LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5 / Section 3)
N/a
ETAWAH, UTTAR PRADESH
Bid Publish Date
18-Nov-2025, 6:09 pm
Bid End Date
28-Nov-2025, 7:00 pm
Bid Opening Date
28-Nov-2025, 7:30 pm
Location
Progress
Quantity
25
Bid Type
Two Packet Bid
The Uttar Pradesh Power Corporation Limited (UPPCL) in Rampur, Uttar Pradesh invites bids for LED luminaires destined for road and street lighting, conforming to IS 10322 (Part 5 / Section 3). The procurement involves supply and potential installation/commissioning at multiple Rampur-area substations (132 kV, 220 kV). The order quantity and value are not disclosed in the data, but the scope explicitly requires IS 10322 compliance and availability of on-site installation where applicable. A key differentiator is the required proof of product conformity to IS 10322 standards and the presence of a functional service center in the consignee’s state. Unique contractual terms include an option clause for quantity variation up to 25% and a delivery timeline linked to the original delivery schedule.
LED luminaire for road and street lighting, V2
Conformance to IS 10322 (Part 5 / Section 3)
Substation locations: 132 kV Rampur, 220 kV Shankarpur Rampur (delivery/installation at these sites)
Material Test Certificate to accompany supply; buyer lab to determine acceptance
Dedicated toll-free service support and escalation matrix required
GST applicability to be determined by bidder; reimbursement as per actuals or applicable rate (whichever is lower)
Option clause allowing up to 25% quantity variation at contracted rates
Delivery period linked to last date of original delivery order; minimum additional time 30 days
Option to increase/decrease quantity up to 25% at contract rates
Delivery at Rampur region substations with potential installation
Material Test Certificate mandatory with supply; buyer lab validates acceptance
GST handling to be decided by bidder; reimbursement according to actuals or capped by quoted GST rate
Delivery period starts from last date of original PO; additional time calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days
Not explicitly stated; relies on standard contract terms and option clause adjustments
No liquidation or court receivership status; provide undertaking
Functional service center in consignee state or plan to establish within 30 days of award
Proof of GST registration and compliance with GST reimbursement terms
N/a
ETAWAH, UTTAR PRADESH
N/a
GHAZIABAD, UTTAR PRADESH
Advanced Weapons And Equipment India Limited
KANPUR NAGAR, UTTAR PRADESH
Nagar Panchayat Ami Nagar Sarai
BAGPAT, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
BASTI, UTTAR PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of similar LED luminaire supply (3+ years preferred)
Financial statements (audited, last 2 years)
Earnest Money Deposit (EMD) proof or exemption document
Technical bid documents and compliance certificates
OEM authorization / channel partner certificate
Material Test Certificate for supplied luminaires
Service center arrangement proof in the State of consignee or 30-day establishment plan
Key insights about UTTAR PRADESH tender market
Bidders must submit GST registration, PAN, experience certificates for similar LED luminaires, financial statements, EMD proof, OEM authorization, and Material Test Certificate with the technical bid. Ensure IS 10322 (Part 5 / Section 3) compliance and arrange a service center in the consignee state or establish within 30 days of award.
Required documents include GST certificate, PAN, audited financials, experience certificates for similar projects, EMD proof, OEM authorization, Material Test Certificate, and service center proof or plan to establish within 30 days. Also include technical bid and compliance certificates.
Luminaires must conform to IS 10322 (Part 5 / Section 3), with Material Test Certificate provided. Ensure product is ISI/standard compliant as applicable and the bidder provides evidence of conformity and lab test results used for acceptance by UPPCL.
Delivery and potential installation cover sites at 132 kV Rampur and 220 kV Shankarpur Rampur. Delivery timeline starts from the last date of the original delivery order; option to extend up to 25% quantity with minimum 30 days extra time.
Bidder must determine applicable GST; UPPCL will reimburse GST as actuals or at the bidder’s quoted rate, whichever is lower, subject to the maximum GST percentage quoted by the bidder.
Bidders must provide a dedicated toll-free service number and an escalation matrix. A functional service center in the consignee state is required, or establish one within 30 days of award; payment contingent on evidence of service capability.
The purchaser may adjust quantity by up to 25% during contract placement and up to 25% during the contract period at contracted rates. Delivery time adjusts proportionally, with minimum 30 days added time.
While a specific warranty period is not stated, the bidder must provide service support and a functional service center; materials should be test-certified and available for buyer lab verification to ensure acceptance and post-delivery service.
Southern Railway
📍 CHENNAI, TAMIL NADU
Access all tender documents at no cost
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS