TenderDekho Logo
Active GEM

Bids are Invited For 1 LOCKING BOLT RH,2 ADJUSTABLE WASHER,3 BODY,4 BODY,5 BODY,6 BODY,7 BODY,8 BODY,9 BODY,10 BODY,11 B in NASHIK, MAHARASHTRA

Bid Publish Date

29-Jul-2026, 5:31 pm

Bid End Date

04-Sep-2026, 5:00 pm

Generate Docs

Progress

Issue29-Jul-2026, 5:31 pm
Corrigendum29-Aug-2026
AwardPending

Public procurement opportunity for Hindustan Aeronautics Limited (hal) 1 LOCKING BOLT RH, 2 ADJUSTABLE WASHER, 3 BODY, 4 BODY, 5 BODY, 6 BODY, 7 BODY, 8 BODY, 9 BODY, 10 BODY, 11 BODY, 12 BODY, 13 BODY, 14 BODY, 15 BODY, 16 BODY, 17 BODY, 18 BODY, 19 BODY, 20 BODY, 21 BODY, 22 BODY, 23 BODY, 24 BODY, 25 BODY, 26 BODY, 27 BODY, 28 BODY, 29 BODY, 30 BODY, 31 BODY, 32 BODY, 33 BODY, 34 BODY, 35 BODY, 36 BODY, 37 BODY, 38 BODY THROTTLE ASSEMBLY, 39 BODY THROTTLE ASSEMBLY, 40 BODY OF LOCK ON STRINGER LH, 41 BODY OF SUMP, 42 BOLT, 43 BOLT, 44 BOLT, 45 BOLT, 46 BOLT, 47 BOLT, 48 BOLT, 49 BOLT, 50 BOLT, 51 BOLT, 52 BOLT, 53 BOLT, 54 BOLT, 55 BOLT, 56 BOLT, 57 BOLT, 58 BUSH, 59 BUSH, 60 BUSH, 61 BUSH, 62 BUSH, 63 BUSH, 64 BUSH, 65 BUSH, 66 BUSH, 67 BUSH, 68 BUSH, 69 BUSH, 70 BUSH, 71 BUSH, 72 BUSH, 73 BUSH, 74 BUSH, 75 BUSH, 76 BUSH, 77 BUSH, 78 BUSH, 79 BUSH, 80 BUSH, 81 BUSH, 82 BUSH, 83 BUSH, 84 BUSH, 85 BUSH, 86 BUSH, 87 BUSH, 88 BUSH, 89 BUSH, 90 BUSH, 91 BUSH, 92 BUSH, 93 BUSH, 94 BUSH THROTTLE ASSLY, 95 BUSHING, 96 EXTERNAL RING, 97 FASTENING BOLT RH, 98 FASTENING BOLTRH, 99 GASKET, 100 GASKET, 101 GASKET, 102 GASKET, 103 INTERNAL RING, 104 MIXING CHAMBER, 105 NUT, 106 NUT, 107 NUT, 108 NUT, 109 NUT, 110 NUT, 111 NUT, 112 NUT, 113 NUT, 114 NUT, 115 NUT, 116 NUT, 117 NUT, 118 NUT, 119 NUT, 120 NUT, 121 NUT, 122 NUT, 123 NUT, 124 NUT 50-OST1-1 B125 B1530101-71, 125 NUT 56-OST1-10101-71, 126 NUT 63-OST1-10101-71, 127 PACKING, 128 PACKING, 129 PLUG, 130 PLUG, 131 PLUG, 132 PLUG, 133 PLUG, 134 PLUG, 135 PLUG, 136 PROTECTIVE SEALING, 137 PUMP BODY, 138 RADIUS WASHER, 139 RING, 140 RING, 141 RING, 142 RING, 143 RING, 144 RING, 145 RING, 146 RING, 147 RING, 148 RING, 149 RING 1-1-1-OST1-10429- 71, 150 RING THROTTLE ASSEMBLY, 151 SEMI RING, 152 SPACER, 153 SPACER, 154 STOPPER, 155 STOPPER, 156 STOPPER, 157 STOPPER, 158 STOPPER THROTTLE ASSLY, 159 STUD ASSEMBLY, 160 SUPPORT, 161 SUPPORT, 162 SUPPORT, 163 SUPPORT, 164 Technological bolt, 165 THREADED WASHER, 166 TUBE, 167 WASHER, 168 WASHER, 169 WASHER, 170 WASHER, 171 WASHER, 172 WASHER, 173 WASHER, 174 WASHER, 175 WASHER, 176 WASHER, 177 WASHER, 178 WASHER, 179 WASHER, 180 WASHER, 181 WASHER, 182 WASHER, 183 WASHER, 184 WASHER THROTTLE ASSEMBLY in NASHIK, MAHARASHTRA. Quantity: 8955 issued by. Submission Deadline: 04-09-2026 17: 00: 00. View full details and respond.

