Material and labour for carrying out servicing as per manufacturer instruction of Bajaj Platina Veh
Indian Army
DIMAPUR, NAGALAND
Bid Publish Date
20-Feb-2026, 12:44 pm
Bid End Date
07-Mar-2026, 1:00 pm
EMD
₹30,000
Location
Progress
Quantity
734
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow invites bids for Replacement of complete set of Ring hammers, Replacement of damaged broken ring hammer, Replacement of damaged felt seal lining asbestos rope, Replacement of inside bearing No 22244 KC3W33 motor side, Replacement of damaged O ring and Repairing of fluid coupling, Replacement of free end bearing, Alignment of Crusher with motor, Dismantling, removal of rotor shaft, Dismantling of Crusher rotor, Assembly ofCrusher Rotor, Mounting and fixing up the rotor shaft, Work of common chute above RPG, Replacement of damaged multi disc, Replacement of damaged breaker plate, Replacement of damaged top cover, Replacement of damaged screen, Replacement of kickoff plate, Replacement of damaged tramp iron tray, Replacement of damaged back plate, Positioning of vibrating feeder tray, Replacement of damaged rubber pads, Replacement of all rubber packing, Repairing of chute, Replacement of damaged end cover guard, Checking of both bearing, repacking after greasing, Repr. , Repl. of fusible plug and Filling of oil, Repr of damaged portion of screen plate kickoff plate back plate, Repl. of damaged portion of middle and end disc, Repl. of bolt of Screen, kick off, tray foundation, Work on individual chute below RPG, Repl. of bearing housing coupling end, Repl. of bearing housing face end, Repl. of side cover, Removal of any iron forein material, Overhauling of cooling water pump, Replacement of damaged shoo headed bolt of bearing housing, Dismantling of top cover and side cover, Repl. of bottom liners of VF tray, Repl. of half flexible coupling bolts, Repl. Of bolts of breaker plate, Replacement of damaged valve of cooling water line, Repl. of the damaged front chute of conveyor 4A4B, Repl. of both half coupling of crusher rotor and FCU, Dismant. , removal and refixing of FCU, Repl. of gate valve, OH of DE system, OH of Iron chute, Repl of VF Tray, Repairing of VF Tray, Overhauling of RPG, Fabrication of Breaker plate, Fabrication of Iron Tray, Fabrication of kick off plate, Repl. of side Chute of common hopper, Fabrication of top cover of crusher, Repr. , Repl. of all 16 window, Servicing repairing of Valves From Dia 4 to 12, Strengthening Repairing of crusher body, The work of Strengthening of VF 2AB, Fabrication of Chute pipe of WT, Fabrication and Installation of mesh of WT, Fabrication of screen for coal crusher, Dismantling of Chute VF Tray and Base, Fabrication Strengthening of Chute VF Tray and Base, Erection of Chute VF Tray and Base, Fabrication of Coal Crusher Chute, Replacement of complete set of hammers, Replacement of damaged hammers, Replacement of felt seal lining packing, Replacement of inside bearing DE Side, Replacement of inside bearing NDE side, Replacement of screen plate coupling, Minor Repairing of chute ducts, Checking of DE and NDE side bearing, Minor Repairing of white metal bearing, Repairing of screen casing Crusher bar, Replacement of damaged broken bolt, Replacement oil ring white metal brg, Removal of any iron foreign material, Replacement of bolts of breaker plate, Fabrication of casing crusher bar, Minor work, Air gap checking and adjustment, Matching, inst. of both Babbitt brg, Grease gun overhauling, replacement and shifting of crusher rotor, Coupling and decoupling of crusher, removing top duct and re erect, Overhauling of Crusher 7A and 7B, Overhauling of Wagon Tippler No 2 and 3, Overhauling of New Stacker Reclaimer HM 135 in SONBHADRA, UTTAR PRADESH. Quantity: 734. Submission Deadline: 07-03-2026 13: 00: 00. Submit your proposal before the deadline.
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
DIMAPUR, NAGALAND
Indian Army
JODHPUR, RAJASTHAN
Indian Army
DIMAPUR, NAGALAND
Indian Army
DIMAPUR, NAGALAND
Indian Army
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Replacement of complete set of Ring hammers | Replacement of complete set of Ring hammers | 5 | ea | ee_chd2_btps_obra | 183 |
| 2 | Replacement of damaged broken ring hammer | Replacement of damaged broken ring hammer | 23 | ea | ee_chd2_btps_obra | 183 |
| 3 | Replacement of damaged felt seal lining asbestos rope | Replacement of damaged felt seal lining asbestos rope of Crusher | 30 | ea | ee_chd2_btps_obra | 183 |
| 4 | Replacement of inside bearing No 22244 KC3W33 motor side | Replacement of inside bearing No 22244 KC3W33 motor side by new old and usable | 1 | ea | ee_chd2_btps_obra | 183 |
| 5 | Replacement of damaged O ring and Repairing of fluid coupling | Replacement of damaged O ring and Repairing of fluid coupling | 4 | ea | ee_chd2_btps_obra | 183 |
| 6 | Replacement of free end bearing | Replacement of free end bearing | 2 | ea | ee_chd2_btps_obra | 183 |
| 7 | Alignment of Crusher with motor | Alignment along with leveling of Crusher with motor | 19 | ea | ee_chd2_btps_obra | 183 |
| 8 | Dismantling, removal of rotor shaft | Dismantling, removal of rotor shaft and shifting up to ground floor | 1 | ea | ee_chd2_btps_obra | 183 |
| 9 | Dismantling of Crusher rotor | Dismant of check nut locking washer, end disc both side distance ring middle disc and both side bearing from Crusher rotor | 2 | ea | ee_chd2_btps_obra | 183 |
| 10 | Assembly ofCrusher Rotor | Assembly of end disc both side distance ring middle disc locking washer along with check nut by new repaired | 1 | ea | ee_chd2_btps_obra | 183 |
| 11 | Mounting and fixing up the rotor shaft | Mounting and fixing up the rotor shaft in a position along with complete accessories | 1 | ea | ee_chd2_btps_obra | 183 |
| 12 | Work of common chute above RPG | Work of common chute above rack and pinion gate of Crusher | 1 | ea | ee_chd2_btps_obra | 183 |
| 13 | Replacement of damaged multi disc | Replacement of damaged multi disc of fluid coupling FCU 41 by new old and usable | 2 | ea | ee_chd2_btps_obra | 183 |
| 14 | Replacement of damaged breaker plate | Replacement of damaged breaker plate by new repaired | 1 | ea | ee_chd2_btps_obra | 183 |
| 15 | Replacement of damaged top cover | Replacement of damaged top cover by new repaired and shifting damaged top cover to scrap yard | 1 | ea | ee_chd2_btps_obra | 183 |
| 16 | Replacement of damaged screen | Replacement of damaged screen plate by new repaired one | 4 | ea | ee_chd2_btps_obra | 183 |
| 17 | Replacement of kickoff plate | Replacement of kickoff plate by new repaired one | 2 | ea | ee_chd2_btps_obra | 183 |
| 18 | Replacement of damaged tramp iron tray | Replacement of damaged tramp iron tray By repaired one fabrication one at site and shifting of scrap | 2 | ea | ee_chd2_btps_obra | 183 |
| 19 | Replacement of damaged back plate | Replacement of damaged back plate by repaired fabricated one at site | 5 | ea | ee_chd2_btps_obra | 183 |
| 20 | Positioning of vibrating feeder tray | Positioning of vibrating feeder tray after setting of rubber pads | 6 | ea | ee_chd2_btps_obra | 183 |
| 21 | Replacement of damaged rubber pads | Replacement of damaged rubber pads | 5 | ea | ee_chd2_btps_obra | 183 |
| 22 | Replacement of all rubber packing | Replacement of all rubber packing proper fitting of existing packing of vibrating feeder tray | 15 | ea | ee_chd2_btps_obra | 183 |
| 23 | Repairing of chute | Repairing of chute to stop leakage from different chutes by providing patch by welding | 113 | ea | ee_chd2_btps_obra | 183 |
| 24 | Replacement of damaged end cover guard | Replacement of damaged end cover guard | 15 | ea | ee_chd2_btps_obra | 183 |
| 25 | Checking of both bearing, repacking after greasing | Checking of both side bearing of crusher and repacking of grease | 24 | ea | ee_chd2_btps_obra | 183 |
| 26 | Repr., Repl. of fusible plug and Filling of oil | Repairing Replacement of fusible plug and Filling of oil of fluid coupling | 5 | ea | ee_chd2_btps_obra | 183 |
| 27 | Repr of damaged portion of screen plate kickoff plate back plate | Repairing of damaged portion of screen plate kickoff plate back plate | 15 | ea | ee_chd2_btps_obra | 183 |
| 28 | Repl. of damaged portion of middle and end disc | Replacement of damaged portion of middle disc end disc within position to crusher to crusher by proper welding | 13 | ea | ee_chd2_btps_obra | 183 |
| 29 | Repl. of bolt of Screen, kick off,tray foundation | Replacement of damaged broken bolt of Screen plate kickoff plate tray foundation below top cover | 25 | ea | ee_chd2_btps_obra | 183 |
| 30 | Work on individual chute below RPG | Work on individual chute below rack and Pinion gate of coal crusher | 2 | ea | ee_chd2_btps_obra | 183 |
| 31 | Repl. of bearing housing coupling end | Replacement of bearing housing coupling end | 1 | ea | ee_chd2_btps_obra | 183 |
| 32 | Repl. of bearing housing face end | Replacement of bearing housing face end | 1 | ea | ee_chd2_btps_obra | 183 |
| 33 | Repl. of side cover | Replacement of damaged side cover by repaired fabrication one at side | 3 | ea | ee_chd2_btps_obra | 183 |
| 34 | Removal of any iron forein material | Removal of any iron forein material from the screen plate of crusher and shifting up to scrap yard | 10 | ea | ee_chd2_btps_obra | 183 |
| 35 | Overhauling of cooling water pump | Overhauling of cooling water pump | 2 | ea | ee_chd2_btps_obra | 183 |
| 36 | Replacement of damaged shoo headed bolt of bearing housing | Replacement of damaged shoo headed bolt of bearing housing | 4 | ea | ee_chd2_btps_obra | 183 |
| 37 | Dismantling of top cover and side cover | Dismantling of top cover and side cover and fixing up in a position after completion of associated works | 25 | ea | ee_chd2_btps_obra | 183 |
| 38 | Repl. of bottom liners of VF tray | Replacement of bottom liners of vibrating feeder tray | 1 | ea | ee_chd2_btps_obra | 183 |
| 39 | Repl. of half flexible coupling bolts | Replacement of the damaged coupling bolts of the half flexible coupling of crusher | 5 | ea | ee_chd2_btps_obra | 183 |
| 40 | Repl. Of bolts of breaker plate | Replacement of the damaged broken bolts of breaker plate | 5 | ea | ee_chd2_btps_obra | 183 |
| 41 | Replacement of damaged valve of cooling water line | Replacement of damaged valve of cooling water line | 2 | ea | ee_chd2_btps_obra | 183 |
| 42 | Repl. of the damaged front chute of conveyor 4A4B | Replacement of the damaged front chute of conveyor 4A4B above common chute of crusher by fabricated chute at site | 2 | ea | ee_chd2_btps_obra | 183 |
| 43 | Repl. of both half coupling of crusher rotor and FCU | Replacement of both half coupling of crusher rotor and fluid coupling | 1 | ea | ee_chd2_btps_obra | 183 |
| 44 | Dismant., removal and refixing of FCU | Dismantling and removal of fluid coupling and fixing up in same position after completion of associated work | 8 | ea | ee_chd2_btps_obra | 183 |
| 45 | Repl. of gate valve | Replacement of damaged gate valve by new repaired one of all connected hoods of dust and separation system | 6 | ea | ee_chd2_btps_obra | 183 |
| 46 | OH of DE system | Overhauling of Dust Extraction system of Coal Crusher | 1 | ea | ee_chd2_btps_obra | 183 |
| 47 | OH of Iron chute | Overhauling of Iron chute after closing main water valve | 1 | ea | ee_chd2_btps_obra | 183 |
| 48 | Repl of VF Tray | Replacement of damaged vibrating feeder Tray of Coal Crusher 7A7B7C7D | 1 | ea | ee_chd2_btps_obra | 183 |
| 49 | Repairing of VF Tray | Repairing of damaged vibrating feeder Tray | 1 | ea | ee_chd2_btps_obra | 183 |
| 50 | Overhauling of RPG | Overhauling of Rack and Pinion gate of Coal Crusher 7C7D 7A7B | 2 | ea | ee_chd2_btps_obra | 183 |
| 51 | Fabrication of Breaker plate | Fabrication of Breaker plate | 1 | ea | ee_chd2_btps_obra | 183 |
| 52 | Fabrication of Iron Tray | Fabrication of Iron Tray | 2 | ea | ee_chd2_btps_obra | 183 |
| 53 | Fabrication of kick off plate | Fabrication of kick off plate | 2 | ea | ee_chd2_btps_obra | 183 |
| 54 | Repl. of side Chute of common hopper | Replacement of side Chute of Coal Crusher common hopper Chute | 1 | ea | ee_chd2_btps_obra | 183 |
| 55 | Fabrication of top cover of crusher | Fabrication of top cover of crusher | 2 | ea | ee_chd2_btps_obra | 183 |
| 56 | Repr., Repl. of all 16 window | Repairing Replacement of all window of all crusher 16 Windows | 1 | ea | ee_chd2_btps_obra | 183 |
| 57 | Servicing repairing of Valves From Dia 4 to 12 | Servicing repairing of Valves From Dia 4 to 12 | 10 | ea | ee_chd2_btps_obra | 183 |
| 58 | Strengthening Repairing of crusher body | Strengthening Repairing of crusher body side and foundation | 2 | ea | ee_chd2_btps_obra | 183 |
| 59 | The work of Strengthening of VF 2AB | The work of Strengthening of VF 2AB | 43 | job | ee_chd2_btps_obra | 183 |
| 60 | Fabrication of Chute pipe of WT | Fabrication of Chute pipe of WT | 80 | ea | ee_chd2_btps_obra | 183 |
| 61 | Fabrication and Installation of mesh of WT | Fabrication and Installation of mesh of WT | 9 | job | ee_chd2_btps_obra | 183 |
| 62 | Fabrication of screen for coal crusher | Fabrication of screen for coal crusher | 4 | job | ee_chd2_btps_obra | 183 |
| 63 | Dismantling of Chute VF Tray and Base | Dismantling of Chute VF Tray and Base | 1 | job | ee_chd2_btps_obra | 183 |
| 64 | Fabrication Strengthening of Chute VF Tray and Base | Fabrication Strengthening of Chute VF Tray and Base | 1 | job | ee_chd2_btps_obra | 183 |
| 65 | Erection of Chute VF Tray and Base | Erection of Chute VF Tray and Base | 1 | job | ee_chd2_btps_obra | 183 |
| 66 | Fabrication of Coal Crusher Chute | Fabrication of Coal Crusher Chute | 68 | ea | ee_chd2_btps_obra | 183 |
| 67 | Replacement of complete set of hammers | Replacement of complete set of hammers | 1 | job | ee_chd2_btps_obra | 183 |
| 68 | Replacement of damaged hammers | Replacement of damaged hammers | 4 | job | ee_chd2_btps_obra | 183 |
| 69 | Replacement of felt seal lining packing | Replacement of felt seal lining packing | 3 | job | ee_chd2_btps_obra | 183 |
| 70 | Replacement of inside bearing DE Side | Replacement of inside bearing DE Side | 1 | job | ee_chd2_btps_obra | 183 |
| 71 | Replacement of inside bearing NDE side | Replacement of inside bearing NDE side | 1 | job | ee_chd2_btps_obra | 183 |
| 72 | Alignment of Crusher with motor | Alignment of Crusher with motor | 2 | job | ee_chd2_btps_obra | 183 |
| 73 | Replacement of screen plate coupling | Replacement of screen plate coupling | 2 | job | ee_chd2_btps_obra | 183 |
| 74 | Minor Repairing of chute ducts | Minor Repairing of chute ducts | 15 | job | ee_chd2_btps_obra | 183 |
| 75 | Checking of DE and NDE side bearing | Checking of DE and NDE side bearing | 4 | job | ee_chd2_btps_obra | 183 |
| 76 | Minor Repairing of white metal bearing | Minor Repairing of white metal bearing | 2 | job | ee_chd2_btps_obra | 183 |
| 77 | Repairing of screen casing Crusher bar | Repairing of screen casing Crusher bar | 2 | job | ee_chd2_btps_obra | 183 |
| 78 | Replacement of damaged broken bolt | Replacement of damaged broken bolt | 5 | job | ee_chd2_btps_obra | 183 |
| 79 | Replacement oil ring white metal brg | Replacement oil ring white metal brg | 1 | job | ee_chd2_btps_obra | 183 |
| 80 | Removal of any iron foreign material | Removal of any iron foreign material | 1 | job | ee_chd2_btps_obra | 183 |
| 81 | Dismantling of top cover and side cover | Dismantling of top cover and side cover | 3 | job | ee_chd2_btps_obra | 183 |
| 82 | Replacement of bolts of breaker plate | Replacement of bolts of breaker plate | 2 | job | ee_chd2_btps_obra | 183 |
| 83 | Fabrication of casing crusher bar | Fabrication of casing crusher bar | 1 | job | ee_chd2_btps_obra | 183 |
| 84 | Fabrication of top cover of crusher | Fabrication of top cover of crusher | 1 | job | ee_chd2_btps_obra | 183 |
| 85 | Strengthening Repairing of crusher body | Strengthening Repairing of crusher body | 1 | job | ee_chd2_btps_obra | 183 |
| 86 | Minor work | Minor work | 12 | job | ee_chd2_btps_obra | 183 |
| 87 | Air gap checking and adjustment | Air gap checking and adjustment | 2 | job | ee_chd2_btps_obra | 183 |
| 88 | Matching, inst. of both Babbitt brg | Matching & inst. of both Babbitt brg | 2 | job | ee_chd2_btps_obra | 183 |
| 89 | Grease gun overhauling | Grease gun overhauling | 2 | job | ee_chd2_btps_obra | 183 |
| 90 | replacement and shifting of crusher rotor | replacement and shifting of crusher rotor | 1 | job | ee_chd2_btps_obra | 183 |
| 91 | Coupling and decoupling of crusher | Coupling and decoupling of crusher | 2 | job | ee_chd2_btps_obra | 183 |
| 92 | removing top duct and re erect | removing top duct and re erect | 1 | job | ee_chd2_btps_obra | 183 |
| 93 | Overhauling of Crusher 7A and 7B | Overhauling of Crusher 7A and 7B | 2 | ea | ee_chd2_btps_obra | 183 |
| 94 | Overhauling of Wagon Tippler No 2 and 3 | Overhauling of Wagon Tippler No 2 and 3 | 2 | ea | ee_chd2_btps_obra | 183 |
| 95 | Overhauling of New Stacker Reclaimer HM 135 | Overhauling of New Stacker Reclaimer HM 135 | 1 | ea | ee_chd2_btps_obra | 183 |
Discover companies most likely to bid on this tender
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS