Progress
Organization: Commissionerate Of Excise, Assam. The procurement targets 40kVA UPS systems, parallel card modules, battery bank sets, racks and interlinking hardware, plus an extended warranty package under I and C services. Location is Kamrup, Assam (PIN 781001). Estimated value and quantity are not disclosed; however, the contract accommodates option-based quantity variation up to 25% and extended delivery periods with a minimum baseload of 30 days. Emphasizes data sheet alignment and compliance with security/IT standards. Aimed at suppliers capable of delivering complete UPS ecosystems with OEM authorization and bundled warranty.
Product: 40kVA UPS with parallel cards
Accessories: Battery bank, rack, interlinking hardware
Warranty: Extended warranty package
Delivery: Flexible timeline with 30-day minimum
Documentation: Data Sheet alignment and Manufacturer Authorization
25% quantity variation right at contract placement and during currency
3 years govt procurement experience with relevant contracts
Data Sheet and Malicious Code Certificate mandatory
Not specified in tender; suppliers should expect standard govt payment terms post-delivery per contract
Delivery period initiates from last date of original delivery order; extended period applies with calculated time formula and minimum 30 days
Not explicitly stated; participation requires compliance with option and delivery terms
Not under liquidation or bankruptcy; undertaking to this effect must be uploaded
Minimum 3 years supply/manufacture experience of similar Govt category products
OEM Manufacturer Authorization if bidding via Distributor
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | CONVERGE SYSTEMS & SERVICES PRIVATE LIMITED Under PMA | - | 09-02-2026 10:51:52 | |
| 2 | CR Associates Under PMA | - | 09-02-2026 11:51:44 | |
| 3 | DS SYSTEMS PRIVATE LIMITED Under PMA | - | 08-02-2026 23:27:35 | |
| 4 | NUMAX ENERGY SOLUTIONS Under PMA | - | 07-02-2026 11:24:32 | |
| 5 | SunBlue Under PMA | - | 09-02-2026 11:20:49 | |
| 6 | TRANS VIRTUAL PRIVATE LIMITED Under PMA | - | 09-02-2026 11:46:04 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | DS SYSTEMS PRIVATE LIMITED(MSE,MII)( MSE Social Category:General ) Under PMA | Item Categories : 40kva UPS,Parallel card,Battery bank,rack and interlink,extended warranty,extended warranty,I and C | |
| L2 | TRANS VIRTUAL PRIVATE LIMITED (MII) Under PMA | Item Categories : 40kva UPS,Parallel card,Battery bank,rack and interlink,extended warranty,extended warranty,I and C | |
| L3 | CONVERGE SYSTEMS & SERVICES PRIVATE LIMITED (MII) Under PMA | Item Categories : 40kva UPS,Parallel card,Battery bank,rack and interlink,extended warranty,extended warranty,I and C |
Quantity
14
Category
40kva UPS
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Min. Avg. Annual Turnover
5
OEM Avg. Turnover
40
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
40kva UPS , Parallel card , Battery bank , rack and interlink , extended warranty , I and C
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
40kva UPS
40KVA Online UPS as per tender specifications with 2 years standard warranty
Parallel card
Accessories
Battery bank
Battery bank of 30 minutes backup time (31200 VAH) as per tender specifications
rack and interlink
Rack and interlinking cable for battery bank
extended warranty
1 year Extended warranty cost for UPS
extended warranty
1 year Extended warranty cost for battery
I and C
Installation & Commissioning works
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 40kva UPS | 40KVA Online UPS as per tender specifications with 2 years standard warranty | 2 | pieces | buyer_main | 60 | |
| 2 | Parallel card | Accessories | 2 | pieces | buyer_main | 60 | |
| 3 | Battery bank | Battery bank of 30 minutes backup time (31200 VAH) as per tender specifications | 2 | pieces | buyer_main | 60 | |
| 4 | rack and interlink | Rack and interlinking cable for battery bank | 2 | pieces | buyer_main | 60 | |
| 5 | extended warranty | 1 year Extended warranty cost for UPS | 2 | pieces | buyer_main | 60 | |
| 6 | extended warranty | 1 year Extended warranty cost for battery | 2 | pieces | buyer_main | 60 | |
| 7 | I and C | Installation & Commissioning works | 2 | pieces | buyer_main | 60 |
GST registration certificate
PAN card
Experience certificates from Government/PSU suppliers (minimum 3 years)
Financial statements or solvency certificate
EMD submission proof (as applicable by buyer) and bank details
Technical bid documents including Data Sheet
OEM Manufacturer Authorization or Authorized Distributor Certification
Malicious Code Certificate
Key insights about ASSAM tender market
Bidders must submit Data Sheet, Malicious Code Certificate, and OEM Authorization if using distributors. Ensure 3-year govt procurement experience, avoid liquidation, and provide GST/PAN, financials, and contractual copies. Delivery terms include a 30-day minimum and potential 25% quantity variation at contract.
Required documents include GST certificate, PAN, 3-year govt contracts proof, OEM authorization, financial statements, EMD documents, Data Sheet, and Malicious Code Certificate. Ensure the Data Sheet precisely matches offered product specifications for the 40kVA UPS with parallel cards.
Tender specifies 40kVA UPS with parallel card capability, battery bank, rack and interlink, plus extended warranty. Data Sheet alignment is mandatory; exact battery arrangements and interlink topology should be detailed in the Data Sheet and OEM documentation.
Delivery period starts from the last date of the original delivery order; if the option clause is exercised, additional time is (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Bidders must certify that hardware and software do not contain embedded malicious code and will not damage user equipment or tap data. Non-compliance can lead to breach consequences and contract termination.
Bidders or OEMs must have at least 3 years of regular manufacture/supply of similar government category products, with contract copies for each year to support this claim.
Yes. If bidding through an Authorized Distributor, an OEM Manufacturer Authorization/Certification must be provided to validate the supplier's legitimacy and product provenance.
Key criteria include non-bankruptcy status, 3-year govt procurement experience, Data Sheet alignment with offered product, Malicious Code Certificate, and OEM Authorization if applicable. Ensure documents are uploaded with bid submission.