Bullet Resistance Jacket (V3)
Hqids
Bid Publish Date
12-Feb-2026, 6:25 pm
Bid End Date
27-Feb-2026, 6:00 pm
EMD
₹33,15,000
Location
Progress
Quantity
1551
Bid Type
Two Packet Bid
Maharashtra State Police has released a public tender for Bullet Resistant Jackets (V4) ISI Marked to IS 17051 (Q2) in MUMBAI, MAHARASHTRA. Quantity: 1551. Submission Deadline: 27-02-2026 18: 00: 00. Download documents and apply online.
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Hqids
Uttar Pradesh Police
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Space Research Organization
Octopus
GUNTUR, ANDHRA PRADESH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Technical Requirement | Sizes (Designated by chest girth) | XS (72–80 cm) |
| Physical Requirements of Non-ballistic Components | Requirements of Hook and Loop Fasteners | Table 3 and Clause 5.1.2 |
| Physical Requirements of Non-ballistic Components | Armour Panel Configuration | In-Conjunction With (ICW) — HAP used together with SAP |
| Physical Requirements of Ballistic Components | Protection Area of SAP | The minimum coverage area of various components of SAP shall be as given in Table 4. Clause 5.2.2 and 5.2.5 |
| Physical Requirements of Ballistic Components | Protection Area of HAP | The minimum coverage area of various components of HAP shall be as given in Table 5. Clauses 5.2.3 and 5.2.5 |
| PERFORMANCE REQUIREMENTS | Threat Level | Level - 5 |
| PERFORMANCE REQUIREMENTS | Maximum permissible back face signature (BFS) limits | 25 mm |
| PERFORMANCE REQUIREMENTS | Weight of Jacket (specified by size and threat level) | As per Annex C (Clauses 5.2.4 and 5.2.5) |
| Marking | Marking | As per clause 12 of IS 17051 |
| Certification and Test Reports | Agree to provide all relevant documents, Test Report/Supporting document / reports etc. to the buyer on demand after placement of order/ at the time of Supply. | Yes |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS