GEM Active

Rigid Plain Conduits of Insulating Materials as per IS 9537 (Part 3),Rigid Plain Conduits of Insula

Deadline

23 Oct 2025

Location

PAPUM PARE, ARUNACHAL PRADESH

Rigid Plain Conduits of Insulating Materials as per IS 9537 (Part 3),Rigid Plain Conduits of Insula

Tender Key Details

Organization

North Eastern Electric Power Corporation Limited

Department

NORTH EASTERN ELECTRIC POWER Corporation Limited

Quantity

706

Bid Validity

120 (Days)

Bid Type

Two Packet Bid

Tender Overview

Rigid Plain Conduits of Insulating Materials as per IS 9537 (Part 3),Rigid Plain Conduits of Insula

Important Timeline

Start: 13 Oct 2025

End: 23 Oct 2025

AI-Powered Bidder Prediction

Discover which companies are most likely to bid

Live Analysis

Unlock Bidder Insights

Get AI-powered predictions about which companies are most likely to bid on this tender

Additional Information

Rigid Plain Conduits of Insulating Materials as per IS 9537 (Part 3),Rigid Plain Conduits of Insula

Item Category

Rigid Plain Conduits of Insulating Materials as per IS 9537 (Part 3) (Q3) , Cable Trunking and Ducting system for Electrical Installations (Wiring duct) (Q3) , Switch Fuse Unit (Q3)

Organization Details

Authority

Organization

North Eastern Electric Power Corporation Limited

Department

NORTH EASTERN ELECTRIC POWER Corporation Limited

Ministry

Ministry of Power

Contact

State

ARUNACHAL PRADESH

Documents & Downloads

GeM-Bidding-8464009.pdf

Main Document

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents from Seller

Experience Criteria,Past Performance,Bidder Turnover,OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Additional Info

Evaluation Method

Total value wise evaluation

Inspection Required

No

Arbitration

No

Bid to RA

Yes