Bid Publish Date
30-Jan-2025, 3:37 pm
Bid End Date
10-Feb-2025, 5:00 pm
Location
Progress
RAQuantity
630
Public procurement opportunity for Bharat Heavy Electricals Limited (bhel) FOUR POLE MCB WITH ENCLOSURS, 200AMP 4P MCCB WITH ENCLOSER 25KA, MCB 16A 415V AC Triple Pole, TP 63 amps MCB, METAL CLAD SOCKET 20A 3 POLE, METAL CLAD PLUG TOP AND SOCKET OF 30 AMPS, 100 A BUSBAR, 63 A BUS BAR, RCCB 4 POLE 63 A SENSITIVITY 30mA in VISAKHAPATNAM, ANDHRA PRADESH. Quantity: 630 issued by. Submission Deadline: 10-02-2025 17: 00: 00. View full details and respond.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
FOUR POLE MCB WITH ENCLOSURS , 200AMP 4P MCCB WITH ENCLOSER 25KA , MCB 16A 415V AC Triple Pole , TP 63 amps MCB , METAL CLAD SOCKET 20A 3 POLE , METAL CLAD PLUG TOP AND SOCKET OF 30 AMPS , 100 A BUSBAR , 63 A BUS BAR , RCCB 4 POLE 63 A SENSITIVITY 30mA
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
Referenced Document
Referenced Document
Referenced Document
Referenced Document
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
09-Apr-2025, 11:00 am
End
14-Apr-2025, 11:00 am
Duration: 120 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ********** Under PMA | - | 05-02-2025 20:30:55 | |
| 2 | ********** Under PMA | - | 08-02-2025 12:42:05 | |
| 3 | ********** Under PMA | - | 08-02-2025 13:15:59 | |
| 4 | ********** Under PMA | - | 06-02-2025 13:42:19 | |
| 5 | ********** Under PMA | - | 31-01-2025 18:03:47 | |
| 6 | ********** Under PMA | - | 07-02-2025 19:35:24 | |
| 7 | ********** Under PMA | - | 10-02-2025 15:19:08 | |
| 8 | ********** Under PMA | - | 10-02-2025 15:14:33 | |
| 9 | ********** Under PMA | - | 06-02-2025 14:37:29 | |
| 10 | ********** Under PMA | - | 10-02-2025 09:22:47 | |
| 11 | ********** Under PMA | - | 10-02-2025 12:44:53 | |
| 12 | ********** Under PMA | - | 05-02-2025 17:10:16 |
Please sign in or create an account to view contract details and download result documents.
Key insights about ANDHRA PRADESH tender market
The eligibility requirements stipulate that bidders must be a legally registered entity, possess a valid GST registration, and comply with local procurement guidelines. Bidders must demonstrate appropriate experience in similar projects. MSEs may apply for exemptions from experience and turnover criteria, provided relevant supporting documents are submitted for evaluation.
Bidders must submit compliance certificates that ensure the products meet industry quality standards. This includes certifications for electrical safety and performance from recognized authorities. Furthermore, the documentation should provide evidence that the products align with the technical specifications outlined in the BoQ, thereby assuring the buyer of the integrity and reliability of the supplied components.
Bidders looking to participate in the MINIATURE CIRCUIT BREAKER tender must first ensure they are registered on the relevant procurement platform. Registration typically involves providing necessary company details, legal documentation, and verification of compliance with local norms. Once registered, bidders can submit their offers as specified in the tender documentation.
Submissions must be made in the required formats specified in the tender documents. Accepted formats generally include PDFs for supporting documents, ensuring that all submissions maintain clarity and detail. Non-compliance with document format requirements may lead to disqualification during the evaluation process.
The payment terms are generally included within the tender documents, specifying milestones for payment upon delivery and acceptance of goods. Bidders should ensure their submissions align with these terms to streamline the financial transaction processes post-award of the contract, maintaining the integrity of the procurement cycle.
Sign up now to access all documents
Main Document
Referenced Document
Referenced Document
Referenced Document
Referenced Document