TenderDekho Logo
Active GEM

Gujarat Electricity Board (GEB) GUVNL IS 8309 Terminal Ends for Aluminium Conductors Tender 2026

Bid Publish Date

07-Oct-2026, 5:52 pm

Bid End Date

17-Oct-2026, 6:00 pm

Progress

Issue07-Oct-2026, 5:52 pm
AwardPending

Tender Overview

Gujarat Electricity Board (GEB) under Gujarat Urja Vikas Nigam Limited (GUVNL) seeks bids for compression cable lugs used with aluminium conductors, conforming to IS 8309 (Q3). The tender scope centers on terminal ends for insulated cables, with no BOQ quantity listed, and an ambiguous estimated value. The buyer reserves a right to adjust quantities up to 25% during contract execution and to extend delivery time proportionally to added quantity, with a minimum of 30 days. A pre-supply advance sample process is mandated: five samples must be submitted within 5 days of contract award, and buyer feedback will define necessary modifications within 5 days. A Material Test Certificate must accompany each supply, and the buyer’s lab results will be the sole acceptance criteria. This tender emphasizes conformance to IS 8309 standards and supplier readiness for bulk manufacturing following approved samples.

Technical Specifications & Requirements

  • Product category: Terminal ends for aluminium conductor insulation cables (compression cable lugs)
  • Standard: IS 8309 (Q3), conforming to specified grade
  • Documentation requirement: Material Test Certificate to be sent with supply; buyer lab tests determine acceptance
  • Sample process: 5 advance samples required within 5 days of award; modifications provided within 5 days if any
  • Quantity flexibility: Option to increase order up to 25% of bid quantity during contract period
  • Delivery timing: Delivery period adjusts with quantity changes; minimum extension threshold is 30 days; original delivery period governs base timeline
  • Delivery terms: Bulk supply to comply with approved sample specifications; any deviation may trigger corrective actions or termination

Terms, Conditions & Eligibility

  • EMD/financial criteria: Not explicitly specified in data; bidders should be prepared to meet standard EMD requirements
  • Delivery & extension: Increased quantity or extended delivery window as per option clause; delivery commences from the last date of original delivery order
  • Sample approval: Advance sample approval is mandatory before bulk manufacturing; non-conformance may lead to contract termination
  • Compliance: Supplies must conform to IS 8309 (Q3); Material Test Certificate mandatory
  • Documentation: Bidders should submit GST, PAN, experience certifications, financial statements, EMD documents, and OEM authorizations as applicable
  • Warranty/penalties: Not specified in provided data; bidders should anticipate standard contractual clauses

Key Specifications

  • Product/service names: Terminal ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs)

  • Quantity/scale: Not specified in BOQ; quantity adjustment allowed up to 25% of bid quantity

  • Estimates: Estimated value not provided

  • Standards/certifications: IS 8309 (Q3) compliance required

  • Testing/quality: Material Test Certificate mandatory with every supply; buyer lab results are final

  • Delivery/installation: Delivery period tied to original delivery period; extended period calculated if quantity increases

  • Experience/credentials: No explicit years specified; bidders must comply with IS 8309 (Q3) and supply samples for approval

Terms & Conditions

  • Option Clause: quantity may vary ± up to 25% during contract execution at contracted rates

  • Advance sample process: submit 5 samples within 5 days; modifications within 5 days or contract may be terminated

  • Material Test Certificate required with supply; final acceptance based on buyer lab results

Important Clauses

Payment Terms

Not specified in data; expect standard terms per government procurement norms

Delivery Schedule

Delivery period starts from the last date of the original delivery order; extended time proportional to quantity increase with a minimum of 30 days

Penalties/Liquidated Damages

Not specified; bidders should verify in final contract terms or buyer clarification

Bidder Eligibility

  • Experience in supplying IS 8309 compliant terminal ends or compression cable lugs

  • Ability to submit and pass Material Test Certificate testing

  • Compliance with OEM authorizations if required by supplier

Advertisement

Tender Data

Bid Details

Quantity

2000

Bid Type

Two Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Terminal Ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs) Conforming To IS 8309 (Q3)

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Rajkot

Delivery Pincodes

360004

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Patel Urvashi Vasharambhai360004,Rajkot City Division-3 Store Office, RSO PGVCL, Compound , Chunarvad Chock, Near GUVNL Police Station, Dudhsagar Dairy Road, Rajkot- 360003RajkotGujarat360004200015-

Authority Records

ENERGY AND PETROCHEMICALS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

GeM-Bidding-10000578.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Gujarat Electricity Board (geb) - Gujarat Urja Vikas Nigam Limited (guvnl)

Office Name

Pgvcl

Grievance Contact

[email protected]

Categories 9

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar work

4

Financial statements (audited, if available)

5

EMD documents as per tender rules

6

Technical bid documents

7

OEM authorization (if applicable)

8

Material Test Certificate (MTC) to accompany supply

9

Any other certificates specified in terms and conditions

Frequently Asked Questions

Key insights about GUJARAT tender market

How to bid for IS 8309 terminal ends tender in Gujarat?

Bidders should prepare GST registration, PAN, experience certificates, and financials, then submit technical bid with supplier’s IS 8309 (Q3) compliance details, and Material Test Certificate. Advance five samples must be provided within 5 days of award, with buyer feedback within 5 days for modifications.

What documents are required for Gujarat GUVNL cable lug tender submission?

Required documents include GST certificate, PAN, experience certificates for similar work, audited financial statements, EMD documents, OEM authorizations (if applicable), technical bid, and Material Test Certificate to accompany all supply.

What standards must terminal ends conform to for this bid?

Suppliers must ensure IS 8309 compliance (Q3) for terminal ends used with aluminium conductors of insulated cables, with Material Test Certificate and lab verification considered final for acceptance.

When are samples due for advance approval in this tender?

Five (5) advance samples must be submitted within 5 days of contract award; Buyer will approve or list modifications within 5 days; delays may shift the delivery schedule accordingly.

What is the quantity adjustment clause in this Gujarat tender?

The purchaser may increase or decrease the quantity up to 25% of bid quantity at contract placement and may extend up to 25% during the contract at contracted rates; minimum delivery extension is 30 days.

What is the impact of not meeting Material Test Certificate requirements?

Lack of proper MTC may lead to non-acceptance by the buyer; the supply will be rejected or other penalties applied per contract terms, and deviations could trigger contract termination.

Are delivery timelines fixed if quantity remains unchanged in this tender?

Yes. If quantity remains unchanged, delivery period starts from the last date of the original delivery order; any extension due to buyer-approved modifications or delays will adjust the delivery timeframe accordingly.

Advertisement