TenderDekho Logo
GEM

Indian Army Procurement: 11 Vehicle & Mechanical Sub-Assemblies Tender in Jammu 2026 with Option Clause and Delivery Terms

Bid Publish Date

24-Apr-2026, 6:31 pm

Bid End Date

04-May-2026, 7:00 pm

Progress

Issue24-Apr-2026, 6:31 pm
Technical28-04-2026 12:07:23
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

15

Category

RECTIFIRE ASSY

Bid Type

Two Packet Bid

Categories 43

Tender Overview

The Indian Army (Department Of Military Affairs) located in Jammu, Jammu & Kashmir - 180001 invites bids for a diverse set of mechanical and electrical sub-assemblies: RECTIFIRE ASSY, STATOR ASSY, ROTOR FINAL ASSY, DISTRIBUTOR HEAD, VANE PUMP, TIMING DEVICE PISTON, PRESSURE RELIEF VALVE, BRAKE SHOE ASSY FRONT AND REAR, WIPER BLADE CO DRIVER, THERMOSTAT, WIPER BLADE ARM. The BoQ includes 11 items (with several N/A entries in the provided data). The tender features an option clause empowering the Purchaser to increase/decrease quantities by up to 25% of bid/contracted quantities and to extend delivery time proportionally, subject to minimum 30 days. This procurement emphasizes standard military-grade components and strategic spares, with delivery terms tied to order dates and potential extensions. The exact estimated value and EMD are not disclosed in the available data, signaling a pre-verification stage for bidders.

Location-based tender in Jammu and the organization’s procurement context suggest stringent compliance and traceable supply chain requirements. The unique clause on quantity fluctuation and extended delivery window differentiates this tender from standard fixed-quantity calls. Bidders should align with the Indian Army’s reliability expectations and ensure readiness for variable quantities across 11 listed product lines.

Technical Specifications & Requirements

  • Product/Service Names: RECTIFIRE ASSY, STATOR ASSY, ROTOR FINAL ASSY, DISTRIBUTOR HEAD, VANE PUMP, TIMING DEVICE PISTON, PRESSURE RELIEF VALVE, BRAKE SHOE ASSY FRONT AND REAR, WIPER BLADE CO DRIVER, THERMOSTAT, WIPER BLADE ARM
  • BoQ Items: 11 entries (data shows N/A for quantity/unit in several rows)
  • EMD/Estimated Value: Not disclosed in current data
  • Delivery Terms: Delivery period extendable via option clause; additional time calculated as (Increase in quantity / Original quantity) × Original delivery period, minimum 30 days; order timelines extendable during currency of contract
  • Standards/Certifications: Not specified in the tender data; bidders should verify OEM compatibility and military-grade specifications during bid
  • Quality/Testing: No testing standards listed; ensure component reliability for aviation/military applications and compatibility with listed assemblies
  • Warranty/Aftermarket: Not specified; bidders should seek clarification on warranty expectations and AMC terms
  • Brand/OEM: No explicit brand requirements in data; verify OEM authorizations if applicable

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may modify quantity by up to 25% during contract and delivery extension; extended delivery time calculated with formula; minimum extension 30 days
  • Delivery/Order Timing: Delivery period starts from the last date of the original delivery order; extensions follow the same logic
  • EMD/Payment Terms: Not disclosed in the provided data; bidders should prepare standard bids with applicable EMD per organization norms
  • Documentation: GST, PAN, experience/certificates, financial statements, and OEM authorizations are typically required; verify submission specifics in final T&C
  • Compliance: All bidders must comply with the Purchaser’s option clause and delivery flexibility; ensure readiness for variable quantities across 11 items
  • Legal: Read and align with Buyer Added Terms about quantity fluctuation and delivery extensions; ensure contractual risk management for variable orders

Key Specifications

  • 11 item BoQ set including RECTIFIRE ASSY, STATOR ASSY, ROTOR FINAL ASSY, DISTRIBUTOR HEAD, VANE PUMP, TIMING DEVICE PISTON, PRESSURE RELIEF VALVE, BRAKE SHOE ASSY FRONT AND REAR, WIPER BLADE CO DRIVER, THERMOSTAT, WIPER BLADE ARM

  • Option Clause enabling ±25% quantity variation and corresponding delivery extension (minimum 30 days)

  • Delivery period to commence from the last date of original delivery order

  • Extended delivery time formula: (Increased quantity ÷ Original quantity) × Original delivery period

  • Not disclosed: Estimated value and EMD amount in tender data

  • No explicit technical standards or military-grade specifications listed in data

Terms & Conditions

  • Option-based quantity variation up to 25% with extension rules

  • Delivery period tied to original order date with formula-based extensions

  • EMD, exact value, and detailed specs not disclosed in available data

Important Clauses

Payment Terms

Exact payment terms and EMD details are not provided in the current data; bidders should await final T&C or query for clarify before bid submission

Delivery Schedule

Delivery period starts from the last date of the original delivery order; extension time calculated via (increased quantity/original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in available data; bidders should check final T&C for LD/penalty structure and performance bonds

Bidder Eligibility

  • Experience in supplying military-grade mechanical/electrical assemblies

  • Demonstrated financial stability with valid financial statements

  • Ability to meet OEM/authorizations and delivery commitments with option clause compliance

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

RECTIFIRE ASSY , STATOR ASSY , ROTOR FINAL ASSY , DISTRIBUTOR HEAD , VANE PUMP , TIMING DEVICE PISTON , PRESSURE RELIEF VALVE , BRAKE SHOE ASSY FRONT AND REAR , WIPER BLADE CO DRIVER , THERMOSTAT , WIPER BLADE ARM

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9257126.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

RECTIFIRE ASSY

RECTIFIRE ASSY

1 nos Delivery: 30 days
#2

STATOR ASSY

STATOR ASSY

1 nos Delivery: 30 days
#3

ROTOR FINAL ASSY

ROTOR FINAL ASSY

1 nos Delivery: 30 days
#4

DISTRIBUTOR HEAD

DISTRIBUTOR HEAD

1 nos Delivery: 30 days
#5

VANE PUMP

VANE PUMP

1 nos Delivery: 30 days
#6

TIMING DEVICE PISTON

TIMING DEVICE PISTON

1 nos Delivery: 30 days
#7

PRESSURE RELIEF VALVE

PRESSURE RELIEF VALVE

1 nos Delivery: 30 days
#8

BRAKE SHOE ASSY FRONT AND REAR

BRAKE SHOE ASSY FRONT AND REAR

4 nos Delivery: 30 days
#9

WIPER BLADE CO DRIVER

WIPER BLADE CO DRIVER

2 nos Delivery: 30 days
#10

THERMOSTAT

THERMOSTAT

1 nos Delivery: 30 days
#11

WIPER BLADE ARM

WIPER BLADE ARM

1 nos Delivery: 30 days

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar procurement

4

Financial statements (last 2-3 years)

5

Emd/Security deposit documents (per tender norms, if applicable)

6

Technical bid documents demonstrating compliance

7

OEM authorization/authorization letters (if OEM is required)

8

Any other documents explicitly requested in final Terms & Conditions

Technical Results

S.No Seller Item Date Status
1
PUNEET SALES   Under PMA
-28-04-2026 12:07:23
2
SWASTIK TRADERS   Under PMA
-29-04-2026 11:37:15
3
VISHNU ENTERPRISES   Under PMA
-27-04-2026 13:48:30

Financial Results

Rank Seller Price Item
L1
VISHNU ENTERPRISES(MSE)( MSE Social Category:General )    Under PMA
Item Categories : RECTIFIRE ASSY,STATOR ASSY,ROTOR FINAL ASSY,DISTRIBUTOR HEAD,VANE PUMP,TIMING DEVICE PISTON,PRESSUR
L2
PUNEET SALES (MSE)( MSE Social Category:General )    Under PMA
Item Categories : RECTIFIRE ASSY,STATOR ASSY,ROTOR FINAL ASSY,DISTRIBUTOR HEAD,VANE PUMP,TIMING DEVICE PISTON,PRESSUR
L3
SWASTIK TRADERS (MSE)( MSE Social Category:General )    Under PMA
Item Categories : RECTIFIRE ASSY,STATOR ASSY,ROTOR FINAL ASSY,DISTRIBUTOR HEAD,VANE PUMP,TIMING DEVICE PISTON,PRESSUR

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for Indian Army vehicle sub-assemblies tender in Jammu?

Bidders should first register with the Indian Army procurement portal, obtain OEM authorizations if required, and prepare documents including GST, PAN, experience certificates, financial statements, and EMD. Review the option clause allowing up to 25% quantity variation and ensure readiness to adjust delivery timelines per order changes.

What documents are required for the Jammu military parts tender submission?

Required documents typically include GST certificate, PAN card, experience certificates for similar work, financial statements for the last 2-3 years, EMD documents, technical bid, and OEM authorizations. Prepare clear proof of capability to supply RECTIFIRE, STATOR, ROTOR assemblies and related items.

What are the key product categories in this Indian Army tender 2026?

The tender covers 11 product lines: RECTIFIRE ASSY, STATOR ASSY, ROTOR FINAL ASSY, DISTRIBUTOR HEAD, VANE PUMP, TIMING DEVICE PISTON, PRESSURE RELIEF VALVE, BRAKE SHOE ASSY (FRONT/REAR), WIPER BLADE CO DRIVER, THERMOSTAT, and WIPER BLADE ARM. Exact quantities are not disclosed in the data available.

When is delivery expected after order placement for Jammu tender?

Delivery timing is governed by the option clause; delivery period begins from the last date of the original order, with potential extensions calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days, and may extend to the original period during contract currency.

What standards or certifications are required for the 2026 Indian Army tender?

The data does not specify ISI/ISO standards; bidders should confirm whether OEM authorizations and military-grade compliance are required and ensure compatibility with the listed assemblies while awaiting final T&C for any mandatory specifications.

How does the 25% quantity variation clause affect bidding strategy?

Bid strategists should price for potential up to 25% more/less quantity and plan flexible logistics, inventory buffers, and supplier commitments. Ensure the price quotes reflect scalable manufacturing or procurement plans and include timelines for incremental deliveries within the extended delivery framework.

What is the scope of the 11-item BoQ in this tender?

The BoQ lists 11 item lines including critical assemblies like RECTIFIRE ASSY, STATOR ASSY, ROTOR FINAL ASSY, and other components (DISTRIBUTOR HEAD, VANE PUMP, TIMING DEVICE PISTON, etc.). Several entries show N/A for quantity/unit, indicating data incompleteness; bidders must verify exact quantities during bid finalization.

What happens if quantities exceed the original contractual limits?

Under the option clause, quantity adjustments up to 25% may be ordered at contracted rates. Additional time extensions follow the established formula, with a minimum 30 days; bidders should plan manufacturing capacity and supply chain resilience to accommodate potential fluctuations.