TenderDekho Logo
GEM

Procurement Opportunity: 2 Mega Pixel Network Outdoor IR PTZ Camera,8 Channel Network Video Recorder,Workstation with Monito in DHUBRI, ASSAM

Bid Publish Date

10-Feb-2026, 6:20 pm

Bid End Date

09-Mar-2026, 11:00 am

EMD

₹4,31,633

Value

₹1,43,87,779

Location

Generate Docs

Progress

Issue10-Feb-2026, 6:20 pm
Corrigendum05-Mar-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

14787

Category

2 Mega Pixel Network Outdoor IR PTZ Camera

Bid Type

Two Packet Bid

Categories 138

COPPER WIRE PVC PIPE ELECTRICAL NATURAL FUELS WIND MILL ENERGY PROJECT WATER DISTRIBUTION APPARELS DIGITAL CROSS CONNECT APFC PANEL AUDIO VIDEO CONFERENCING POLYETHYLENE PIPE VIDEO RECORDER SYRINGE PUMPS BUILDING CONSTRUCTION NETWORKING RACK SPOTTING SCOPE COPPER COIL UPS COPPER STRIP ELECTRONIC COMPUTATIONAL DEVICE COATING THICKNESS CABBING EQUIPMENTS SEAMLESS PIPE WALL CONSTRUCTION AIR CYLINDERS BIRD FEED PIPE PROJECT TUBE AND FITTING ARNO STARTING CONTACTOR ELECTRICAL PRODUCTS PLATE SUPPLY CAMERA SWITCH YARD WIRING ASSEMBLY NETWORK SWITCHES OFFSET PRINTING ELECTROCARDIOGRAPHY UNITS CHANNEL HARDWARE AND FASTENERS JOINTING OF PIPE FERROUS ALLOY SUPPLY SILVER TIP SUPPLY OF SCHOOL UNIFORM WELDING BRAZING AND SOLDERING SERVICES STRIP SECURITY CAMERAS SATELLITE ACCESS EQUIPMENT LIGHTENING PROTECTION DEVICE INSULATED WIRE TELECOM EQUIPMENT SOIL EARTH NETWORK VIDEO RECORDER SNG CLOTHING EQUIPMENT INSTRUMENTATION CABLE GI WIRE PRESSURE VESSEL ELECTRICAL BOXES WATER DRAINAGE DIAMONDS ELECTRICAL?CONDUIT GOLD MEDAL NETWORK CABLE STOMACHERS SWITCH PORT CABLING SOCKET SURVEILLANCE EQUIPMENTS POWER WIRE SUPPLY JUMPER WIRE AC PIPES GI PIPE HIGH TENSION PANEL ATM LOCAL AREA NETWORK CABLING BITUMINOUS ROAD ROLL MILL EARTH AND STONE ELECTRODES PACKING ITEM SHIELDED CABLE BRAZE RINGS GLUCOMETER CCTV SYSTEM FIRE ALARM PANEL SWITCH BOX AROMATIC SPIRIT POWER WIRE TECHNICAL SERVICES BELL CONTROLLER DRAINAGE PORT INTEGRATED SECURITY SYSTEM BOX WATER LEVEL RECORDER WIRE FUME HOODS VIDEO TRACKING SYSTEM BRONZE PIPE CLAMPS SUPPLY OF POWER FILLING RAIN CUT PIPE LAYING AUDIO VIDEO EQUIPMENT BARE CABLE ALCOHOLIC BEVERAGES BACKFILLING BACKHOE TRENCHING WORK TRANSITION METALS PIT WORK SOLID AND GEL FUELS CABLE HDPE PIPE FIRE BREATHING APPARATUS WEB CAMERA WATER TRANSMISSION PLASTIC ELECTRICAL CABLE MS PIPE LINE BATTERY VALVE PARTS AND ACCESSORIES EXCAVATION FLEXIBLE PIPE BASE METALS SCREWS BRICK BUNDI ERECTION OF PIPE PEB UPVC PIPE ELECTRIFICATION EARTH MOVING CONSTRUCTION JACK GALVANIZED IRON PIPE

Airports Authority Of India announces a tender for 2 Mega Pixel Network Outdoor IR PTZ Camera, 8 Channel Network Video Recorder, Workstation with Monito in DHUBRI, ASSAM. Quantity: 14787. Submission Deadline: 09-03-2026 11: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8956456.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

20X optical zoom PTZ camera for vedio conference,all in one speaker phone with 6 microphone,55 prof

N/a

Posted: 19 December 2024
Closed: 9 January 2025
GEM

Indian Army PTZ 2MP 45X IR Network Camera Tender Jodhpur Rajasthan 2025

Indian Army

JODHPUR, RAJASTHAN

Posted: 10 December 2025
Closed: 22 December 2025
GEM

Bharat Petroleum CCTV Integration Tender 2026 - Infinova HD Megapixel IP PTZ, Face Capture, VMS, Fibre & Cabling - India

Bharat Petroleum Corporation Ltd

WEST DELHI, DELHI

Posted: 10 March 2026
Closed: 20 March 2026
GEM

Indian Army PTZ Camera & High End Control Station Tender Alwar Rajasthan 2025

Indian Army

ALWAR, RAJASTHAN

Posted: 21 November 2025
Closed: 8 December 2025
GEM

PTZ CAMERA WITH WORKSTATION AND ACCESSORIES

Indian Air Force

Posted: 6 November 2024
Closed: 27 November 2024
GEM

Bill of Quantities (BOQ) 62 Items Sign in for GEM prices

#1

2 Mega Pixel Network Outdoor IR PTZ Camera

2 Mega Pixel Network Outdoor IR PTZ Camera - As per Technical Specification

4 nos Delivery: 120 days
#2

8 Channel Network Video Recorder

8 Channel Network Video Recorder (1+1) with 30 days backup - Primary & Redundant - As per Technical Specification

1 set Delivery: 120 days
#3

Workstation with Monitor For Remote Viewing

Workstation with Monitor For Remote Viewing - As per Technical Specification

1 no Delivery: 120 days
#4

Layer 3 Managed Switch Primary and Redundant

Layer-3 Managed Switch. - Primary & Redundant- As per Technical Specification

2 nos Delivery: 120 days
#5

Layer 2 8 Ports x 1G PoE Plus Plus Managed switch

Layer-2 8 Ports x 1G PoE++ Managed switch - As per Technical Specification

4 nos Delivery: 120 days
#6

1G Single Mode SFP Transceiver Module

1G Single Mode SFP Transceiver Module - As per Technical Specification

20 nos Delivery: 120 days
#7

1G Ethernet RJ45 SFP Transceiver Module

1G Ethernet RJ45 SFP Transceiver Module - As per Technical Specification

6 nos Delivery: 120 days
#8

RF Link Point to MultiPoint radio with minimum 3 Km range with accessories

RF Link Point to MultiPoint radio with minimum 3 Km range with accessories. (Set of 01 BTS and 04 Subscriber Module) - As per Technical Specification

1 set Delivery: 120 days
#9

24 Core Single Mode Armoured Optical Fiber Cable

24 Core Single Mode Armoured Optical Fiber Cable - As per Technical Specification

2,500 mtrs Delivery: 120 days
#10

24 Port loaded Optical Fiber LIU

24 Port loaded Optical Fiber LIU - As per Technical Specification

1 no Delivery: 120 days
#11

6 Port loaded Optical Fiber LIU

6 Port loaded Optical Fiber LIU - As per Technical Specification

4 nos Delivery: 120 days
#12

Optical Fiber Patch Cord LC LC 3 Mtrs

Optical Fiber Patch Cord-LC-LC 3 Mtrs - As per Technical Specification

25 nos Delivery: 120 days
#13

Cat6 4 Pair Unshielded Twisted Pair Cable

Cat6 4 Pair Unshielded Twisted Pair Cable - LSZH (Indoor Purpose)- As per Technical Specification

305 mtrs Delivery: 120 days
#14

Cat6 UTP Patch Cord 2 Mtr

Cat6 UTP Patch Cord-2Mtr - As per Technical Specification

2 nos Delivery: 120 days
#15

Cat6A STP Patch Cord 2 Mtr

Cat6A STP Patch Cord-2Mtr - As per Technical Specification

6 nos Delivery: 120 days
#16

Cat6A STP Patch Cord 5 Mtr

Cat6A STP Patch Cord-5Mtr - As per Technical Specification

5 nos Delivery: 120 days
#17

Cat6A STP Patch Cord 15 Mtr

Cat6A STP Patch Cord-15Mtr - As per Technical Specification

10 nos Delivery: 120 days
#18

Cat6A STP Patch Cord 30 Mtr

Cat6A STP Patch Cord-30Mtr - As per Technical Specification

2 nos Delivery: 120 days
#19

Cat6 UTP Information Outlet

Cat6 UTP Information Outlet with 2x Keystone Jack + 1x Gang Box + 1x Dual Socket Face Plate - As per Technical Specification

1 no Delivery: 120 days
#20

27 U Floor Mount Rack with accessory

27U Floor Mount Rack with accessory - As per Technical Specification

1 no Delivery: 120 days
#21

17 U Floor Mount Rack with accessory

17U Floor Mount Rack with accessory - As per Technical Specification

1 no Delivery: 120 days
#22

6 U Pole Mount Rack with accessory

6U Pole Mount Rack with accessory- As per Technical Specification

4 nos Delivery: 120 days
#23

Galvanized Pole 12 Mtr Camera Mounting Poles for PTZ Camera

Galvanized Pole 3 or 6 or 12 Mtr Camera Mounting Poles for PTZ Camera - As per Technical Specification and site requirement

5 nos Delivery: 120 days
#24

5 KVA Online UPS in Parallel Redundancy mode with 60 minutes battery backup in each UPS

5 KVA Online UPS in Parallel Redundancy mode with 60 minutes battery backup in each UPS - As per Technical Specification

4 nos Delivery: 120 days
#25

4 Core 6 MM Armoured Copper Electrical Cable

4 Core 6 MM Armoured Copper Electrical Cable - As per Technical Specification

1,000 mtrs Delivery: 120 days
#26

Electrical Box with 25 Amp MCB

Electrical Box with 25 Amp MCB 15- or 16-Amp Socket at Rack End

5 nos Delivery: 120 days
#27

2 x 15 or 16 Amp Shuttered switch socket Combined with Cover Plate and back box at Control Room End

2 x 15/16 Amp Shuttered switch socket Combined with Cover Plate and back box at Control Room End

1 set Delivery: 120 days
#28

DB with 1 x 40 Amp DP and 4 Nos SP 25 AMP MCB For UPS End

DB with 1 x 40 Amp DP and 4 Nos SP 25 AMP MCB For UPS End

1 set Delivery: 120 days
#29

DB with 1 x 40 Amp DP and 2 Nos SP 25 AMP MCB For UPS End

DB with 1 x 40 Amp DP and 2 Nos SP 25 AMP MCB For UPS End

1 set Delivery: 120 days
#30

DB with 1 x 40 Amp DP

DB with 1 x 40 Amp DP

4 nos Delivery: 120 days
#31

40MM dia HDPE pipe with all fixing accessories for Outdoor installation

40MM dia HDPE pipe with all fixing accessories for Outdoor installation

2,500 mtrs Delivery: 120 days
#32

25MM PVC Pipe with all fixing accessories for Indoor

25MM PVC Pipe with all fixing accessories for Indoor

250 mtrs Delivery: 120 days
#33

25MM PVC Flexible Pipe for Indoor

25MM PVC Flexible Pipe for Indoor

100 mtrs Delivery: 120 days
#34

25 or 32mm PVC Reinforceable flexible Pipe

25 or 32mm PVC Reinforceable flexible Pipe

500 mtrs Delivery: 120 days
#35

Supply Installation Testing and Commissioning of earthing with copper earth plate

Supply Installation Testing and Commissioning of earthing with copper earth plate 600mm x 600mm x 3.15mm thick including accessories and providing masonry enclosure with cover plate hanging lock arrangement and watering pipe of 2.7 meters long ect. with charcoal/coke and salt as required. Conventional earthing using copper plates as per IS 3043

1 set Delivery: 120 days
#36

Supply Installation Testing and Commissioning of 25 mm x 5 mm copper strip at 0.50 Meter below ground as strip earth electrode

Supply Installation Testing and Commissioning of 25mm x 5mm copper strip at 0.50 Meter below ground as strip earth electrode in 40mm Dia GI pipe from earth electrode, including connection/terminating with nut, bolt, spring, washer, etc. as required. (Jointing shall be done by overlapping and with 2 sets of brass nut bolt and spring washer spaced at 50mm)

30 mtrs Delivery: 120 days
#37

Supply Installation Testing and Commissioning of 4mm Dia copper wire

Supply Installation Testing and Commissioning of 4mm Dia copper wire with clamps/tie with GI pipe of LA and connection/termination with copper body of LA and copper strip at bottom of LA through nut/bolt/spring washer etc. as required for earthing etc. complete as required.

30 mtrs Delivery: 120 days
#38

Supply Installation Testing and Commissioning of providing joints by using brazing technique

Supply Installation Testing and Commissioning of providing joints by using brazing technique of 25 mm x 5 mm copper/GI strip on surface or in recess for connections to another copper/GI earth strip for interconnection to all earths of lightening arrestors, counterpoise, equipment and electrical power supply earthing etc. as required.

2 nos Delivery: 120 days
#39

Supply Installation Testing and Commissioning of copper bonded rod with low carbon steel high tensile strength copper bonded rod with min 254 microns of copper plating

Supply Installation Testing and Commissioning of copper bonded rod with low carbon steel, high tensile strength copper bonded rod with min 254 microns of copper plating. Diameter - 17.2 mm length- 3 meters, material- copper bonded, coating thickness - 250 microns, min 20 kg backfilled compound, material carbon based backfill/earthing compound, fulgurite formation test at direct lightening (10/350 microseconds), tested form laboratory having accreditation from (KEMA/VDE/Dakks/ILAC/NABL), lightening long duration test at 100C No fulgurites/pass, environmentally friendly RoHS certified, Resistivity - less than 0.12. M, complying standard-IEC 62561-7, testing approvals certified from NABL accredited laboratories. Poly plastic pit cover of material- Polymer body and cover.

1 no Delivery: 120 days
#40

Excavation of soil for making trench

Excavation of soil for making trench of size (Depth Min. 75cm, width min 35 Cm) including provision of sand and /Concrete/Bricks etc. for laying Fiber Optic Cable/Power Supply Cable & Refilling/backfilling of the trench with excavated soil - as required and making good the same as per site condition

250 mtrs Delivery: 120 days
#41

Laying or fixing of HDPE Conduit or pipe Underground or surface complete as required as per site condition

Laying/fixing of HDPE Conduit/pipe Underground/surface complete as required as per site condition.

2,500 mtrs Delivery: 120 days
#42

Laying of 25MM PVC Pipe

Laying of 25MM PVC Pipe with all fixing accessories for Indoor with all fixing accessories on/above of false celling or fixing on wall including fixing of suitable saddle /screws etc as required as per site conditions

250 mtrs Delivery: 120 days
#43

Laying of 25MM PVC Flexible Pipe for Indoor complete as required

Laying of 25MM PVC Flexible Pipe for Indoor complete as required.

100 mtrs Delivery: 120 days
#44

Laying of 25 or 32mm PVC Reinforceable flexible Pipe complete as required

Laying of 25/32mm PVC Reinforceable flexible Pipe complete as required.

500 mtrs Delivery: 120 days
#45

Laying of Optical Fiber Cable end to end ferruling labeling and termination through GI Conduit or PVC Pipe complete as required

Laying of Optical Fiber Cable end to end ferruling labeling & termination through GI Conduit/PVC Pipe complete as required.

2,500 mtrs Delivery: 120 days
#46

Laying of Cat6 UTP end to end ferruling labeling and termination through PVC Pipe complete as required

Laying of Cat6 UTP end to end ferruling labeling & termination through PVC Pipe complete as required.

305 mtrs Delivery: 120 days
#47

Laying of Electrical Cable end to end ferruling labeling and termination through GI Conduit or PVC Pipe complete as required

Laying of Electrical Cable end to end ferruling labeling & termination through GI Conduit/PVC Pipe complete as required.

1,000 mtrs Delivery: 120 days
#48

Mounting and Fixing of GI Pole after excavation of soft or hard soil including cutting of bituminous road or pavement

Mounting & Fixing of GI Pole after excavation of soft or hard soil including cutting of bituminous road or pavement upto desired depth and making suitable foundation for erection of the GI pole complete as required.

5 nos Delivery: 120 days
#49

Mounting Fixing Labeling and Dressing of Floor Standing Rack complete as required

Mounting, Fixing, Labeling & Dressing of Floor Standing Rack complete as required

2 nos Delivery: 120 days
#50

Mounting Fixing Labeling and Dressing of 6U Pole Mount Rack complete as required

Mounting, Fixing, Labeling & Dressing of 6U Pole Mount Rack complete as required

4 nos Delivery: 120 days
#51

Mounting Fixing and Labeling of All Types of Cameras complete as required

Mounting, Fixing and Labeling of All Types of Cameras complete as required

4 nos Delivery: 120 days
#52

Installation Splicing of all OFC core Rack to Server Rack Labelling testing and commissioning

Installation Splicing of all OFC core (Rack to Server Rack), Labelling, testing & commissioning of 6/12/24 Port LIU with all its accessories.

5 nos Delivery: 120 days
#53

Installation of DB

Installation of DB with 1 x 40 Amp DP, 4 Nos. SP 25 AMP MCB, 1 x 40 Amp DP, 2 Nos. SP 25 AMP MCB and 4 Nos. DP 40 AMP DP at UPS End

1 set Delivery: 120 days
#54

Installation of 2 x 15- or 16- Amp Shuttered switch socket Combined with Cover Plate and back box For Surveillance Room End

Installation of 2 x 15- or 16-Amp Shuttered switch socket Combined with Cover Plate and back box For Surveillance Room End

1 set Delivery: 120 days
#55

Installation of Electrical Box with 25 Amp MCB 15 or 16 Amp Socket at Rack End

Installation of Electrical Box with 25 Amp MCB 15/16 Amp Socket at Rack End

4 nos Delivery: 120 days
#56

Installation Testing and Commissioning of 5KVA Online UPS with 60 Min Backup including UPS output Electrification complete as required

Installation, Testing & Commissioning of 5KVA Online UPS with 60 Min Backup including UPS output Electrification complete as required

4 nos Delivery: 120 days
#57

Installation Testing and Commissioning of NVR Primary and Redundancy complete as required

Installation, Testing & Commissioning of NVR - Primary & Redundancy complete as required.

1 set Delivery: 120 days
#58

Termination and Fixing of Category 6 UTP Information Outlet

Termination & Fixing of Category 6 UTP Information Outlet

1 no Delivery: 120 days
#59

Mounting Fixing Installation and Configuration of All Types of Switches complete as required

Mounting, Fixing, Installation & Configuration of All Types of Switches complete as required

6 nos Delivery: 120 days
#60

Installation and Configuration of WorkStation complete as required

Installation & Configuration of WorkStation complete as required

1 no Delivery: 120 days
#61

Installation and Configuration of Point to MultiPoint radio with accessories complete as required

Installation & Configuration of Point to MultiPoint radio with accessories complete as required

1 set Delivery: 120 days
#62

Testing commissioning certification providing 3 sets of completion diagram and Documentation of Entire Project complete as required

Testing, commissioning, certification, providing 3 sets of completion diagram & Documentation of Entire Project complete as required

1 job Delivery: 120 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC)

8

Additional Doc 3 (Requested in ATC)

9

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

2 Updates
#1

Update

05-Mar-2026

Extended Deadline

09-Mar-2026, 11:00 am

Opening Date

09-Mar-2026, 11:30 am

#2

Update

16-Feb-2026

Similar Tenders

5 found

IP PTZ Camera with advanced artificial intelligence,Digital Network Video recorder 16 channel with

Indian Army

📍 NILGIRIS, TAMIL NADU

EMD: ₹26,634
⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

PTZ CAMERA 4 MP 32 X ZOOM 180 MTR IR,NVR 32 Channel With HDD,Night Vision IP Bullet Camera 5 MP 50

Indian Army

📍 JAMMU, JAMMU & KASHMIR

EMD: ₹60,000
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Training on operation of PTZ series cameras

Indian Army

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

Indian Army Surveillance System Tender for PTZ and CCTV Cameras in India 2026

Indian Army

📍 POONCH, JAMMU & KASHMIR

EMD: ₹1.9 L
⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

Training for maintenance and deployment of PTZ series cameras

Indian Army

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Chat with us