National Institute Of Technology West Godavari Muffle Furnace Supply and Installation Tender 2026

Bid Publish Date

14-Aug-2026, 5:40 pm

Bid End Date

04-Sep-2026, 6:00 pm

EMD

₹33,000

Progress

Issue14-Aug-2026, 5:40 pm
AwardPending

Key Highlights

  • Specific brand/OEM responsibility for the muffle furnace procurement
  • 1-year OEM warranty with on-site service and commissioning
  • Turnover criteria for bidder and OEM across last 3 years
  • Mandatory data sheet upload and exact parameter verification

Tender Overview

The National Institute Of Technology (NIT) West Godavari, Andhra Pradesh invites bids for the supply, installation, testing and commissioning of a Muffle furnace. The procurement scope includes complete delivery, on-site installation, and post-installation support at the consignee location. The EMD is ₹33,000. Bidder turnover criteria apply for the last three financial years, with OEM turnover also required. The contract encompasses supply, installation, testing, and commissioning with a one-year warranty post final acceptance. This is a single-item, equipment-focused procurement with OEM warranty considerations and data-sheet verification mandatory.

Technical Specifications & Requirements

  • Product: Muffle furnace (no technical specs provided in the tender data)
  • Location: West Godavari, Andhra Pradesh 534001
  • Scope: Supply, Installation, Testing and Commissioning of the furnace
  • Data Sheet: Upload mandatory; must match offered specifications to avoid rejection
  • Warranty: 1 year from final acceptance or after installation completion
  • OEM Warranty certificates: Required at delivery
  • Turnover: Minimum average annual turnover criteria for bidder and OEM as per bid document
  • Data completeness: Include installation, training, and commissioning as part of scope
  • EMD: ₹33,000 to be deposited; terms aligned with section 5 of the bid terms

Terms, Conditions & Eligibility

  • Data Sheet verification is mandatory; mismatches can lead to bid rejection
  • Bid must include audited turnover or CA certificate for last 3 years; OEM turnover also required
  • Warranty: 1 year with on-site service during the warranty period
  • Scope extends to delivery, installation, testing, and commissioning at consignee location
  • GST considerations: bidder bears GST obligations; reimbursement as per actuals
  • No BOQ items displayed; ensure compliance with supply and installation requirements
  • Supplier must avoid liquidation or insolvency status; provide undertaking
  • The OEM of the chosen product must meet turnover criteria for bunch bids

Key Specifications

  • Product name: Muffle furnace

  • Quantity: 1 unit (implied by single-item BOQ absence)

  • Warranty: 1 year from final acceptance

  • Delivery/installation: On-site at West Godavari consignee location

  • Data Sheet alignment: Must match offered specs; mismatch triggers rejection

  • OEM turnover: Must meet either bidder or OEM turnover criteria as per bid document

  • Payment terms: GST handling and EMD₹33,000 as per terms

Terms & Conditions

  • EMD amount ₹33,000 and bank/payment method as per norms

  • 1-year warranty with OEM support and on-site service

  • Turnover criteria for bidder and OEM across last 3 years

Important Clauses

Payment Terms

GST to be paid by bidder; reimbursement as per actuals or quoted rate, whichever is lower

Delivery Schedule

Supply, installation, testing and commissioning to be completed at consignee location; no explicit dates provided

Penalties/Liquidated Damages

Not specified in the data; ensure standard L.D. terms are aligned with government tender norms

Bidder Eligibility

  • No liquidation or bankruptcy proceedings; undertakings required

  • Minimum average turnover for last 3 years as per bid document

  • OEM turnover criteria satisfied for the leading bidder in bunch bids

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

55

OEM Avg. Turnover

44

Past Performance

80 %

Warranty Period

1 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply and Installation of Muffle furnace

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

14

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

West Godavari

Delivery Pincodes

534101

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Tejavathu Ramesh534101,GEM CELL, Office of Director, NIT Andhra Pradesh, Tadepalligudem-534101, West Godavari District, A. P.West GodavariAndhra Pradesh534101160-

Authority Records

MINISTRY OF EDUCATIONHIGHER EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9750941.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Tadepalligudem

Grievance Contact

[email protected]

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Audited Balance Sheets or CA certificate indicating turnover (last 3 years)

4

OEM authorization letter (if bidding on behalf of OEM)

5

Data Sheet of the Muffle furnace offered

6

Technical bid documents and installation/training plan

7

EMD payment receipt or online payment proof

8

Certificate of non-bankruptcy or liquidation undertaking

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to bid for the muffle furnace tender in West Godavari 2026?

Bidders should submit GST registration, PAN, turnover certificates for last 3 years, OEM authorization if applicable, and the Data Sheet for the offered furnace. Include EMD ₹33,000 and a detailed installation/training plan. Ensure data-sheet match with offered specifications to avoid rejection.

What documents are required for NIT West Godavari muffle furnace bid 2026?

Required documents include GST certificate, PAN, audited turnover or CA certificate, OEM authorization, furnace Data Sheet, installation plan, EMD receipt, and technical bid. Non-compliance or mismatched parameters may lead to bid rejection; ensure data-sheet alignment with offered product.

What are the warranty terms for the muffle furnace procurement?

Warranty is 1 year from final acceptance or after installation completion. OEM warranty certificates must be provided at delivery. The seller must guarantee rectification during the warranty period and provide on-site service and training as part of the scope.

What is the EMD amount for this West Godavari tender?

The EMD required is ₹33,000. Payable as per tender terms; submission proof is mandatory with the bid. EMD supports bid validity and ensures serious bidding for the on-site supply and installation scope.

Which organization is procuring the muffle furnace in Andhra Pradesh?

The National Institute Of Technology (NIT) in West Godavari, Andhra Pradesh, under the Department of Higher Education, is seeking supply, installation, testing and commissioning of a muffle furnace for on-site use.

What is the scope of supply for this furnace tender?

Scope includes Supply, Installation, Testing and Commissioning of the muffle furnace at the consignee location, with on-site training and post-installation support. The bid must cover all cost components in the bid price.