TenderDekho Logo
Closed GEM

Uttar Pradesh Cooperative Sugar Factories Federation Limited Piston Ring and Valve Assemblies Tender Bagpat Uttar Pradesh 2026

Bid Publish Date

04-Sep-2026, 1:25 pm

Bid End Date

14-Sep-2026, 2:00 pm

Value

₹2,39,180

Progress

Issue04-Sep-2026, 1:25 pm
Award07-Oct-2026, 3:49 am

Tender Overview

The Uttar Pradesh Cooperative Sugar Factories Federation Limited invites bids for a procurement package covering multiple engine and compressor components, including Piston Ring, Gasket Set, Section Valve Assembly, Discharge Valve Assembly, Air Filter, Lube Oil Filter, Oil Wiper Ring, Packing Ring, Valve Repair Kit Suction, Valve Repair Kit Discharge, Lubrication Pump Oil Seal, and Air Compressor Model IR 2475 Tune Up Kit. The project is located in Bagpat, Uttar Pradesh 250101, with an estimated value of ₹239,180.00. The tender notes an option clause allowing quantity adjustments up to 25% during contract execution, at contracted rates. No start/end dates are provided in the data. The BOQ lists 12 items, though many entries show N/A for quantity and unit. An ATC document is referenced for bidder-specific terms. This tender requires careful attention to the option-based delivery planning and compliance with buyer-specified delivery logic.

Technical Specifications & Requirements

  • Product categories: Piston rings, gaskets, valve assemblies, filters, oil seals, wipers, packing rings, tune-up kit, air compressor components.
  • Estimated value: ₹239,180.00; EMD amount not disclosed in supplied data.
  • Delivery terms: Options to increase quantity by up to 25%; delivery period linked to original delivery timeline; calculation formula: (Increase/Original) × Original days, minimum 30 days.
  • BOQ status: 12 total items; several entries marked N/A (quantity/unit unknown).
  • ATC document: Buyer uploaded; bidders should review for any site-specific conditions.
  • Special clause: All bidders must comply with option clause and delivery-extension rules.
  • Standards/Certification: Not specified in the provided data; verify in ATC and technical bid documents.

Terms, Conditions & Eligibility

  • EMD: Not disclosed in the provided data; verify in ATC terms.
  • Delivery schedule: Contingent on option clause; minimum 30 days extension rules apply.
  • Payment terms: Not specified in the supplied data; bidders should obtain terms from ATC.
  • Documents required: GST registration, PAN, experience certificates, financial statements, and OEM authorizations as per standard tender practice; verify via ATC.
  • Eligibility criteria: Compliance with the option-based delivery terms and ability to supply the listed components; ensure alignment with local procurement norms in Bagpat.
  • Penalties/LD: Not specified; confirm in ATC and contract terms.

Key Specifications

    • Product names: Piston Ring, Gasket Set, Section Valve Assembly, Discharge Valve Assembly, Air Filter, Lube Oil Filter, Oil Wiper Ring, Packing Ring, Valve Repair Kit (Suction & Discharge), Lubrication Pump Oil Seal, Air Compressor Tune Up Kit for Model IR 2475
    • Quantity/volume: 12 items listed; exact quantities are Not Available (N/A) in the data; confirm in BOQ
    • Estimated value: ₹239,180.00
    • Delivery: Option to increase quantity up to 25%; delivery time calculated from the last date of original delivery order; minimum 30 days
    • Quality/standards: Not specified in data; verify in ATC and technical attachments
    • Warranty/AMC: Not specified; confirm in terms and ATC

Terms & Conditions

  • Option clause allows ±25% quantity adjustment at contract time

  • Delivery period starts after the last original delivery order date

  • Extended delivery time uses the specified formula with minimum 30 days

  • EMD and payment terms to be confirmed via ATC and contract terms

Important Clauses

Payment Terms

Payment terms to be defined in ATC/contract; ensure alignment with government procurement norms and delivery milestones

Delivery Schedule

Delivery period tied to original order date; option quantity adjustments may extend delivery; minimum 30 days extension if applicable

Penalties/Liquidated Damages

LD/penalties not specified in data; verify in ATC and contract documents

Bidder Eligibility

  • Must comply with option-based quantity adjustments up to 25%

  • Prove capability to supply pistons, gaskets, valve assemblies, and related components

  • Submit all standard tender documents (GST, PAN, financials, experience certificates)

Advertisement

Authority & Contact

Organization

N/a

Office Name

Lucknow

Grievance Contact

[email protected]

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Tender Data

Bid Details

Quantity

61

Category

Piston Ring

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

Piston Ring , Gasket Set , Section Valve Assembly , Discharge Valve Assembly , Air Filter , Lube Oil Filter , Oil Wiper Ring , Packing Ring , Valve Repiar Kit Suction , Valve Repiar Kit Discharge , Lubrication pump Oil Seal , Air Compressor Model IR 2475 Tune Up Kit

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

11-09-2026 13:00:00

Pre-Bid Venue

THE BAGHPAT COOPERATIVE SUGAR MILLS LTD BAGHPAT

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Baghpat

Delivery Pincodes

250609

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Satya Pal Sharma250609,The Baghpat Co- operative Sugar Mills Ltd.,BAGHPAT-250609,Distt.- Baghpat(UP) GST No. 09AAAAT0568P1ZXBaghpatUttar Pradesh250609430-

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9847480.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 12 Items Sign in for GEM prices

#1

Piston Ring

Piston Ring

4 nos Delivery: 30 days
#2

Gasket Set

Gasket Set

2 set Delivery: 30 days
#3

Section Valve Assembly

Section Valve Assembly

4 nos Delivery: 30 days
#4

Discharge Valve Assembly

Discharge Valve Assembly

4 nos Delivery: 30 days
#5

Air Filter

Air Filter

2 nos Delivery: 30 days
#6

Lube Oil Filter

Lube Oil Filter

2 nos Delivery: 30 days
#7

Oil Wiper Ring

Oil Wiper Ring

4 nos Delivery: 30 days
#8

Packing Ring

Packing Ring

12 nos Delivery: 30 days
#9

Valve Repiar Kit Suction

Valve Repiar Kit Suction

12 nos Delivery: 30 days
#10

Valve Repiar Kit Discharge

Valve Repiar Kit Discharge

12 nos Delivery: 30 days
#11

Lubrication pump Oil Seal

Lubrication pump Oil Seal

2 nos Delivery: 30 days
#12

Air Compressor Model IR 2475 Tune Up Kit

Air Compressor Model IR 2475 Tune Up Kit

1 nos Delivery: 30 days

Categories 41

Required Documents

1

GST registration

2

PAN card

3

Experience certificates for similar procurement

4

Financial statements (last 3 years)

5

EMD/Security deposit documentation (as per ATC)

6

Technical bid documents

7

OEM authorizations or dealer agreements (if required by ATC)

8

Any ISI/ISO certifications mentioned in ATC (if applicable)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for piston ring and valve assemblies tender in Bagpat UP 2026?

Bidders must submit GST, PAN, experience certificates, financial statements, and EMD as per ATC; review the ATC for delivery terms tied to the 25% quantity option. Ensure OEM authorizations and technical compliance with the listed components; delivery terms hinge on the last order date with a minimum 30 days extension.

What documents are required for Bagpat procurement of compressor parts?

Required documents include GST registration, PAN, 3-year financials, experience certificates for similar supply, EMD documentation, technical bid and OEM authorizations; ATC may add site-specific forms, so download and complete the uploaded ATC document.

What are the technical specifications for 12-item BOM in UP tender?

The BOM includes Piston Ring, Gasket Set, Valve Assemblies, Air Filter, Oil Filters, Oil Seals, Wiper Rings, and Tune-Up Kit; exact quantities are not listed in the data; verify in the BOQ and ATC for item-wise specifications and tolerances.

When is the delivery deadline for Bagpat UP security components bid?

Delivery timing depends on the original delivery order date and the option clause; extended delivery is calculated as (Increase/Original) × Original days with a 30-day minimum, per the ATC terms.

What are the EMD requirements for UP procurement of turbo kit components?

EMD amount is not disclosed in the provided data; bidders must refer to the ATC to confirm the exact EMD amount, format (DD/online), and submission deadline associated with this tender.

What standards or certifications are required for Bagpat sugar machinery parts bid?

No explicit standards are listed in the data; bidders should check the ATC for any ISI/ISO or OEM-specific certification requirements and ensure compliance in the technical bid.

How to handle quantity variability in this UP procurement tender?

If awarded, the contractor may be asked to supply up to 25% more or fewer units; quantities are adjusted at contract stage, with delivery timelines recalculated using the prescribed formula and minimum 30 days extension.

What is the role of the ATC document in this Bagpat tender?

The ATC contains bidder-specific terms, additional conditions, and any required forms; bidders must view and comply with the uploaded ATC to ensure eligibility and proper submission.

Advertisement