TenderDekho Logo
Active GEM

Indian Army Regulator Vehicle Windows & Electrical Components Tender Pathankot Punjab 2026 ISO 9001

Bid Publish Date

20-Jul-2026, 8:17 pm

Bid End Date

30-Jul-2026, 9:00 pm

Progress

Issue20-Jul-2026, 8:17 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

28

Category

Regulator Vehicle Window LH

Bid Type

Two Packet Bid

Categories 26

Tender Overview

Indian Army invites bids for the supply of assorted regulator vehicle windows and related electrical and mechanical components, located in Pathankot, Punjab. Scope covers 13 items listed under the category including Regulator Vehicle Window LH/RH, Field Coil with Thermal Cut Out, Switch Heater Fan, Door Hinge LH/RH, Cable Assembly Speedometer, Battery Cut Off Switch, Bearing Needle, Becon Orange 24V, Speedometer Drive, Circuit Breaker Battery Cut Off Switch, and Air Pressure Pipe. No detailed unit counts or values are published; the contract allows an option to increase quantity up to 25% of bid quantity and during the currency with contracted rates. The supplier must align with ISO 9001 certification via the bidder or OEM. A pre-supply sample approval is mandatory post award, with two samples due within 5 days. The scope is limited to supply of goods; bulk manufacturing is subject to sample conformity and modification requests. Unique clauses include sample-based acceptance, potential delivery reshaping on approval delays, and adherence to the option clause for time and quantity adjustments. This tender sits under Army procurement in Pathankot with a focus on verified OEM compliance and schedule discipline.

Technical Specifications & Requirements

  • Scope of supply: Only supply of goods (13 items listed in BOQ)
  • Standards: ISO 9001 certification required for bidder or OEM
  • Key items: Regulator Vehicle Window LH, Regulator Vehicle Window RH, Field Coil with Thermal Cut Out, Switch Heater Fan, Door Hinge LH, Door Hinge RH, Cable Assembly Speedometer, Battery Cut Off Switch, Bearing Needle, Becon Orange 24V, Speedometer Drive, Circuit Breaker Battery Cut Off Switch, Air Pressure Pipe
  • Delivery/approval: 2 advance samples due within 5 days of award; modifications to be completed per buyer feedback within 5 days; bulk supply must follow approved sample; if buyer delays, delivery period may be revised without LD
  • Contract scope: Bid price to include all costs; option clause allows quantity changes up to 25%
  • Documentation: PAN, GSTIN, Cancelled Cheque, EFT mandate; sample approval documentation as applicable
  • Notes: No explicit unit quantities or value published in tender data

Terms, Conditions & Eligibility

  • EMD/Performance: Not explicitly disclosed in provided terms; ensure readiness for standard government EMD and performance security per Army norms
  • Delivery timeline: Delivery schedule to be tied to original delivery order with possible extension per option clause
  • Payment terms: Not specified in provided terms; bidders should be prepared for standard Army procurement payment terms
  • Documentation: Must submit PAN, GSTIN, Cancelled Cheque, EFT Mandate; ISO 9001 certificate for bidder or OEM
  • Sample workflow: Advance sample submission within 5 days; potential modifications or rejection if deviations detected; bulk supply contingent on approved sample
  • Warranty/aftermarket: Not detailed; ensure supplier’s post-sale support aligns with standard OEM warranty practices
  • Other: Scope restricted to supply of goods; 25% quantity flexibility during contract execution; option to extend delivery period with calculated time adjustments

Key Specifications

  • 13 listed items in BOQ with no explicit unit quantities

  • ISO 9001: bidder or OEM certification required

  • Advance sample: 2 samples due within 5 days post award

  • Modification feedback: 5 days to implement buyer changes

  • Option clause: quantity may increase up to 25% during contract

  • Delivery adjustments: based on extended delivery period, minimum 30 days if applicable

Terms & Conditions

  • Option to increase quantity up to 25% during contract

  • Advance sample approval required within 5 days post award

  • ISO 9001 certification required for bidder or OEM

Important Clauses

Payment Terms

Not specified in tender data; bidders should anticipate standard Army payment norms and ensure readiness for advance payments per contract

Delivery Schedule

Delivery begins from last date of original delivery order; extended delivery time is calculated as (increase in quantity / original quantity) × original delivery period, with minimum 30 days

Penalties/Liquidated Damages

Not explicitly detailed; implied adherence to standard contract penalties in absence of deviations from approved samples

Bidder Eligibility

  • Must hold ISO 9001 certification (bidder or OEM)

  • PAN and GST registrations required

  • Experience in supplying government/defence electrical and mechanical components preferred

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Regulator Vehicle Window LH , Regulator Vehicle Window RH , Field Coil with Thermal Cut Out , Switch Heater Fan , Door Hinge LH , Door Hinge RH , Cable Assy Speedometer , Battery Cut Off Switch , Bearing Needle , Becon Orange 24V , Speedometer Drive , Circuit Breaker Battery Cut Off Switch , Air Pressure Pipe

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

PATHANKOT

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-PATHANKOTPATHANKOT--315-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9635707.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 13 Items Sign in for GEM prices

#1

Regulator Vehicle Window LH

Regulator Vehicle Window LH

3 nos Delivery: 15 days
#2

Regulator Vehicle Window RH

Regulator Vehicle Window RH

3 nos Delivery: 15 days
#3

Field Coil with Thermal Cut Out

Field Coil with Thermal Cut Out

6 nos Delivery: 15 days
#4

Switch Heater Fan

Switch Heater Fan

1 nos Delivery: 15 days
#5

Door Hinge LH

Door Hinge LH

1 nos Delivery: 15 days
#6

Door Hinge RH

Door Hinge RH

1 nos Delivery: 15 days
#7

Cable Assy Speedometer

Cable Assy Speedometer

2 nos Delivery: 15 days
#8

Battery Cut Off Switch

Battery Cut Off Switch

4 nos Delivery: 15 days
#9

Bearing Needle

Bearing Needle

3 nos Delivery: 15 days
#10

Becon Orange 24V

Becon Orange 24V

1 nos Delivery: 15 days
#11

Speedometer Drive

Speedometer Drive

1 nos Delivery: 15 days
#12

Circuit Breaker Battery Cut Off Switch

Circuit Breaker Battery Cut Off Switch

1 nos Delivery: 15 days
#13

Air Pressure Pipe

Air Pressure Pipe

1 nos Delivery: 15 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card

2

GSTIN

3

Cancelled Cheque

4

EFT Mandate certified by Bank

5

ISO 9001 certificate (bidder or OEM)

6

Experience certificates (if applicable to similar supply)

7

Technical bid documents and OEM authorization (if required)

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid for Regulator Vehicle Window tender Pathankot 2026 in Indian Army?

Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and ISO 9001 certification (bidder or OEM). Prepare 2 advance samples within 5 days of award; ensure conformity to buyer feedback. The contract allows a 25% quantity increase and requires a full goods-only supply with sample-based approval before bulk manufacturing.

What documents are required for Pathankot Army goods supply bid 2026?

Required documents include PAN Card, GSTIN, Cancelled cheque, EFT Mandate (certified), and ISO 9001 certification for bidder or OEM. Experience certificates and OEM authorizations are optional but recommended to strengthen the technical bid; ensure all documents align with T&C sample conditions.

What are the technical standards for this Army procurement in Pathankot?

The tender specifies ISO 9001 certification for bidder or OEM. While no product-specific performance standards are listed, buyers emphasize sample approval and compliance with general supply of goods for 13 listed items including regulator windows and electrical components.

When is advance sample submission due after award for Pathankot tender?

Advance samples must be submitted within 5 days of contract award. The buyer will approve or specify modifications within 5 days, after which bulk supply must commence per the approved sample; delays may adjust the delivery schedule without LD.

What is the quantity adjustment clause for this Pathankot Army tender?

The purchaser reserves the right to increase or decrease the bid quantity by up to 25% at contract placement and during currency at contracted rates, with delivery time recalculated per the formula in the option clause and minimum 30 days.

What is the scope of supply for the Indian Army Pathankot tender?

Scope is limited to the supply of goods for 13 items listed in the BOQ. No manufacturing or service contracts are specified; the supplier must provide compliant items and ensure delivery aligns with sample approvals and option-based quantity changes.

What are the essential eligibility criteria for this defence procurement in Pathankot?

Essential criteria include possession of ISO 9001, valid PAN and GSTIN, and ability to furnish the required EFT Mandate and Cancelled Cheque. Experience in government/defence supply is preferred; bidders should prepare adaptive documentation for potential OEM authorizations.

What are the payment terms for the Indian Army goods supply contract in Pathankot?

Payment terms are not detailed in the provided data; bidders should expect standard defence procurement norms, including milestone-based payments tied to delivery and acceptance of goods, with potential advance payment arrangements upon contract award and sample approval.