TenderDekho Logo
Active GEM

Invitation to Bid - FOR FIRST YEAR,FOR FIRST YEAR,FOR FIRST YEAR,FOR SECOND YEAR,FOR SECOND YEAR,FOR SECOND YEAR,FOR TH in GHAZIABAD, UTTAR PRADESH

Bid Publish Date

24-Aug-2026, 10:18 am

Bid End Date

03-Sep-2026, 11:00 am

Value

₹42,00,000

Location

GHAZIABAD , UTTAR PRADESH

Progress

Issue24-Aug-2026, 10:18 am
AwardPending

Bharat Electronics Limited (bel) announces a tender for FOR FIRST YEAR, FOR SECOND YEAR, FOR THIRD YEAR, SET, NO in GHAZIABAD, UTTAR PRADESH. Quantity: 11. Submission Deadline: 03-09-2026 11: 00: 00. Last date to apply is approaching fast!

Tender Data

Bid Details

Quantity

11

Category

FOR FIRST YEAR

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

FOR FIRST YEAR , FOR SECOND YEAR , FOR THIRD YEAR , SET , NO

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

GHAZIABAD

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-GHAZIABADGHAZIABAD--145-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9786865.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

FOR FIRST YEAR

Comprehensive Annual Maintenance of 2 Nos Precision Air Conditioning capacity 8.5 TR each, model no.PDX0031

1 year Delivery: 45 days
#2

FOR FIRST YEAR

Comprehensive Annual Maintenance of 2 Nos Modular UPS 30 KVA each cabinet rating 150KVA Model No.APM

1 year Delivery: 45 days
#3

FOR FIRST YEAR

Comprehensive Annual Maintenance of following equipments 1 Water leakage detection system 2 Rodent repellent system 3 Fire detection/ alarm and Suppression System 4 CCTV monitoring system 5 VESDA system 6 Electrical Power distribution system Distribution panel-2 No, changeover panel-5 Nos. 7 Raised flooring

1 year Delivery: 45 days
#4

FOR SECOND YEAR

Comprehensive Annual Maintenance of 2 Nos Precision Air Conditioning capacity 8.5 TR each, model no.PDX0031

1 year Delivery: 45 days
#5

FOR SECOND YEAR

Comprehensive Annual Maintenance of 2 Nos Modular UPS 30 KVA each cabinet rating 150KVA Model No.APM

1 year Delivery: 45 days
#6

FOR SECOND YEAR

Comprehensive Annual Maintenance of following equipments 1 Water leakage detection system 2 Rodent repellent system 3.Fire detection/ alarm and Suppression System 4 CCTV monitoring system 5 VESDA system 6 Electrical Power distribution system Distribution panel-2 No, changeover panel-5 Nos 7 Raised flooring

1 year Delivery: 45 days
#7

FOR THIRD YEAR

Comprehensive Annual Maintenance of 2 Nos Precision Air Conditioning capacity 8.5 TR each, model no.PDX0031

1 year Delivery: 45 days
#8

FOR THIRD YEAR

Comprehensive Annual Maintenance of 2 Nos Modular UPS 30 KVA each cabinet rating 150KVA Model No.APM

1 year Delivery: 45 days
#9

FOR THIRD YEAR

Comprehensive Annual Maintenance of following equipments 1 Water leakage detection system 2 Rodent repellent system 3 Fire detection/ alarm and Suppression System 4 CCTV monitoring system 5 VESDA system 6 Electrical Power distribution system Distribution panel-2 No, changeover panel-5 Nos 7 Raised flooring

1 year Delivery: 45 days
#10

SET

Supply & Installation of UPS battery bank if required as per point No. 6 of terms & Conditions

1 set Delivery: 45 days
#11

NO

Supply & Installation of PAC Condensor coil including associated parts & consumable if required as per point No. 6 of terms & Conditions

1 no Delivery: 45 days

Categories 30

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

2

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer