TenderDekho Logo
Active GEM

Procurement Opportunity: Mobilisation Phase I,Mobilisation Phase I,Work facilities,Dismantling of concrete,Construction of t in PAPUM PARE, ARUNACHAL PRADESH

Bid Publish Date

01-Aug-2026, 10:01 am

Bid End Date

17-Aug-2026, 8:00 pm

EMD

₹5,64,910

Value

₹2,82,45,500

Location

PAPUM PARE , ARUNACHAL PRADESH

Progress

Issue01-Aug-2026, 10:01 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

277

Category

top seal beam installation

Bid Type

Two Packet Bid

Categories 63

North Eastern Electric Power Corporation Limited announces a tender for Mobilisation Phase I, Work facilities, Dismantling of concrete, Construction of the groove, 1st stage Anchors, top seal beam installation, additional structural support, Rectification by grinding, Rectification by cladding, Rectification by weld build up, M-35 grade of concrete placement, Miscellaneous metal works in PAPUM PARE, ARUNACHAL PRADESH. Quantity: 277. Submission Deadline: 17-08-2026 20: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Mobilisation Phase I , Work facilities , Dismantling of concrete , Construction of the groove , 1st stage Anchors , top seal beam installation , additional structural support , Rectification by grinding , Rectification by cladding , Rectification by weld build up , M-35 grade of concrete placement , Miscellaneous metal works

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

540

Delivery Locations

1

Delivery Cities

Papum Pare

Delivery Pincodes

791112

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
AVIRAL LAKHERA791112,JAMPA COLONY, DAM SITE , PAPUMPARE, ARUNACHAL PRADESHPapum PareArunachal Pradesh7911121540-

Authority Records

MINISTRY OF POWERNORTH EASTERN ELECTRIC POWER CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9684060.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 13 Items Sign in for GEM prices

#1

Mobilisation Phase I

Mobilisation and demobilisation of tools, tackles, plants, labour etc to accomplish the works including installations of the work facilities comprising winch, trolley, platform, safety gears and others, as required to attend rectification of the Radial Gates as provided in the technical specification (Phase-I Activities)

1 set Delivery: 540 days
#2

Mobilisation Phase I

Mobilisation and demobilisation of tools, tackles, plants, labour etc to accomplish the works including installations of the work facilities comprising winch, trolley, platform, safety gears and others, as required to attend rectification of the Radial Gates as provided in the technical specification (Phase-II Activities)

1 set Delivery: 540 days
#3

Work facilities

Design, supply, fabrication and installations of the work facilities comprising winch, trolley, platform, safety gears and others, as required to access the work front and subsequent dismantling/site clearance as per direction of the Engineer-In-Charge

3 set Delivery: 540 days
#4

Dismantling of concrete

Dismantling of concrete and removal of existing top seal beam of the Radial Gate including loading, unloading and transportation of removed steel materials from dam site up to central store at Sopo (approx. 5 km) including all tools, tackles, plant, labour etc, as per direction of the Engineer-In-Charge

3 set Delivery: 540 days
#5

Construction of the groove

Construction of the groove of adequate size, by breaking the concrete to accommodate new top seal beam including rearrangement/ restoration of dismantled reinforcement bars, if any as per approved design to the satisfaction of the Engineer-In-Charge

3 set Delivery: 540 days
#6

1st stage Anchors

Design, Supply and installation of 1st stage Anchors in existing concrete to hold new top seal beam alongwith chemical injection including all plants, tools, tackles, labour etc complete as per technical specification

189 no Delivery: 540 days
#7

top seal beam installation

Design, supply, fabrication, transportation and installation top seal beam complete with conveyor type of anti-jet sealing arrangement including all embedment as per design and specifications complete. The work shall be inclusive of all tools, tackle, manpower, machineries etc.

3 set Delivery: 540 days
#8

additional structural support

Design, Supply, fabrication and erection of additional structural support for strengthening of the overhang portion (above top horizontal girder) of the Radial gate as per design complete including all plants, tools, tackles, labour etc. complete

3 mt Delivery: 540 days
#9

Rectification by grinding

Rectification of misalignment of wall plate and seating of rubber seals including all material, tools, tackles, machineries, labour etc complete -Grinding and machining of the wall plate (max. 5 mm on either side)

20 rm Delivery: 540 days
#10

Rectification by cladding

Rectification of misalignment of wall plate and seating of rubber seals including all material, tools, tackles, machineries, labour etc complete - Cladding with stainless steel plates of suitable thickness (max. 5 mm)

20 rm Delivery: 540 days
#11

Rectification by weld build up

Rectification of misalignment of wall plate and seating of rubber seals including all material, tools, tackles, machineries, labour etc complete - Weld build-up using SS-309 grade of electrode and subsequent machining (max. 5 mm on either side)

20 rm Delivery: 540 days
#12

M-35 grade of concrete placement

Design, supply, placement of shrinkage compensated M-35 grade of concrete and epoxy grout for filling micro gaps wherever required for securing the top seal beam including formworks, materials, admixtures, tools, tackles, plant, machineries, labour etc complete as per specifications

9 cum Delivery: 540 days
#13

Miscellaneous metal works

Miscellaneous metal works like catwalk way, ladder, chequered plate, covers, dogging beams etc. fabricated with rolled steel section, pipes, tubes of general-purpose structural steel as per as directed by engineer in charge

2 mt Delivery: 540 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer