TenderDekho Logo
GEM

Contract Bidding Open For M8752061002 GT: OIL FLOW INDICATOR in JHAJJAR, HARYANA

Bid Publish Date

02-Aug-2025, 10:12 am

Bid End Date

12-Aug-2025, 11:00 am

Progress

Issue02-Aug-2025, 10:12 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

20

Bid Type

Two Packet Bid

Categories 2

Aravali Power Company Private Limited announces a tender for M8752061002 GT: OIL FLOW INDICATOR in JHAJJAR, HARYANA. Quantity: 20. Submission Deadline: 12-08-2025 11: 00: 00. Last date to apply is approaching fast!

Documents 4

GeM-Bidding-8021037.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Flow Switch Indicator for Oil circuit as per the specification,Flow Switch Indicator for Water circ

Andrew Yule Company Limited

KANCHIPURAM, TAMIL NADU

Posted: 24 May 2025
Closed: 10 June 2025
GEM

Oil Flow Indicator (Flow Rate 900 LPM & 100 NB Pipe Size) as per annexure

Bharat Heavy Electricals Limited (bhel)

BHOPAL, MADHYA PRADESH

Posted: 12 March 2025
Closed: 25 March 2025
GEM

OIL FLOW INDICATOR WITHOUT" T" MOUNTING SUITABLE FOR 150 NB PIPE SIZE 800 LPM OIL FLOW L-R,OIL FLOW

Bharat Heavy Electricals Limited (bhel)

JHANSI, UTTAR PRADESH

Posted: 20 May 2025
Closed: 30 May 2025
GEM

Oil Flow Indicator (Flow Rate 800 LPM and 100 NB Pipe Size) as per Annexure

Bharat Heavy Electricals Limited (bhel)

BHOPAL, MADHYA PRADESH

Posted: 3 August 2025
Closed: 16 August 2025
GEM

M/S Krohne Marshall Pvt. Ltd. make Flow Indicator for Stator water flow monitoring system,

Damodar Valley Corporation

Purulia, WEST BENGAL

Posted: 2 August 2025
Closed: 23 August 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

OEM Authorization Certificate

2

Additional Doc 1 (Requested in ATC)

3

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer