and QAP standards.
MSE bidders get 100% quantity if their L2 price is within L1+15%; non-divisible item qualification may restrict alternates, with the vendor required to align with L1/L2 pricing dynamics.
Inspection is conducted by BHEL or BHEL-appointed TPI and NPCIL, with stage-wise checks per approved QAP; non-conformance leads to rejection before price bid opening.
An IP copy signed and sealed must accompany the offer; this aligns with CIR 2025-26 requirements and ensures ethical procurement practices during Kaiga supply.