TenderDekho Logo
GEM

Bids are Invited For Replacement of complete set of Ring hammers,Replacement of damaged broken ring hammer,Replacement o in SONBHADRA, UTTAR PRADESH

Bid Publish Date

20-Feb-2026, 12:44 pm

Bid End Date

12-Mar-2026, 1:00 pm

EMD

₹30,000

Generate Docs

Progress

Issue20-Feb-2026, 12:44 pm
Technical03-Jul-2026, 11:48 am
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

734

Categories 108

AGITATORS SCRAP WORM PUMPS MAGNETIC YOKE WIND MILL ENERGY PROJECT SLUICE VALVE BRIQUETTING PLANT CENTRIFUGE BRUSHES AXLE ALTERNATOR DISPENSING TOOLS COAL HANDLING PLANT MISCELLANEOUS VALVE ANGLE GLOBE VALVES RING STRUCTURE FABRICATION ASBESTOS COAL HANDLING SYSTEM PERISTALTIC PUMPS TUBE AND FITTING DESERT COOLER OVERHAULING OF MECHANICAL BEARINGS MATERIAL HANDLING MACHINERY MOBIL OIL TURBINE BLOWER BEARINGS BUSHINGS AND GEARS PUMP REPAIR STEEL FURNITURE DUCTS ARC VALVE TICKETING MACHINE DISTILLATION HARDWARE AND FASTENERS SPHERICAL BEARING TURBINE SPARE PART GEARBOX OVERHAULING DUST EXTRACTION SYSTEM ASH PLANT PUMP SPARE PARTS FIXING ALIGNMENT FAN SPARE PARTS SYNCHRONOUS MOTORS ASH HANDLING PLANT MUSICAL INSTRUMENT PARTS AND ACCESSORIES WATER LINE MECHANICAL OVERHAULING ALUMINIUM ALLOY WINDOW CENTRIFUGAL MACHINE RECLAIMER SLURRY PUMP MACHINERY REPAIRS FLUID MECHANICS EQUIPMENT CRUSHER ROTATING PISTON PUMPS BEARING HOLDERS ALTERNATING CURRENT MOTOR AMMONIUM NITRATE LOADING MACHINERY MECHANICAL COUPLINGS TROUGHING ROLLER ROLLER BEARING BOLTS SHEAR PUMPS PILLOW BLOCK ROTARY CAM PUMPS VALVES ROTARY LOBE PUMPS WHEEL BEARING AC MOTORS GATE VALVES RETURN ROLLER FLAT AXLE BOX BACK PLATE VALVE FABRICATION OF CHUTE SANITARY FITTING WATER SUPPLY MATERIAL GEAR SNATCH BLOCK BEARING NUTS ERECTION OF STRUCTURAL WORM GEAR TURBINE PUMPS VACUUM CENTRIFUGES BEARING BLOCK SLIDER VALVES OVERHAULING OF GEARBOX MESH PROGRESSIVE CAVITY PUMPS BEARING BRACKET COAL CRUSHER TRANSITION METALS BOILER MOUNTING VALVE DUST COLLECTORS LUBE OIL FABRICATOR WATER TRANSMISSION VALVE PARTS AND ACCESSORIES ESCRAP WATER COOLED ENGINE BOILER VALVE PEB SUPPLY OF BEARING WATER PUMP METAL PRODUCTS BAR MANUFACTURING SERVICES SLEEVE BEARING

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow invites bids for Replacement of complete set of Ring hammers, Replacement of damaged broken ring hammer, Replacement of damaged felt seal lining asbestos rope, Replacement of inside bearing No 22244 KC3W33 motor side, Replacement of damaged O ring and Repairing of fluid coupling, Replacement of free end bearing, Alignment of Crusher with motor, Dismantling, removal of rotor shaft, Dismantling of Crusher rotor, Assembly ofCrusher Rotor, Mounting and fixing up the rotor shaft, Work of common chute above RPG, Replacement of damaged multi disc, Replacement of damaged breaker plate, Replacement of damaged top cover, Replacement of damaged screen, Replacement of kickoff plate, Replacement of damaged tramp iron tray, Replacement of damaged back plate, Positioning of vibrating feeder tray, Replacement of damaged rubber pads, Replacement of all rubber packing, Repairing of chute, Replacement of damaged end cover guard, Checking of both bearing, repacking after greasing, Repr. , Repl. of fusible plug and Filling of oil, Repr of damaged portion of screen plate kickoff plate back plate, Repl. of damaged portion of middle and end disc, Repl. of bolt of Screen, kick off, tray foundation, Work on individual chute below RPG, Repl. of bearing housing coupling end, Repl. of bearing housing face end, Repl. of side cover, Removal of any iron forein material, Overhauling of cooling water pump, Replacement of damaged shoo headed bolt of bearing housing, Dismantling of top cover and side cover, Repl. of bottom liners of VF tray, Repl. of half flexible coupling bolts, Repl. Of bolts of breaker plate, Replacement of damaged valve of cooling water line, Repl. of the damaged front chute of conveyor 4A4B, Repl. of both half coupling of crusher rotor and FCU, Dismant. , removal and refixing of FCU, Repl. of gate valve, OH of DE system, OH of Iron chute, Repl of VF Tray, Repairing of VF Tray, Overhauling of RPG, Fabrication of Breaker plate, Fabrication of Iron Tray, Fabrication of kick off plate, Repl. of side Chute of common hopper, Fabrication of top cover of crusher, Repr. , Repl. of all 16 window, Servicing repairing of Valves From Dia 4 to 12, Strengthening Repairing of crusher body, The work of Strengthening of VF 2AB, Fabrication of Chute pipe of WT, Fabrication and Installation of mesh of WT, Fabrication of screen for coal crusher, Dismantling of Chute VF Tray and Base, Fabrication Strengthening of Chute VF Tray and Base, Erection of Chute VF Tray and Base, Fabrication of Coal Crusher Chute, Replacement of complete set of hammers, Replacement of damaged hammers, Replacement of felt seal lining packing, Replacement of inside bearing DE Side, Replacement of inside bearing NDE side, Replacement of screen plate coupling, Minor Repairing of chute ducts, Checking of DE and NDE side bearing, Minor Repairing of white metal bearing, Repairing of screen casing Crusher bar, Replacement of damaged broken bolt, Replacement oil ring white metal brg, Removal of any iron foreign material, Replacement of bolts of breaker plate, Fabrication of casing crusher bar, Minor work, Air gap checking and adjustment, Matching, inst. of both Babbitt brg, Grease gun overhauling, replacement and shifting of crusher rotor, Coupling and decoupling of crusher, removing top duct and re erect, Overhauling of Crusher 7A and 7B, Overhauling of Wagon Tippler No 2 and 3, Overhauling of New Stacker Reclaimer HM 135 in SONBHADRA, UTTAR PRADESH. Quantity: 734. Submission Deadline: 12-03-2026 13: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

Replacement of complete set of Ring hammers , Replacement of damaged broken ring hammer , Replacement of damaged felt seal lining asbestos rope , Replacement of inside bearing No 22244 KC3W33 motor side , Replacement of damaged O ring and Repairing of fluid coupling , Replacement of free end bearing , Alignment of Crusher with motor , Dismantling, removal of rotor shaft , Dismantling of Crusher rotor , Assembly ofCrusher Rotor , Mounting and fixing up the rotor shaft , Work of common chute above RPG , Replacement of damaged multi disc , Replacement of damaged breaker plate , Replacement of damaged top cover , Replacement of damaged screen , Replacement of kickoff plate , Replacement of damaged tramp iron tray , Replacement of damaged back plate , Positioning of vibrating feeder tray , Replacement of damaged rubber pads , Replacement of all rubber packing , Repairing of chute , Replacement of damaged end cover guard , Checking of both bearing, repacking after greasing , Repr., Repl. of fusible plug and Filling of oil , Repr of damaged portion of screen plate kickoff plate back plate , Repl. of damaged portion of middle and end disc , Repl. of bolt of Screen, kick off,tray foundation , Work on individual chute below RPG , Repl. of bearing housing coupling end , Repl. of bearing housing face end , Repl. of side cover , Removal of any iron forein material , Overhauling of cooling water pump , Replacement of damaged shoo headed bolt of bearing housing , Dismantling of top cover and side cover , Repl. of bottom liners of VF tray , Repl. of half flexible coupling bolts , Repl. Of bolts of breaker plate , Replacement of damaged valve of cooling water line , Repl. of the damaged front chute of conveyor 4A4B , Repl. of both half coupling of crusher rotor and FCU , Dismant., removal and refixing of FCU , Repl. of gate valve , OH of DE system , OH of Iron chute , Repl of VF Tray , Repairing of VF Tray , Overhauling of RPG , Fabrication of Breaker plate , Fabrication of Iron Tray , Fabrication of kick off plate , Repl. of side Chute of common hopper , Fabrication of top cover of crusher , Repr., Repl. of all 16 window , Servicing repairing of Valves From Dia 4 to 12 , Strengthening Repairing of crusher body , The work of Strengthening of VF 2AB , Fabrication of Chute pipe of WT , Fabrication and Installation of mesh of WT , Fabrication of screen for coal crusher , Dismantling of Chute VF Tray and Base , Fabrication Strengthening of Chute VF Tray and Base , Erection of Chute VF Tray and Base , Fabrication of Coal Crusher Chute , Replacement of complete set of hammers , Replacement of damaged hammers , Replacement of felt seal lining packing , Replacement of inside bearing DE Side , Replacement of inside bearing NDE side , Replacement of screen plate coupling , Minor Repairing of chute ducts , Checking of DE and NDE side bearing , Minor Repairing of white metal bearing , Repairing of screen casing Crusher bar , Replacement of damaged broken bolt , Replacement oil ring white metal brg , Removal of any iron foreign material , Replacement of bolts of breaker plate , Fabrication of casing crusher bar , Minor work , Air gap checking and adjustment , Matching, inst. of both Babbitt brg , Grease gun overhauling , replacement and shifting of crusher rotor , Coupling and decoupling of crusher , removing top duct and re erect , Overhauling of Crusher 7A and 7B , Overhauling of Wagon Tippler No 2 and 3 , Overhauling of New Stacker Reclaimer HM 135

Authority Records

ENERGY DEPARTMENT
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9005542.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited wagon tippler maintenance tender Lucknow UP - ISMS/IS 550/AAA TRTL 2026

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow

SONBHADRA, UTTAR PRADESH

Posted: 14 March 2026
Closed: 2 April 2026
GEM

Repair of oil chamber and replace old oils,Four door lock channel opening comma repairing and refit

Indian Army

MUMBAI, MAHARASHTRA

Posted: 13 February 2025
Closed: 6 March 2025
GEM

Dismantling repairing,Replacement of fuel system and servicing,Repair to water body system dismantl

Indian Army

AMRITSAR, PUNJAB

Posted: 19 June 2025
Closed: 14 July 2025
GEM

Repair of the Veh BA No 19C 108110E taking out unserviceable worn out spare parts and replace with

Indian Army

LEH, JAMMU & KASHMIR

Posted: 17 January 2025
Closed: 7 February 2025
GEM

Complete servicing of vehicle,23B138711E Swift Dzire,Supply and replacement of engine oil,Weight Wh

Indian Army

ERNAKULAM, KERALA

Posted: 3 February 2026
Closed: 13 February 2026
GEM

Bill of Quantities (BOQ) 95 Items Sign in for GEM prices

#1

Replacement of complete set of Ring hammers

Replacement of complete set of Ring hammers

5 ea Delivery: 183 days
#2

Replacement of damaged broken ring hammer

Replacement of damaged broken ring hammer

23 ea Delivery: 183 days
#3

Replacement of damaged felt seal lining asbestos rope

Replacement of damaged felt seal lining asbestos rope of Crusher

30 ea Delivery: 183 days
#4

Replacement of inside bearing No 22244 KC3W33 motor side

Replacement of inside bearing No 22244 KC3W33 motor side by new old and usable

1 ea Delivery: 183 days
#5

Replacement of damaged O ring and Repairing of fluid coupling

Replacement of damaged O ring and Repairing of fluid coupling

4 ea Delivery: 183 days
#6

Replacement of free end bearing

Replacement of free end bearing

2 ea Delivery: 183 days
#7

Alignment of Crusher with motor

Alignment along with leveling of Crusher with motor

19 ea Delivery: 183 days
#8

Dismantling, removal of rotor shaft

Dismantling, removal of rotor shaft and shifting up to ground floor

1 ea Delivery: 183 days
#9

Dismantling of Crusher rotor

Dismant of check nut locking washer, end disc both side distance ring middle disc and both side bearing from Crusher rotor

2 ea Delivery: 183 days
#10

Assembly ofCrusher Rotor

Assembly of end disc both side distance ring middle disc locking washer along with check nut by new repaired

1 ea Delivery: 183 days
#11

Mounting and fixing up the rotor shaft

Mounting and fixing up the rotor shaft in a position along with complete accessories

1 ea Delivery: 183 days
#12

Work of common chute above RPG

Work of common chute above rack and pinion gate of Crusher

1 ea Delivery: 183 days
#13

Replacement of damaged multi disc

Replacement of damaged multi disc of fluid coupling FCU 41 by new old and usable

2 ea Delivery: 183 days
#14

Replacement of damaged breaker plate

Replacement of damaged breaker plate by new repaired

1 ea Delivery: 183 days
#15

Replacement of damaged top cover

Replacement of damaged top cover by new repaired and shifting damaged top cover to scrap yard

1 ea Delivery: 183 days
#16

Replacement of damaged screen

Replacement of damaged screen plate by new repaired one

4 ea Delivery: 183 days
#17

Replacement of kickoff plate

Replacement of kickoff plate by new repaired one

2 ea Delivery: 183 days
#18

Replacement of damaged tramp iron tray

Replacement of damaged tramp iron tray By repaired one fabrication one at site and shifting of scrap

2 ea Delivery: 183 days
#19

Replacement of damaged back plate

Replacement of damaged back plate by repaired fabricated one at site

5 ea Delivery: 183 days
#20

Positioning of vibrating feeder tray

Positioning of vibrating feeder tray after setting of rubber pads

6 ea Delivery: 183 days
#21

Replacement of damaged rubber pads

Replacement of damaged rubber pads

5 ea Delivery: 183 days
#22

Replacement of all rubber packing

Replacement of all rubber packing proper fitting of existing packing of vibrating feeder tray

15 ea Delivery: 183 days
#23

Repairing of chute

Repairing of chute to stop leakage from different chutes by providing patch by welding

113 ea Delivery: 183 days
#24

Replacement of damaged end cover guard

Replacement of damaged end cover guard

15 ea Delivery: 183 days
#25

Checking of both bearing, repacking after greasing

Checking of both side bearing of crusher and repacking of grease

24 ea Delivery: 183 days
#26

Repr., Repl. of fusible plug and Filling of oil

Repairing Replacement of fusible plug and Filling of oil of fluid coupling

5 ea Delivery: 183 days
#27

Repr of damaged portion of screen plate kickoff plate back plate

Repairing of damaged portion of screen plate kickoff plate back plate

15 ea Delivery: 183 days
#28

Repl. of damaged portion of middle and end disc

Replacement of damaged portion of middle disc end disc within position to crusher to crusher by proper welding

13 ea Delivery: 183 days
#29

Repl. of bolt of Screen, kick off,tray foundation

Replacement of damaged broken bolt of Screen plate kickoff plate tray foundation below top cover

25 ea Delivery: 183 days
#30

Work on individual chute below RPG

Work on individual chute below rack and Pinion gate of coal crusher

2 ea Delivery: 183 days
#31

Repl. of bearing housing coupling end

Replacement of bearing housing coupling end

1 ea Delivery: 183 days
#32

Repl. of bearing housing face end

Replacement of bearing housing face end

1 ea Delivery: 183 days
#33

Repl. of side cover

Replacement of damaged side cover by repaired fabrication one at side

3 ea Delivery: 183 days
#34

Removal of any iron forein material

Removal of any iron forein material from the screen plate of crusher and shifting up to scrap yard

10 ea Delivery: 183 days
#35

Overhauling of cooling water pump

Overhauling of cooling water pump

2 ea Delivery: 183 days
#36

Replacement of damaged shoo headed bolt of bearing housing

Replacement of damaged shoo headed bolt of bearing housing

4 ea Delivery: 183 days
#37

Dismantling of top cover and side cover

Dismantling of top cover and side cover and fixing up in a position after completion of associated works

25 ea Delivery: 183 days
#38

Repl. of bottom liners of VF tray

Replacement of bottom liners of vibrating feeder tray

1 ea Delivery: 183 days
#39

Repl. of half flexible coupling bolts

Replacement of the damaged coupling bolts of the half flexible coupling of crusher

5 ea Delivery: 183 days
#40

Repl. Of bolts of breaker plate

Replacement of the damaged broken bolts of breaker plate

5 ea Delivery: 183 days
#41

Replacement of damaged valve of cooling water line

Replacement of damaged valve of cooling water line

2 ea Delivery: 183 days
#42

Repl. of the damaged front chute of conveyor 4A4B

Replacement of the damaged front chute of conveyor 4A4B above common chute of crusher by fabricated chute at site

2 ea Delivery: 183 days
#43

Repl. of both half coupling of crusher rotor and FCU

Replacement of both half coupling of crusher rotor and fluid coupling

1 ea Delivery: 183 days
#44

Dismant., removal and refixing of FCU

Dismantling and removal of fluid coupling and fixing up in same position after completion of associated work

8 ea Delivery: 183 days
#45

Repl. of gate valve

Replacement of damaged gate valve by new repaired one of all connected hoods of dust and separation system

6 ea Delivery: 183 days
#46

OH of DE system

Overhauling of Dust Extraction system of Coal Crusher

1 ea Delivery: 183 days
#47

OH of Iron chute

Overhauling of Iron chute after closing main water valve

1 ea Delivery: 183 days
#48

Repl of VF Tray

Replacement of damaged vibrating feeder Tray of Coal Crusher 7A7B7C7D

1 ea Delivery: 183 days
#49

Repairing of VF Tray

Repairing of damaged vibrating feeder Tray

1 ea Delivery: 183 days
#50

Overhauling of RPG

Overhauling of Rack and Pinion gate of Coal Crusher 7C7D 7A7B

2 ea Delivery: 183 days
#51

Fabrication of Breaker plate

Fabrication of Breaker plate

1 ea Delivery: 183 days
#52

Fabrication of Iron Tray

Fabrication of Iron Tray

2 ea Delivery: 183 days
#53

Fabrication of kick off plate

Fabrication of kick off plate

2 ea Delivery: 183 days
#54

Repl. of side Chute of common hopper

Replacement of side Chute of Coal Crusher common hopper Chute

1 ea Delivery: 183 days
#55

Fabrication of top cover of crusher

Fabrication of top cover of crusher

2 ea Delivery: 183 days
#56

Repr., Repl. of all 16 window

Repairing Replacement of all window of all crusher 16 Windows

1 ea Delivery: 183 days
#57

Servicing repairing of Valves From Dia 4 to 12

Servicing repairing of Valves From Dia 4 to 12

10 ea Delivery: 183 days
#58

Strengthening Repairing of crusher body

Strengthening Repairing of crusher body side and foundation

2 ea Delivery: 183 days
#59

The work of Strengthening of VF 2AB

The work of Strengthening of VF 2AB

43 job Delivery: 183 days
#60

Fabrication of Chute pipe of WT

Fabrication of Chute pipe of WT

80 ea Delivery: 183 days
#61

Fabrication and Installation of mesh of WT

Fabrication and Installation of mesh of WT

9 job Delivery: 183 days
#62

Fabrication of screen for coal crusher

Fabrication of screen for coal crusher

4 job Delivery: 183 days
#63

Dismantling of Chute VF Tray and Base

Dismantling of Chute VF Tray and Base

1 job Delivery: 183 days
#64

Fabrication Strengthening of Chute VF Tray and Base

Fabrication Strengthening of Chute VF Tray and Base

1 job Delivery: 183 days
#65

Erection of Chute VF Tray and Base

Erection of Chute VF Tray and Base

1 job Delivery: 183 days
#66

Fabrication of Coal Crusher Chute

Fabrication of Coal Crusher Chute

68 ea Delivery: 183 days
#67

Replacement of complete set of hammers

Replacement of complete set of hammers

1 job Delivery: 183 days
#68

Replacement of damaged hammers

Replacement of damaged hammers

4 job Delivery: 183 days
#69

Replacement of felt seal lining packing

Replacement of felt seal lining packing

3 job Delivery: 183 days
#70

Replacement of inside bearing DE Side

Replacement of inside bearing DE Side

1 job Delivery: 183 days
#71

Replacement of inside bearing NDE side

Replacement of inside bearing NDE side

1 job Delivery: 183 days
#72

Alignment of Crusher with motor

Alignment of Crusher with motor

2 job Delivery: 183 days
#73

Replacement of screen plate coupling

Replacement of screen plate coupling

2 job Delivery: 183 days
#74

Minor Repairing of chute ducts

Minor Repairing of chute ducts

15 job Delivery: 183 days
#75

Checking of DE and NDE side bearing

Checking of DE and NDE side bearing

4 job Delivery: 183 days
#76

Minor Repairing of white metal bearing

Minor Repairing of white metal bearing

2 job Delivery: 183 days
#77

Repairing of screen casing Crusher bar

Repairing of screen casing Crusher bar

2 job Delivery: 183 days
#78

Replacement of damaged broken bolt

Replacement of damaged broken bolt

5 job Delivery: 183 days
#79

Replacement oil ring white metal brg

Replacement oil ring white metal brg

1 job Delivery: 183 days
#80

Removal of any iron foreign material

Removal of any iron foreign material

1 job Delivery: 183 days
#81

Dismantling of top cover and side cover

Dismantling of top cover and side cover

3 job Delivery: 183 days
#82

Replacement of bolts of breaker plate

Replacement of bolts of breaker plate

2 job Delivery: 183 days
#83

Fabrication of casing crusher bar

Fabrication of casing crusher bar

1 job Delivery: 183 days
#84

Fabrication of top cover of crusher

Fabrication of top cover of crusher

1 job Delivery: 183 days
#85

Strengthening Repairing of crusher body

Strengthening Repairing of crusher body

1 job Delivery: 183 days
#86

Minor work

Minor work

12 job Delivery: 183 days
#87

Air gap checking and adjustment

Air gap checking and adjustment

2 job Delivery: 183 days
#88

Matching, inst. of both Babbitt brg

Matching & inst. of both Babbitt brg

2 job Delivery: 183 days
#89

Grease gun overhauling

Grease gun overhauling

2 job Delivery: 183 days
#90

replacement and shifting of crusher rotor

replacement and shifting of crusher rotor

1 job Delivery: 183 days
#91

Coupling and decoupling of crusher

Coupling and decoupling of crusher

2 job Delivery: 183 days
#92

removing top duct and re erect

removing top duct and re erect

1 job Delivery: 183 days
#93

Overhauling of Crusher 7A and 7B

Overhauling of Crusher 7A and 7B

2 ea Delivery: 183 days
#94

Overhauling of Wagon Tippler No 2 and 3

Overhauling of Wagon Tippler No 2 and 3

2 ea Delivery: 183 days
#95

Overhauling of New Stacker Reclaimer HM 135

Overhauling of New Stacker Reclaimer HM 135

1 ea Delivery: 183 days

Corrigendum Updates

1 Update
#1

Update

07-Mar-2026

Extended Deadline

12-Mar-2026, 1:00 pm

Opening Date

12-Mar-2026, 1:30 pm

Technical Results

S.No Seller Item Date Status
1
ALOK ENTERPRISES   Under PMA
-07-03-2026 11:48:37
2
BHARAT TECHNO ENGINEERING   Under PMA
-11-03-2026 21:30:25
3
M/S DEEN DAYAL   Under PMA
-12-03-2026 12:16:44

Financial Results

Rank Seller Price Item
L1
ALOK ENTERPRISES   Under PMA
Item Categories : Replacement of complete set of Ring hammers,Replacement of damaged broken ring hammer,Replacement o
L2
BHARAT TECHNO ENGINEERING   Under PMA
Item Categories : Replacement of complete set of Ring hammers,Replacement of damaged broken ring hammer,Replacement o

Similar Tenders

5 found
Urgent

Indian Army Electrical Works Tender Department Of Military Affairs, India - Exhaust Fans, Wiring, Switchboards, LED Lights 2026

Indian Army

📍 KAMRUP, ASSAM

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

PICS C 143 01 02 002 SWING JAW PLATE,PICS C 1430100003 JAW PLATE FIX SIDE,PICS C 1430100006 TOP LIN

Border Road Organisation

📍 PAPUM PARE, ARUNACHAL PRADESH

EMD: ₹55,000
Est: ₹11.2 L
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM

Rashtriya Ispat Nigam Limited Segrigation Plate & Deck Support Beam Tender Vizag 2026 ISI/IS 550 Compliant

Rashtriya Ispat Nigam Limited

📍 VISAKHAPATNAM, ANDHRA PRADESH

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Repair and Overhauling Service - RECTIFICATION OF DEFECTS SL H-045, H-053, H-056, H-059, H-061 & H-

Indian Coast Guard

📍 JAGATSINGHAPUR, ODISHA

⏰ Deadline: 7 days left
🛒 Type: Service
View GEM

Supply of Stone Pad,Supply of MS Angle Iron,Supply of Top Channel,Supply of Clamp,Supply of E-Brack

Uttar Pradesh Power Corporation Limited (uppcl)

📍 ETAH, UTTAR PRADESH

EMD: ₹16,000
Est: ₹15.5 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Chat with us