Bid Publish Date
10-Nov-2026, 11:18 am
Bid End Date
27-Nov-2026, 3:00 pm
Location
Progress
Armoured Vehicles Nigam Limited seeks procurement under multiple SPRING categories (SPRING G10.22.03, SPRING 172.22.046, SPRING 172.27.084, SPRING 172.27.095, SPRING 172.28.114) through GeM under DEFENCE PRODUCTION. The tender involves 5 BOQ items with no specified item details in the substitute list. Bidders must be established firms with GeM registration and are subject to a 50% option clause on quantity, with potential quantity fluctuation and extended delivery terms. GST applicability is bidder-claimed with actual or applicable rates capped at quoted GST. The procurement location is not disclosed in the data, but AVNL’s role in defence production anchors strict compliance and traceability.
Key differentiators include the option to adjust ordered quantities by up to 50% and the requirement to submit GSTIN, PAN, cancelled cheque, and EFT mandate. The ATC clauses emphasize compliance with GeM LTE implementation and registration prerequisites. This tender requires alignment with defence procurement norms and a strong supply chain readiness posture for potential fluctuating orders and extended delivery windows.
Product/Service: SPRING category components under AVNL procurement
Quantity/Value: Not specified in BOQ; 50% option on quantity
Delivery: Extended delivery terms may apply; minimum extension logic defined by option clause
Standards/Certifications: Not specified in data; anticipate defence procurement compliance
OEM/Brand: Not specified
50% quantity option clause at contract placement and during currency
GST handling as actual or applicable rates, whichever is lower
Submission of PAN, GSTIN, cancelled cheque, and EFT mandate
GST reimbursement as actuals or applicable rates; no explicit payment milestone specified in data
Delivery period linked to last date of original delivery order; potential extensions based on option clause calculations
Not explicitly defined in data; ATC documents may specify LDs via GeM LTE terms
Established and registered GeM firms
Submission of GSTIN, PAN, and EFT mandate
Compliance with defence procurement ATC and LTE terms
Quantity
4277
Category
SPRING 172.28.114
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
Yes (Mediation clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SPRING G10.22.03 , SPRING 172.22.046 , SPRING 172.27.084 , SPRING 172.27.095 , SPRING 172.28.114
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Tiruvallur
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Tiruvallur | Tiruvallur | - | - | 1648 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
SPRING G10.22.03
SPRING G10.22.03
SPRING 172.22.046
SPRING 172.22.046
SPRING 172.27.084
SPRING 172.27.084
SPRING 172.27.095
SPRING 172.27.095
SPRING 172.28.114
SPRING 172.28.114
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SPRING G10.22.03 | SPRING G10.22.03 | 1,648 | pieces | wm-stores | 180 | |
| 2 | SPRING 172.22.046 | SPRING 172.22.046 | 374 | pieces | wm-stores | 180 | |
| 3 | SPRING 172.27.084 | SPRING 172.27.084 | 552 | pieces | wm-stores | 180 | |
| 4 | SPRING 172.27.095 | SPRING 172.27.095 | 1,091 | pieces | wm-stores | 180 | |
| 5 | SPRING 172.28.114 | SPRING 172.28.114 | 612 | pieces | wm-stores | 180 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
Vendor Code Creation documents per Terms
Bidders must be registered GeM sellers with valid GSTIN and PAN, submit canceled cheque and EFT mandate, and comply with ATC clauses. Ensure GeM LTE readiness and confirm 50% quantity option, with potential extension. Prepare documentation in advance for vendor code creation.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, and vendor code creation materials. GST treatment follows actual or applicable rates, capped by quoted GST percentage. Ensure GST registration is active and bank details match official records.
The purchaser may increase or decrease order quantity by up to 50% at contract placement and during currency at contracted rates. Delivery timeframes scale according to the formula, with a minimum extension of 30 days. Prepare for fluctuating orders and staggered delivery planning.
Delivery terms are tied to the last date of the original order, with possible extensions under the option clause. Payment terms are governed by GeM LTE terms and are not explicitly detailed in the data; bidders should reference ATC attachments for exact milestones.
Specific standards are not listed in the data; bidders should anticipate defence procurement compliance and verify any ISI/ISO requirements in the ATC. Prepare to demonstrate quality processes and security clearances where applicable.
GST payable is based on actual rates or applicable rates, whichever is lower, up to the quoted GST percentage. Bidders must provide GSTIN and ensure GST filings align with the purchase order and invoicing terms.
Eligibility hinges on registration as a GeM vendor, validation of PAN and GSTIN, and compliance with the LT/EFT documentation. Ensure vendor code creation is completed prior to bid submission to participate in the 2026 SPRING categories.
Bidders must follow LTE guidelines in the GeM portal, be an established registered firm, and comply with the ATC requirements. The submission should include the mandated financial and banking documents for seamless evaluation and award.