TenderDekho Logo
GEM

Open Tender for Supply Installation Testing and Commissioning of Split AC 1 point 5T,Suppl Installation Testing and in JORHAT, ASSAM

Bid Publish Date

28-Feb-2025, 4:32 pm

Bid End Date

21-Mar-2025, 5:00 pm

EMD

₹32,000

Location

Progress

Issue28-Feb-2025, 4:32 pm
Technical20-03-2025 21:58:32
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

27

Bid Type

Two Packet Bid

Categories 15

Brahmaputra Board Guwahati Assam announces a tender for Supply Installation Testing and Commissioning of Split AC 1 point 5T, Suppl Installation Testing and Commissioning of Split AC 2 T, Supply Installation Testing and Commissioning of Split AC 2. 5 Ton 3 star, Supply Installation Testing and Commissioning of Tower air conditioner 2Ton 3 star, Insulation of refrigerant pipigs ducts and replace with nitrile rubber Job in JORHAT, ASSAM. Quantity: 27. Submission Deadline: 21-03-2025 17: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply Installation Testing and Commissioning of Split AC 1 point 5T , Suppl Installation Testing and Commissioning of Split AC 2 T , Supply Installation Testing and Commissioning of Split AC 2.5 Ton 3 star , Supply Installation Testing and Commissioning of Tower air conditioner 2Ton 3 star , Insulation of refrigerant pipigs ducts and replace with nitrile rubber Job

Authority Records

MINISTRY OF JAL SHAKTIBRAHMAPUTRA BOARD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-7560525.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Supply Installation Testing and Commissioning of Split AC 1 point 5T

As per specification

9 pieces Delivery: 30 days
#2

Suppl Installation Testing and Commissioning of Split AC 2 T

As per specification

12 pieces Delivery: 30 days
#3

Supply Installation Testing and Commissioning of Split AC 2.5 Ton 3 star

As per specification

1 pieces Delivery: 30 days
#4

Supply Installation Testing and Commissioning of Tower air conditioner 2Ton 3 star

As per specification

4 pieces Delivery: 30 days
#5

Insulation of refrigerant pipigs ducts and replace with nitrile rubber Job

As per specification

1 pieces Delivery: 30 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
COMCAT   Under PMA
-20-03-2025 21:58:32
2
COMPETENT ENGINEERS   Under PMA
-06-03-2025 18:55:18
3
D R MERCANTILE   Under PMA
-21-03-2025 14:10:57
4
PARTH ENERGY SYSTEMS PRIVATE LIMITED   Under PMA
-20-03-2025 17:15:01
5
WIMAX   Under PMA
-21-03-2025 16:10:28
6
Wood World   Under PMA
-21-03-2025 16:16:03

Frequently Asked Questions

Key insights about ASSAM tender market

What are the eligibility requirements for participation in the Supply Installation Testing and Commissioning of Split AC tender?

The eligibility requirements include being a registered entity recognized by the concerned authorities. Bidders must also possess relevant experience in HVAC systems, specifically in the installation and maintenance of Split AC units. References detailing past projects completed successfully within the last three years are necessary to showcase capability.

What are the required certificates for the Supply Installation Testing and Commissioning of Split AC?

Bidders must provide various certificates such as ISO certifications and compliance certificates for quality standards applicable to HVAC systems. These documents validate the technical competency and adherence to prescribed quality standards throughout the project lifecycle.

What is the registration process to participate in the Supply Installation Testing and Commissioning of Split AC tender?

The registration process requires interested parties to complete a detailed application form, submit required documents, and pay the necessary fees as specified in the tender notice. All documents should be in a specific format as detailed in the submission guidelines.

What Earnest Money Deposit (EMD) is required for the Supply Installation Testing and Commissioning of Split AC tender?

The Earnest Money Deposit (EMD) amount is stipulated within the tender documents and must be submitted along with the bid. This deposit serves to ensure that the bidders are serious and committed to the proposal made.

What are the benefits for Micro, Small, and Medium Enterprises (MSEs) participating in the Supply Installation Testing and Commissioning of Split AC tender?

MSEs stand to gain significant benefits by participating in this tender, including exemptions or reductions from the EMD requirements and favorable conditions during the evaluation process. The tender is designed to encourage local participation, aligning with the Make in India initiative and advocating for local content in procurement.