Progress
Heavy Engineering Corporation Limited (HEC) invites bids for the supply of Compressor Oil Grade 150 in a total quantity of 4200 Ltr to the General Custody Store, Foundry Forge Plant, Plant Plaza Road, HEC, Dhurwa, Ranchi, Jharkhand. The contract scope is limited to the supply of goods; GST considerations are per bidder’s discretion with reimbursement as per actuals or applicable rate. The bidder must provide PAN, GSTIN, a cancelled cheque, and a bank EFT mandate for bid registration. An EMD of ₹5,000 applies. The option clause allows up to 25% quantity variation at contract rates, with delivery timelines adjustable accordingly.
Product name: Compressor Oil Grade 150
Quantity: 4200 Ltr
Delivery: General Custody Store, Foundry Forge Plant, Ranchi
EMD: ₹5,000
GST: payable by bidder; reimburse per actuals or applicable rate
Invoice: in consignee name with GSTIN; GeM GST upload required
Turnover: minimum average turnover over last 3 years as per bid document
Authorization: Manufacturer authorization if bidding through distributor
EMD of ₹5,000 required for bid submission
Quantity may increase up to 25% during contract at contracted rates
Invoice must be GST-compliant and issued in consignee name
GST reimbursement per actuals or applicable rate (whichever lower); bidder bears GST; GST invoice and portal payment screenshot required on GeM
Delivery to General Custody Store, Dhurwa Ranchi; optionally extended by formula (see option clause) with minimum 30 days; actual delivery starts after last date of original/extended DO
Not specified in terms; bidder must comply with option clause and delivery timelines
Minimum average annual turnover over last 3 years as per bid document
GST registration valid for bidder entity
PAN card and bank EFT mandate available
OEM authorization if bidding through distributor
Supply of non-hazardous petroleum oil grade compliant to spec
Quantity
4200
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
4
OEM Avg. Turnover
4
Past Performance
10 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Compressor OilGrade 150 4200 Ltr
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
20
Delivery Locations
1
Delivery Cities
Ranchi
Delivery Pincodes
834004
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Usha | 834004,FP PURCHASE DEPT FFP ADM BUILDING HEAVY ENGGINEERING CORPORATION LTD DHURWA RANCHI | Ranchi | Jharkhand | 834004 | 4200 | 20 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
20-Oct-2026, 12:30 pm
Opening Date
21-Oct-2026, 12:30 pm
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate copy certified by the bank
Manufacturer Authorization/ OEM authorization for authorized distributors
Audited Balance Sheets or CA certificate showing last 3 years turnover
GST portal GST invoice copy and payment screenshot
Any other bid registration documents as per bid terms
Key insights about JHARKHAND tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate; provide OEM authorization if applicable; ensure GST handling per actuals or lower rate, and include ₹5,000 EMD. The bid covers supply of 4200 Ltr; delivery at General Custody Store, Dhurwa Ranchi. Ensure turnover meets the last 3 years requirement and provide audited statements or CA certificate.
Submit PAN, GSTIN, bank EFT mandate, cancelled cheque and OEM authorization if bidding via distributor; provide turnover evidence for last 3 years; GST invoice and GST portal payment screenshot on GeM; ensure GST applicability and consignee GSTIN on invoice.
Delivery must be to the General Custody Store, Foundry Forge Plant, Plant Plaza Road, Heavy Engineering Corporation Limited, Dhurwa, Ranchi 834004. Timelines follow the contract’s delivery period with potential extension under the option clause, minimum 30 days.
GST is to be paid by the bidder with reimbursement as actuals or the lower applicable rate; ensure the invoice is GST-compliant and uploaded with GeM portal payment screenshot. The contract price includes all costs; no separate charges except GST adjustments.
The Earnest Money Deposit is ₹5,000. It must be provided as part of bid submission and retained per tender terms. It demonstrates bidder seriousness and secures performance compliance during evaluation.
Provide the last 3 years’ audited balance sheets or a CA/Cost Accountant certificate indicating turnover; these documents must show average annual turnover at or above the bid’s minimum requirement and be uploaded with the bid along with GST and PAN documentation.
The purchaser may increase or decrease quantity by up to 25% at the contracted rate during placement or currency of contract. Delivery timelines adjust using the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
If bidding through an authorized distributor, provide Manufacturer Authorization with OEM details (name, designation, address, email, phone). This ensures eligibility when the bidder is not the manufacturer of Grade 150 compressor oil.