Tender Data

Bid Details

Quantity

8955

Category

1 LOCKING BOLT RH

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

1 LOCKING BOLT RH , 2 ADJUSTABLE WASHER , 3 BODY , 4 BODY , 5 BODY , 6 BODY , 7 BODY , 8 BODY , 9 BODY , 10 BODY , 11 BODY , 12 BODY , 13 BODY , 14 BODY , 15 BODY , 16 BODY , 17 BODY , 18 BODY , 19 BODY , 20 BODY , 21 BODY , 22 BODY , 23 BODY , 24 BODY , 25 BODY , 26 BODY , 27 BODY , 28 BODY , 29 BODY , 30 BODY , 31 BODY , 32 BODY , 33 BODY , 34 BODY , 35 BODY , 36 BODY , 37 BODY , 38 BODY THROTTLE ASSEMBLY , 39 BODY THROTTLE ASSEMBLY , 40 BODY OF LOCK ON STRINGER LH , 41 BODY OF SUMP , 42 BOLT , 43 BOLT , 44 BOLT , 45 BOLT , 46 BOLT , 47 BOLT , 48 BOLT , 49 BOLT , 50 BOLT , 51 BOLT , 52 BOLT , 53 BOLT , 54 BOLT , 55 BOLT , 56 BOLT , 57 BOLT , 58 BUSH , 59 BUSH , 60 BUSH , 61 BUSH , 62 BUSH , 63 BUSH , 64 BUSH , 65 BUSH , 66 BUSH , 67 BUSH , 68 BUSH , 69 BUSH , 70 BUSH , 71 BUSH , 72 BUSH , 73 BUSH , 74 BUSH , 75 BUSH , 76 BUSH , 77 BUSH , 78 BUSH , 79 BUSH , 80 BUSH , 81 BUSH , 82 BUSH , 83 BUSH , 84 BUSH , 85 BUSH , 86 BUSH , 87 BUSH , 88 BUSH , 89 BUSH , 90 BUSH , 91 BUSH , 92 BUSH , 93 BUSH , 94 BUSH THROTTLE ASSLY , 95 BUSHING , 96 EXTERNAL RING , 97 FASTENING BOLT RH , 98 FASTENING BOLTRH , 99 GASKET , 100 GASKET , 101 GASKET , 102 GASKET , 103 INTERNAL RING , 104 MIXING CHAMBER , 105 NUT , 106 NUT , 107 NUT , 108 NUT , 109 NUT , 110 NUT , 111 NUT , 112 NUT , 113 NUT , 114 NUT , 115 NUT , 116 NUT , 117 NUT , 118 NUT , 119 NUT , 120 NUT , 121 NUT , 122 NUT , 123 NUT , 124 NUT 50-OST1-1 B125 B1530101-71 , 125 NUT 56-OST1-10101-71 , 126 NUT 63-OST1-10101-71 , 127 PACKING , 128 PACKING , 129 PLUG , 130 PLUG , 131 PLUG , 132 PLUG , 133 PLUG , 134 PLUG , 135 PLUG , 136 PROTECTIVE SEALING , 137 PUMP BODY , 138 RADIUS WASHER , 139 RING , 140 RING , 141 RING , 142 RING , 143 RING , 144 RING , 145 RING , 146 RING , 147 RING , 148 RING , 149 RING 1-1-1-OST1-10429- 71 , 150 RING THROTTLE ASSEMBLY , 151 SEMI RING , 152 SPACER , 153 SPACER , 154 STOPPER , 155 STOPPER , 156 STOPPER , 157 STOPPER , 158 STOPPER THROTTLE ASSLY , 159 STUD ASSEMBLY , 160 SUPPORT , 161 SUPPORT , 162 SUPPORT , 163 SUPPORT , 164 Technological bolt , 165 THREADED WASHER , 166 TUBE , 167 WASHER , 168 WASHER , 169 WASHER , 170 WASHER , 171 WASHER , 172 WASHER , 173 WASHER , 174 WASHER , 175 WASHER , 176 WASHER , 177 WASHER , 178 WASHER , 179 WASHER , 180 WASHER , 181 WASHER , 182 WASHER , 183 WASHER , 184 WASHER THROTTLE ASSEMBLY

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

300

Delivery Locations

1

Delivery Cities

Nashik

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-NashikNashik--15300-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9680071.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

29-Aug-2026

Extended Deadline

04-Sep-2026, 11:30 am

Opening Date

04-Sep-2026, 12:00 pm

Bill of Quantities (BOQ) 184 Items Sign in for GEM prices

#1

1 LOCKING BOLT RH

11.0201.3.821.900

15 nos Delivery: 300 days
#2

2 ADJUSTABLE WASHER

11.4100.7.012.007

30 nos Delivery: 300 days
#3

3 BODY

10.99.10.0131.900

15 nos Delivery: 300 days
#4

4 BODY

11.0730.0.311.900

15 nos Delivery: 300 days
#5

5 BODY

11.0730.3.381.900

15 nos Delivery: 300 days
#6

6 BODY

11.0730.3.391.900

15 nos Delivery: 300 days
#7

7 BODY

11.0730.4.351.900

15 nos Delivery: 300 days
#8

8 BODY

11.0730.4.911.900

15 nos Delivery: 300 days
#9

9 BODY

11.0770.3.069.900

15 nos Delivery: 300 days
#10

10 BODY

11.0770.4.301.900

15 nos Delivery: 300 days
#11

11 BODY

11.0770.4.531.001

15 nos Delivery: 300 days
#12

12 BODY

11.0770.4.531.002

15 nos Delivery: 300 days
#13

13 BODY

11.6100.3.991.900

45 nos Delivery: 300 days
#14

14 BODY

11.6110.3.113.900

30 nos Delivery: 300 days
#15

15 BODY

11.6110.I.005.001

75 nos Delivery: 300 days
#16

16 BODY

11.6110.I.005.002

30 nos Delivery: 300 days
#17

17 BODY

11.6120.3.915.001

15 nos Delivery: 300 days
#18

18 BODY

11.6120.I.040.002

15 nos Delivery: 300 days
#19

19 BODY

11.6121.3.042.900

60 nos Delivery: 300 days
#20

20 BODY

11.6121.3.909.900

60 nos Delivery: 300 days
#21

21 BODY

11.6121.3.917.900

15 nos Delivery: 300 days
#22

22 BODY

11.6122.3.140.001

15 nos Delivery: 300 days
#23

23 BODY

11.6122.3.361.900

30 nos Delivery: 300 days
#24

24 BODY

11.6130.3.008.900

30 nos Delivery: 300 days
#25

25 BODY

11.6130.5.416.900

15 nos Delivery: 300 days
#26

26 BODY

11.6140.3.001.003

15 nos Delivery: 300 days
#27

27 BODY

11.6140.3.526.900

60 nos Delivery: 300 days
#28

28 BODY

11.6150.I.003.900

15 nos Delivery: 300 days
#29

29 BODY

11.7404.W.313.900

90 nos Delivery: 300 days
#30

30 BODY

11.7520.I.176.900

30 nos Delivery: 300 days
#31

31 BODY

11.7601.7.106.900

15 nos Delivery: 300 days
#32

32 BODY

11.8107.3.078.900

15 nos Delivery: 300 days
#33

33 BODY

11.8110.8.021.900

15 nos Delivery: 300 days
#34

34 BODY

11.8110.8.022.900

15 nos Delivery: 300 days
#35

35 BODY

30.6100.0023.025

15 nos Delivery: 300 days
#36

36 BODY

30.6100.8079.900

120 nos Delivery: 300 days
#37

37 BODY

30.7200.1220.001

15 nos Delivery: 300 days
#38

38 BODY THROTTLE ASSEMBLY

11.6501.I.241.900

30 nos Delivery: 300 days
#39

39 BODY THROTTLE ASSEMBLY

11.6501.I.255.003

30 nos Delivery: 300 days
#40

40 BODY OF LOCK ON STRINGER LH

11.0201.3.822.005

15 nos Delivery: 300 days
#41

41 BODY OF SUMP

30.7750.8035.900

15 nos Delivery: 300 days
#42

42 BOLT

11.0730.4.262.900

30 nos Delivery: 300 days
#43

43 BOLT

11.2003.3.101.003

30 nos Delivery: 300 days
#44

44 BOLT

11.2003.3.102.900

120 nos Delivery: 300 days
#45

45 BOLT

11.2003.3.111.900

30 nos Delivery: 300 days
#46

46 BOLT

11.2003.7.106.001

90 nos Delivery: 300 days
#47

47 BOLT

11.2003.7.106.003

30 nos Delivery: 300 days
#48

48 BOLT

11.2003.7.208.900

60 nos Delivery: 300 days
#49

49 BOLT

11.3000.I.506.900

30 nos Delivery: 300 days
#50

50 BOLT

11.3000.I.821.900

30 nos Delivery: 300 days
#51

51 BOLT

11.5002.0.040.007

60 nos Delivery: 300 days
#52

52 BOLT

11.5002.1.035.001

60 nos Delivery: 300 days
#53

53 BOLT

11.5100.I.371.900

15 nos Delivery: 300 days
#54

54 BOLT

11.5101.I.508.900

30 nos Delivery: 300 days
#55

55 BOLT

11.5204.I.221.900

30 nos Delivery: 300 days
#56

56 BOLT

11.5302.I.812.900

60 nos Delivery: 300 days
#57

57 BOLT

11.5311.I.101.900

60 nos Delivery: 300 days
#58

58 BUSH

10.99.10.0136.900

15 nos Delivery: 300 days
#59

59 BUSH

11.0201.0.004.900

90 nos Delivery: 300 days
#60

60 BUSH

11.0610.3.808.900

30 nos Delivery: 300 days
#61

61 BUSH

11.0634.4.801.900

240 nos Delivery: 300 days
#62

62 BUSH

11.0642.3.801.900

30 nos Delivery: 300 days
#63

63 BUSH

11.0730.3.292.900

15 nos Delivery: 300 days
#64

64 BUSH

11.0730.3.948.900

30 nos Delivery: 300 days
#65

65 BUSH

11.0730.4.042.900

30 nos Delivery: 300 days
#66

66 BUSH

11.0740.0.208.001

15 nos Delivery: 300 days
#67

67 BUSH

11.0740.0.208.002

15 nos Delivery: 300 days
#68

68 BUSH

11.0770.0.019.900

15 nos Delivery: 300 days
#69

69 BUSH

11.0770.3.119.900

30 nos Delivery: 300 days
#70

70 BUSH

11.0770.4.186.900

30 nos Delivery: 300 days
#71

71 BUSH

11.3611.I.251.900

30 nos Delivery: 300 days
#72

72 BUSH

11.4210.0.051.900

30 nos Delivery: 300 days
#73

73 BUSH

11.4210.0.052.900

15 nos Delivery: 300 days
#74

74 BUSH

11.5001.I.027.900

30 nos Delivery: 300 days
#75

75 BUSH

11.5004.I.801.900

30 nos Delivery: 300 days
#76

76 BUSH

11.5004.I.802.900

30 nos Delivery: 300 days
#77

77 BUSH

11.5101.I.106.003

15 nos Delivery: 300 days
#78

78 BUSH

11.5200.0.004.900

30 nos Delivery: 300 days
#79

79 BUSH

11.5305.3.656.001

90 nos Delivery: 300 days
#80

80 BUSH

11.5305.3.656.002

30 nos Delivery: 300 days
#81

81 BUSH

11.5305.3.681.900

30 nos Delivery: 300 days
#82

82 BUSH

11.6121.3.907.900

75 nos Delivery: 300 days
#83

83 BUSH

11.7121.2.056.900

60 nos Delivery: 300 days
#84

84 BUSH

11.8102.3.058.900

15 nos Delivery: 300 days
#85

85 BUSH

11.8102.3.926.900

15 nos Delivery: 300 days
#86

86 BUSH

11.8107.3.086.900

15 nos Delivery: 300 days
#87

87 BUSH

11.8110.8.011.900

15 nos Delivery: 300 days
#88

88 BUSH

11.8806.4.009.900

60 nos Delivery: 300 days
#89

89 BUSH

30.6100.8024.900

75 nos Delivery: 300 days
#90

90 BUSH

30.7200.2066.900

450 nos Delivery: 300 days
#91

91 BUSH

E10.5301.0081.009

15 nos Delivery: 300 days
#92

92 BUSH

E10.5301.0081.011

15 nos Delivery: 300 days
#93

93 BUSH

E10.5301.0081.013

15 nos Delivery: 300 days
#94

94 BUSH THROTTLE ASSLY

11.6501.4.011.900

30 nos Delivery: 300 days
#95

95 BUSHING

11.0730.3.394.900

30 nos Delivery: 300 days
#96

96 EXTERNAL RING

11.0730.4.801.900

15 nos Delivery: 300 days
#97

97 FASTENING BOLT RH

11.0201.3.819.900

15 nos Delivery: 300 days
#98

98 FASTENING BOLTRH

11.0201.3.818.900

15 nos Delivery: 300 days
#99

99 GASKET

11.6170.0.162.900

15 nos Delivery: 300 days
#100

100 GASKET

11.7520.I.181.900

60 nos Delivery: 300 days
#101

101 GASKET

11.7601.I.039.900

30 nos Delivery: 300 days
#102

102 GASKET

30.4100.8020.001

480 nos Delivery: 300 days
#103

103 INTERNAL RING

11.0730.4.291.900

15 nos Delivery: 300 days
#104

104 MIXING CHAMBER

11.6110.3.803.900

30 nos Delivery: 300 days
#105

105 NUT

11.0740.3.002.900

15 nos Delivery: 300 days
#106

106 NUT

11.0770.0.073.900

15 nos Delivery: 300 days
#107

107 NUT

11.5003.3.506.900

30 nos Delivery: 300 days
#108

108 NUT

11.5316.3.211.900

90 nos Delivery: 300 days
#109

109 NUT

11.6103.3.002.900

30 nos Delivery: 300 days
#110

110 NUT

11.6126.I.801.900

60 nos Delivery: 300 days
#111

111 NUT

11.6160.5.004.900

15 nos Delivery: 300 days
#112

112 NUT

11.7404.W.314.900

240 nos Delivery: 300 days
#113

113 NUT

11.8102.3.806.900

15 nos Delivery: 300 days
#114

114 NUT

3.13866.000016.0

60 nos Delivery: 300 days
#115

115 NUT

3.14028.000032.0

90 nos Delivery: 300 days
#116

116 NUT

30.6100.0051.005

120 nos Delivery: 300 days
#117

117 NUT

30.7600.0523.011

210 nos Delivery: 300 days
#118

118 NUT

30.7800.0312.003

60 nos Delivery: 300 days
#119

119 NUT

30.7810.0156.900

30 nos Delivery: 300 days
#120

120 NUT

N430.7604.0001

30 nos Delivery: 300 days
#121

121 NUT

N430.7604.0002

30 nos Delivery: 300 days
#122

122 NUT

N430-7602-0004

30 nos Delivery: 300 days
#123

123 NUT

30.6100.0178.043

15 nos Delivery: 300 days
#124

124 NUT 50-OST1-1 B125 B1530101-71

3.10101.000050.0

30 nos Delivery: 300 days
#125

125 NUT 56-OST1-10101-71

3.10101.000056.0

30 nos Delivery: 300 days
#126

126 NUT 63-OST1-10101-71

3.10101.000063.0

45 nos Delivery: 300 days
#127

127 PACKING

11.7601.7.118.900

15 nos Delivery: 300 days
#128

128 PACKING

11.8104.3.935.009

15 nos Delivery: 300 days
#129

129 PLUG

11.0730.3.342.900

15 nos Delivery: 300 days
#130

130 PLUG

11.0730.4.040.001

30 nos Delivery: 300 days
#131

131 PLUG

11.5301.I.063.900

30 nos Delivery: 300 days
#132

132 PLUG

11.5313.3.746.900

210 nos Delivery: 300 days
#133

133 PLUG

11.5313.7.076.900

120 nos Delivery: 300 days
#134

134 PLUG

E10.0740.4153.900

15 nos Delivery: 300 days
#135

135 PLUG

E10.5301.I001.900

60 nos Delivery: 300 days
#136

136 PROTECTIVE SEALING

11.5301.3.901.900

105 nos Delivery: 300 days
#137

137 PUMP BODY

11.6126.3.921.001

30 nos Delivery: 300 days
#138

138 RADIUS WASHER

11.7401.F.866.900

15 nos Delivery: 300 days
#139

139 RING

11.0740.3.240.001

15 nos Delivery: 300 days
#140

140 RING

11.6200.I.821.900

135 nos Delivery: 300 days
#141

141 RING

11.7404.W.302.900

270 nos Delivery: 300 days
#142

142 RING

11.7404.W.303.900

270 nos Delivery: 300 days
#143

143 RING

11.7510.I.315.001

30 nos Delivery: 300 days
#144

144 RING

11.7602.7.106.900

15 nos Delivery: 300 days
#145

145 RING

11.8107.3.202.900

15 nos Delivery: 300 days
#146

146 RING

30.7600.8029.900

60 nos Delivery: 300 days
#147

147 RING

N430-7602-0002

30 nos Delivery: 300 days
#148

148 RING

N430-7602-0003

30 nos Delivery: 300 days
#149

149 RING 1-1-1-OST1-10429-71

3.10429.001001.1

60 nos Delivery: 300 days
#150

150 RING THROTTLE ASSEMBLY

11.6501.4.111.900

60 nos Delivery: 300 days
#151

151 SEMI RING

30.6100.0052.900

270 nos Delivery: 300 days
#152

152 SPACER

11.5317.I.811.900

60 nos Delivery: 300 days
#153

153 SPACER

30.5100.8031.055

30 nos Delivery: 300 days
#154

154 STOPPER

11.0740.0.256.900

15 nos Delivery: 300 days
#155

155 STOPPER

11.0770.3.082.900

15 nos Delivery: 300 days
#156

156 STOPPER

11.8107.3.072.900

15 nos Delivery: 300 days
#157

157 STOPPER

11.8107.3.112.900

15 nos Delivery: 300 days
#158

158 STOPPER THROTTLE ASSLY

11.6501.4.004.900

120 nos Delivery: 300 days
#159

159 STUD ASSEMBLY

E10.0730.3013.000

15 nos Delivery: 300 days
#160

160 SUPPORT

11.0740.0.263.900

15 nos Delivery: 300 days
#161

161 SUPPORT

11.0770.4.256.900

15 nos Delivery: 300 days
#162

162 SUPPORT

11.6800.3.007.900

150 nos Delivery: 300 days
#163

163 SUPPORT

11.8102.3.057.900

15 nos Delivery: 300 days
#164

164 Technological bolt

11.1005.7.008.900

30 nos Delivery: 300 days
#165

165 THREADED WASHER

11.0740.3.928.900

30 nos Delivery: 300 days
#166

166 TUBE

11.0795.I.046.900

30 nos Delivery: 300 days
#167

167 WASHER

11.0730.3.137.001

15 nos Delivery: 300 days
#168

168 WASHER

11.0730.3.137.003

30 nos Delivery: 300 days
#169

169 WASHER

11.0740.0.244.900

30 nos Delivery: 300 days
#170

170 WASHER

11.0740.4.973.900

15 nos Delivery: 300 days
#171

171 WASHER

11.3000.I.504.900

120 nos Delivery: 300 days
#172

172 WASHER

11.4960.3.014.900

15 nos Delivery: 300 days
#173

173 WASHER

11.5050.I.363.900

60 nos Delivery: 300 days
#174

174 WASHER

11.5100.I.007.900

30 nos Delivery: 300 days
#175

175 WASHER

11.5301.0.057.900

120 nos Delivery: 300 days
#176

176 WASHER

11.5301.7.163.900

60 nos Delivery: 300 days
#177

177 WASHER

11.6103.3.008.900

30 nos Delivery: 300 days
#178

178 WASHER

11.6110.0.003.900

15 nos Delivery: 300 days
#179

179 WASHER

11.6110.5.048.900

30 nos Delivery: 300 days
#180

180 WASHER

11.6140.I.801.900

15 nos Delivery: 300 days
#181

181 WASHER

11.7601.7.122.900

15 nos Delivery: 300 days
#182

182 WASHER

11.7601.K.187.900

15 nos Delivery: 300 days
#183

183 WASHER

30.4100.8039.900

120 nos Delivery: 300 days
#184

184 WASHER THROTTLE ASSEMBLY

11.6501.4.031.900

30 nos Delivery: 300 days

Categories 19

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

2

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer