Divisional Forest Office Diglipur Dismantling & Cement Fibre Board Installation Tender 2026 Andaman & Nicobar

Bid Publish Date

18-Sep-2026, 6:47 pm

Bid End Date

09-Oct-2026, 7:00 pm

Value

₹5,00,000

Progress

Issue18-Sep-2026, 6:47 pm
AwardPending

Tender Overview

The undertaking by the Divisional Forest Office, Diglipur, North and Middle Andaman, involves Custom Bid for Discarding of Asbestos Ceiling, installation of New Cement Fibre Board, and complete debris clearing across an area of 88.56 Sqm. Execution occurs at the Divisional Store premises in Diglipur, with a mandatory completion window of 30 days from award. The scope requires site inspection beforehand, and the quoted lump-sum price must cover all labor, tools, safety gear, supply of new cement boards, GST, taxes, and transport to Diglipur. A nodal officer is available for site queries, emphasizing strict adherence to safety and quality standards to avoid contract termination. Bidders should appear with a concrete, continuous work plan, avoiding fragmentation, to meet the project’s tight schedule and avoid LDs for delays.

Technical Specifications & Requirements

  • Work scope: dismantling of asbestos ceiling, fitting of cement fibre boards, debris clearing, and site restoration for 88.56 Sqm.
  • Location: Divisional Store premises, Diglipur, North & Middle Andaman, Andaman & Nicobar.
  • Timeline: complete execution within 30 days from GeM award; LDs apply if delayed beyond target.
  • Quality & safety: strict prohibition on sub-standard materials; hazardous material handling compliance required; continuous, unified project schedule.
  • Evaluation: past performance and technical evaluation will consider documented experience in similar works; site inspection encouraged prior to costing.

Terms & Eligibility

  • 25% quantity or duration adjustment allowed before and after contract issuance; lumpsum scope may adjust up to 25% with consent.
  • All-inclusive lump-sum quotation required; must cover wages, tools, safety gear, GST, local taxes, and freight to Diglipur.
  • Penalties: standard GeM LDs for delays; contract termination and blacklisting for non-compliance; positive performance rating for timely completion.
  • Nodal officer contact provided for site inspection and clarifications; ensure preparedness for on-site evaluation and verification.

Terms & Conditions

  • Key Term 1: 30-day completion window with LDs for delays

  • Key Term 2: 25% contract quantity/duration adjustment allowed

  • Key Term 3: All-inclusive lump-sum quote covering GST and transport

Important Clauses

Payment Terms

Lump-sum service rate must include all wages, tools, safety gear, materials (new cement boards), GST, local taxes, and freight to Diglipur; no separate cost line-items.

Delivery Schedule

Complete dismantling, cement fibre board replacement, and debris clearing must be finished within 30 days of GeM award; fragmented delivery not allowed.

Penalties/Liquidated Damages

Delays beyond the 30-day window incur GeM standard LD deductions; timely completion earns a positive vendor performance rating.

Bidder Eligibility

  • Proven track record in asbestos-related removal and fibre board installation

  • Experience in delivering small- to medium-scale building cleanup within 30 days

  • Compliance with safety protocols for hazardous materials and local regulatory requirements

Advertisement

Authority & Contact

Organization

N/a

Department

NA

Office Name

Office Of Principal Chief Conservator Of Forests

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1

Similar Category

Facility Management Services - LumpSum Based Collection & Disposal Waste Management Service

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Compliance

Yes

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Experience Required

4 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

No

Item Category

Custom Bid for Services - Dismantling & Disposal of Asbestos Roof/Ceiling, Installation of Cement Fiber Boards, and Complete Debris Clearing at Divisional Forest Office, Diglipur

Delivery Details

Delivery Locations

1

Delivery Cities

North And Middle Andaman

Delivery Pincodes

744202

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
VISHAL SINGH744202,Office of the Divisional Forest Officer, Diglipur, North & Middle AndamanNorth And Middle AndamanAndaman And Nicobar Islands744202Project / Lumpsum Based--

Authority Records

MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 13

GeM-Bidding-9914921.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 4

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about ANDAMAN & NICOBAR tender market

How to bid for asbestos dismantling tender in Diglipur Andaman?

Bidders must submit an all-inclusive lump-sum quote covering wages, tools, safety gear, cement boards, GST, taxes, and transport to Diglipur. Ensure site inspection prior to costing; complete within 30 days of award to avoid LDs; adhere to hazardous material handling norms.

What documents are required for the Diglipur project bid 2026?

Prepare GST registration, PAN, experience certificates for similar works, financial statements, EMD proof, technical bid documents, OEM authorizations if applicable, and site clearance certificates. All documents must support a continuous work plan and safety compliance.

What are the key technical requirements for 88.56 Sqm renovation?

Scope includes asbestos ceiling discard, 88.56 Sqm area, installation of cement fibre boards, and debris clearance. Ensure continuous execution within 30 days, quality materials, no sub-standard components, and proper handling of hazardous materials as per scope of work.

What are the payment terms for the Diglipur procurement?

Payment is bundled in an all-inclusive lump-sum quote; it should cover wages, safety gear, materials, GST, taxes, and freight. No explicit interim payments are stated; timely completion may yield favorable performance rating on the GeM portal.

When is the delivery deadline and penalties for delays in Diglipur?

The project must finish within 30 days of award; delays incur GeM standard LD deductions from the final invoice, with a potential impact on contractor performance rating.

What is the scope of work for site inspection in Diglipur?

Nodal officer Shri. G. Thirupati is available for site inspection; bidders are encouraged to inspect the ceiling area before submitting financial estimates and to confirm site access and safety requirements.

Which items are included in the lump-sum quotation for the Diglipur job?

The lump-sum includes all labour, tools, safety equipment, material supply (cement boards), GST, local taxes, and freight/transport to Diglipur; ensure the quoted price remains inclusive even with 25% scope adjustment allowed.

What safety standards apply to asbestos-related works in this tender?

Sub-standard materials and improper handling of hazardous materials trigger immediate rejection and potential contract termination; ensure compliance with approved SOW and safety protocols referenced in the Scope of Work.