TenderDekho Logo
Closed GEM

Open Tender for BOQ1,BOQ2,BOQ3,BOQ4,BOQ5,BOQ6,BOQ7,BOQ8,BOQ9,BOQ10,BOQ11,BOQ12,BOQ13,BOQ14,BOQ15,BOQ16,BOQ17,BOQ18, in JAMMU, JAMMU & KASHMIR

Bid Publish Date

05-Oct-2026, 2:29 pm

Bid End Date

16-Oct-2026, 2:00 pm

EMD

₹5,28,000

Progress

Issue05-Oct-2026, 2:29 pm
AwardPending

A tender has been published for Indian Army BOQ1, BOQ2, BOQ3, BOQ4, BOQ5, BOQ6, BOQ7, BOQ8, BOQ9, BOQ10, BOQ11, BOQ12, BOQ13, BOQ14, BOQ15, BOQ16, BOQ17, BOQ18, BOQ19, BOQ20, BOQ21, BOQ22, BOQ23, BOQ24, BOQ25, BOQ26, BOQ27, BOQ28, BOQ29, BOQ30, BOQ31, BOQ32, BOQ33, BOQ34, BOQ35, BOQ36, BOQ37 in JAMMU, JAMMU & KASHMIR. Quantity: 9380 by. Submission Deadline: 16-10-2026 14: 00: 00. Check eligibility and apply.

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

9380

Category

BOQ1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

40 %

Warranty Period

5 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

BOQ1 , BOQ2 , BOQ3 , BOQ4 , BOQ5 , BOQ6 , BOQ7 , BOQ8 , BOQ9 , BOQ10 , BOQ11 , BOQ12 , BOQ13 , BOQ14 , BOQ15 , BOQ16 , BOQ17 , BOQ18 , BOQ19 , BOQ20 , BOQ21 , BOQ22 , BOQ23 , BOQ24 , BOQ25 , BOQ26 , BOQ27 , BOQ28 , BOQ29 , BOQ30 , BOQ31 , BOQ32 , BOQ33 , BOQ34 , BOQ35 , BOQ36 , BOQ37

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

38

Pre-Bid & Qualification

Pre-Bid Date

10-10-2026 11:00:00

Pre-Bid Venue

GS (Info Sys) HQ 16 Corps Nagrota Bidders are advice to e-mail their Aadhaar card to this office email id [email protected] for security verification & entry purpose 24 Hrs prior to Pre Bid interaction

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Jammu

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-JammuJammu--1180-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9890958.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 37 Items Sign in for GEM prices

#1

BOQ1

Complete supply, installation, integration, fabrication, programming, commissioning, testing & training including, Power Supply, Lighting, Civ Works, Fabrication, Dismantling, Re-configuration & Cabling as an integrated turnkey work for Ashwamedh Hall with 3 years warranty and Resident Engineer

1 job Delivery: 180 days
#2

BOQ2

Complete Cabling of Speakers, Cameras, Integrated Digital Congress Network DCN System, Sound System, PCs, Work Stations, Power Connections, Lighting & Lighting Controls and DATA/LAN Cabling with raceways and labelling

1 job Delivery: 180 days
#3

BOQ3

01 x Job for complete supply, installation, integration, fabrication, material provn, finishing, testing, training and associated works SITC for Network & Telecom cabling and components of reputed brands

1 job Delivery: 180 days
#4

BOQ4

01 x Job for complete supply, installation, integration, fabrication, material provn, finishing, testing, training and associated works SITC for Complete fitting of fire retardant electrical cables & electrical fittings of reputed brands

1 job Delivery: 180 days
#5

BOQ5

01 x Job for complete supply installation integration fabrication, material provn finishing testing training and associated works SITC for One 01 large Seventeen person seating Conference Table with seventeen Executive Chairs and associated work of a reputed brand

17 job Delivery: 180 days
#6

BOQ6

01 x Job for complete supply, installation, integration, fabrication, material provn, finishing, testing, training and associated works SITC for Acoustical Wall Paneling of 3000 Sqft as per Buyers requirement fabricated of high quality fire resistant material

3,000 sqft Delivery: 180 days
#7

BOQ7

01 x Job for complete supply, installation, integration, fabrication, material provn, finishing, testing, training and associated works SITC for Architectural Ceiling with painting for 3000 Sqft as per Buyers requirement fabricated of high quality fire resistant material

3,000 sqft Delivery: 180 days
#8

BOQ8

1 x Job for complete supply, installation, integration, fabrication, material provn, finishing, testing, training and associated works SITC for Wall Framing and conduiting 3250 Sqft as per Buyers requirement fabricated of high quality fire resistant material

3,250 sqft Delivery: 180 days
#9

BOQ9

01 x Job for complete supply, installation, integration, fabrication, material provn, finishing, testing, training and associated works SITC for Operator Console with Glass Enclosure & five Chairs

1 job Delivery: 180 days
#10

BOQ10

Complete supply, installation, integration, fabrication, civil work, programming, commissioning, testing and training SITC for 01 x LED Video Wall 1.5 PP 20 ft x 9 ft COB and Dismantling & Reinstallation of existing Data Wall at four locations as per Buyers requirement of a reputed brand.

1 job Delivery: 180 days
#11

BOQ11

Complete supply, installation, integration, programming, commissioning, testing SITC of 01 x LED Video Wall Controller 32 Input & 16 Output Port for all the data walls Displays 06 of a reputed brand.

1 job Delivery: 180 days
#12

BOQ12

Complete supply, installation, integration, programming, commissioning, testing and training for 01 x Job for Video Wall Structure fabrication on Front & Side Walls with Steel Frame and Water Proof Plywood with two 2 ft Sound Damping Panel Separation including complete dismantling, re-configuration and installation of existing Video Wall at four 04 places in the room as per Buyers requirement

1 job Delivery: 180 days
#13

BOQ13

Complete supply, installation, integration, fabrication, civil work, programming, commissioning, testing and training SITC for 01 x Job for five 20X VC Cameras with Camera Stitching, Provisioning of Stands and Look at me facility of a reputed brand.

5 nos Delivery: 180 days
#14

BOQ14

Complete supply, installation, integration, fabrication, civil work, programming, commissioning, testing and training SITC for Sixteen 30 mtr each Optical HDMI Cables from Video Wall Controller to Video Displays as per Buyers requirement of a reputed brand.

16 nos Delivery: 180 days
#15

BOQ15

Complete supply, installation, integration, fabrication, civil work, programming, commissioning, testing and training SITC for Sixteen 20 mtr each Optical HDMI Cables from Video Wall Controller to workstations as per Buyers requirement of a reputed brand.

16 nos Delivery: 180 days
#16

BOQ16

Complete supply, installation, integration, programming, commissioning, testing SITC for Sixteen 10 mtr each Optical HDMI Cables from Video Wall Controller to workstations as per Buyers requirement of a reputed brand.

16 nos Delivery: 180 days
#17

BOQ17

Complete supply, installation, integration, fabrication, material provn, finishing, testing, training and associated works SITC for 01 x Job for 06 x Environment Control Systems 4 TR High flow Hot and Cold of a reputed brand.

6 job Delivery: 180 days
#18

BOQ18

Complete supply, installation, integration, fabrication, material provn, finishing, testing, training and associated works SITC for 01 x Job for Lighting & Touch Control as per Buyers requirement at the site and drawings of a reputed brand.

1 job Delivery: 180 days
#19

BOQ19

Complete supply, installation, integration, fabrication, material provn, finishing, testing, training and associated works SITC 01 x Job for Central Power Distribution Unit CPDU Frame 100 amp UPS input and 18 x output as per Buyers requirement of a reputed brand.

1 job Delivery: 180 days
#20

BOQ20

Complete supply, installation, integration, fabrication, material provn, finishing, testing and associated works for 01 x Job for Integrated Digital Congress Network DCN incl Conf, Microphone and Sound System with LAN Cabling as per Buyers requirement of a reputed brand.

1 job Delivery: 180 days
#21

BOQ21

Complete supply, installation, integration, fabrication, material provn, finishing, testing, training and associated works SITC for 01 x UPS 20 KVA Online including Battery Bank & Rack incl fittings & power connections as per Buyers requirement of a reputed brand.

1 set Delivery: 180 days
#22

BOQ22

Complete supply, installation, integration, fabrication, material provn, finishing, testing, training and associated works SITC for Seventeen DCN Microphone with Quad Controller of a reputed brand.

17 sets Delivery: 180 days
#23

BOQ23

Complete supply, installation, integration, fabrication, civil work, programming, commissioning, testing and training SITC for One Digital Conference Controller and Amplifier of a reputed brand.

1 nos Delivery: 180 days
#24

BOQ24

Complete supply, installation, integration, fabrication, civil work, programming, commissioning, testing and training SITC for One 16 Channel Digital Microphone Mixer with Echo Cancellation of a reputed brand.

1 nos Delivery: 180 days
#25

BOQ25

Complete supply, installation, integration, fabrication, civil work, programming, commissioning, testing and training SITC for Four Dual Channel, Wireless, Handheld Microphone of a reputed brand.

4 sets Delivery: 180 days
#26

BOQ26

Complete supply, installation, integration, fabrication, civil work, programming, commissioning, testing and training SITC for One Dual Channel Wireless Lapel Microphone of a reputed brand.

1 set Delivery: 180 days
#27

BOQ27

Complete supply, installation, integration, programming, commissioning, testing and training for 120 KVA Servo Stabilizer of a reputed brand.

1 nos Delivery: 180 days
#28

BOQ28

01 x Job for complete supply, installation, integration, fabrication, material provn, finishing, testing, training and associated works SITC for Integrated Fire Alarm System with fire sensors and extinguishers for 3000 Sqft room as per Buyers requirement of a reputed brand

1 set Delivery: 180 days
#29

BOQ29

01 x Job for complete supply, installation, integration, fabrication, material provn, finishing, testing, training and associated works SITC for Three 24inch Interactive Screen reputed brand for Conference Table with Cable Cubby and one 01 customized Screen Lift System motorized for Internet VC setup.

3 nos Delivery: 180 days
#30

BOQ30

Complete supply, installation, integration, programming, commissioning, testing and training for Digital Podium with 32 inches Screen All in One on top and Signage Display in front of a reputed brand.

1 nos Delivery: 180 days
#31

BOQ31

Complete supply, installation, integration, programming, commissioning, testing and training for One 01 Work Station PC U9 or R9 or higher CPU, 64 GB or higher DDR5 RAM, 24 GB or more GPU, 512 GB or higher SSD plus 1 TB or higher SATA HDD, 01 x 32 inches 4k or higher LED Display with Win 11 OS latest ver on DVD with Activation Key a reputed brand with no hard disc return policy.

1 nos Delivery: 180 days
#32

BOQ32

Complete supply, installation, integration, programming, commissioning, testing and training for Two 02 65 Inches Commercial UHD Display Panels of a reputed brand.

2 nos Delivery: 180 days
#33

BOQ33

Complete supply, installation, integration, programming, commissioning, testing and training for Two 02 75 Inches Commercial UHD Display Panels of a reputed brand.

2 nos Delivery: 180 days
#34

BOQ34

Complete supply, installation, integration, programming, commissioning, testing and training for Two 02 AIO Desktop PCs U5 or higher CPU, 16 GB or higher DDR 5 RAM, 512 GB or higher SSD, & 23.8 inches or higher LED Display with Win 11 OS latest ver on DVD with Activation Key a reputed brand with no hard disc return policy

2 nos Delivery: 180 days
#35

BOQ35

Complete supply, installation, integration, programming, commissioning, testing and training for One 01 High Resolution Desktop Visualizer of a reputed brand.

1 nos Delivery: 180 days
#36

BOQ36

Complete supply, installation, integration, programming, commissioning, testing and training for Video Conferencing PC U7 or higher CPU, 16 GB or higher DDR 5 RAM, 08 GB or more GPU, 512 GB or higher SSD, & 23.8 inches or higher LED Display Win 11 OS latest ver on DVD with Activation Key a reputed brand with no hard disc return policy.

1 nos Delivery: 180 days
#37

BOQ37

Complete supply, installation, integration, programming, commissioning, testing and training for 03 x Spotlight Digital Presenter Pointer of a reputed brand.

3 sets Delivery: 180 days

Categories 103

AD FILM ELECTRICAL RUNWAY LIGHTING APFC PANEL PAINTING SEARCH LIGHT STRUCTURE FABRICATION UPS WOODEN TROLLEY PRODUCTION SYSTEMS EQUIPMENTS SERVO STABILIZER ARNO STARTING CONTACTOR CHAIRS ELECTROMECHANICAL MACHINERY CAMERA DISPLAY SYSTEM SOUND SYSTEM VIDEO OUTPUT DEVICE CHROMATOGRAPHY REFRIGERATORS STEEL FURNITURE CHANNEL COMPRESSED BOARD CENTRAL PROCESSING UNIT WOODEN BOARD SIGNAGE WOODEN PRODUCT DISCRETE COMPONENTS XLPE CABLE WALL PANELING WOOD SUPPLY FIRE SENSORS AUDIO EQUIPMENT ELECTRICAL SUBSTATION FIRE EXTINGUISHERS DIGITAL PODIUM SOLAR CHARGER PANEL CABLING POWER SOLAR CHARGING ALUMINIUM ALLOY AUDIO VISUAL INSTRUMENT FURNITURE ITEMS FIRE RESISTANT SOLAR BLINKER LAN ATM WOODEN PLANK ALARM SYSTEMS FITMENT VIDEO MONITORS GLUCOMETER WOODEN FURNITURE PLY WOOD ELECTRONIC PRODUCTS AND APPLIANCES FORESTRY PRODUCTS ARCHERY BOWS IT EQUIPMENT CIVIL WORK AROMATIC SPIRIT FIRE PREVENTION FIRE PREVENTION EQUIPMENTS TURNKEY BELL CONTROLLER PORT POWER DISTRIBUTION UNIT WATER LEVEL RECORDER ELECTRIC UTILITIES STABILIZER WATER SUPPLY MATERIAL WIRE ROBOTIC FUME HOODS MAGNETIC BEARING FIRE SUPPRESSION SYSTEM SUBSTATION OFFICE FURNITURE SUPERVISION SERVICE PLYWOOD CARPENTERING DIGITAL SCREEN FIBERS THREADS AND YARNS AUDIO VIDEO EQUIPMENT SCANNING ELECTRON MICROSCOPES LIGHTING BACTERIAL EXPRESSION VECTOR INFORMATION DISPLAY CABLE MICROPROCESSORS CONCEPT DESIGN FLAME DETECTORS LIFT IRRIGATION BATTERY VALVE PARTS AND ACCESSORIES ESCRAP INTERNET STRUCTURE PEB UPVC PIPE GRAPHICS CARD MERRY GO ROUND ALARM CHAIN DATA WALL DISPLAY
Advertisement