RABharat Heavy Electricals Limited invites bids for CS GATE VALVES intended for the NTPC SIPAT STPP Stage III 1X800MW project, located in Bilaspur, Chhattisgarh. The tender specifies an option clause allowing up to 25% quantity variation, with extended delivery periods calculated by a defined formula and a minimum 30-day baseline. A critical early step requires the successful bidder to obtain Detailed Design Drawings approved within 7 days of award, with a mandatory reply window of 7 days for buyer modifications. Bidders must ensure compliance with any drawing approvals before fabrication. GST considerations are unilateral, with actual GST applied and reimbursement capped to the quoted rate. The submission must include demographic and financial credibility data, including PAN, GSTIN, canceled cheque, and EFT mandate; data sheets for offered products must align with technical parameters. The structure prioritizes compliance and prompt drawing approvals as core project milestones.
CS GATE VALVES for NTPC SIPAT STPP Stage III 1X800MW
Delivery terms linked to draw approvals with 7-day windows
Option quantity up to 25% during contract and currency
Data Sheet alignment with offered product specifications
GST handling: actual rate or quoted rate whichever is lower
Option clause allows +/- 25% quantity adjustment at contract and during currency
Detailed Design Drawings must be approved within 7 days of award
GST to be borne by bidder with reimbursement up to quoted rate
GST handling based on actuals or applicable rates; reimbursement capped to quoted GST rate
Delivery period tied to last date of original delivery order; extended period calculated as (increased quantity / original quantity) × original delivery period, minimum 30 days
LD not explicitly defined; delays due to buyer drawing approval may re-fix delivery without LD
Not under liquidation or court receivership
Valid PAN and GSTIN
End User Certificate on request
Data Sheet alignment with offered product
Start
02-Oct-2026, 12:00 pm
End
05-Oct-2026, 1:00 pm
Duration: 73 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
30
OEM Avg. Turnover
30
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
CS GATE VALVES for NTPC SIPAT STPP STAGE III 1X800MW project
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
23-May-2026, 9:30 am
Opening Date
23-May-2026, 10:00 am
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
Data Sheet of offered product
End User Certificate (in buyer’s standard format if requested)
Key insights about CHHATTISGARH tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and product data sheets. Ensure Detailed Design Drawings are approved within 7 days of award; participate with data-sheet-compliant offers and align with the option clause allowing up to 25% quantity variation.
Submit PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, and the Data Sheet of offered valves. End User Certificate should be provided in the buyer format if requested; ensure GST handling is in line with actual rates or the quoted rate.
Tender data emphasizes CS gate valves for NTPC SIPAT STPP Stage III 1X800MW with data sheet alignment. While exact valve specs are not listed, ensure offered products match the buyer-approved drawings and that data sheets reflect exact parameters to avoid rejection.
Detailed Design Drawings must be submitted within 7 days of award; buyer replies within 7 days. If buyer delays approval, the delivery period is refixed, not triggering liquidated damages during the delay period.
GST is the bidder’s responsibility; reimbursement is per actuals or the applicable rate, whichever is lower, capped to the quoted GST percentage. Ensure GSTIN is provided with bid submission.
The purchaser may increase or decrease the quantity up to 25% of the bid quantity at contract placement and during the currency, with delivery time adjusted by the specified formula ensuring a minimum of 30 days.