TenderDekho Logo
Active GEM

ONGC Limited Cylinder Liner Extraction & Recovery Services for IHI C K-201C at LPG 1 Uran Plant 2026

Bid Publish Date

08-Oct-2026, 11:07 am

Bid End Date

23-Oct-2026, 12:00 pm

Progress

Issue08-Oct-2026, 11:07 am
AwardPending

Key Highlights

  • • OEM/Brand: IHI C (K-201C) reciprocating compressor cylinder liners
  • • Location specificity: LPG 1 plant, Uran, ONGC
  • • Quantity clarity: 02 cylinder liners to be extracted/recovered
  • • Scope flexibility: 25% up/down adjustment in contract quantity or duration

Tender Overview

ONGC Limited invites bids for specialized services to extract and recover cylinder liners from the IIIrd stage cylinders of a single IHI C (K-201C) reciprocating compressor installed at the LPG 1 plant in Uran. The scope references two cylinder liners and involves a maintenance/repair operation at a refinery-like site. The contracting framework includes a 25% flex in quantity or duration at issuance and after, with potential scope expansion for lump-sum services subject to supplier consent. The opportunity requires technical capability in high-precision mechanical extraction and liner recovery processes, without listed technical specs in the tender data.

Technical Specifications & Requirements

  • Product/Service: Extraction and recovery of cylinder liners from IIIrd stage cylinders (02 nos) of IHI C (K-201C) compressor
  • Location: LPG 1 plant, Uran, ONGC
  • BOQ: No items listed; no quantified deliverables beyond the two liners
  • Estimated value: Not disclosed; EMD not specified in available data
  • Standards/Compliance: Not specified in tender data; bidders should anticipate OEM-replacement and precision-machining requirements
  • Experience: Prior experience with IHI C compressors and high-accuracy cylinder work is implied by scope
  • Deliverables: Recovered cylinder liners suitable for rehabilitation or reconditioning
  • Key differentiators: On-site recovery work at a gas plant facility with critical equipment
  • Special terms: 25% increase/decrease in contract quantity/duration allowed at bid and post-issuance

Terms, Conditions & Eligibility

  • EMD: Not disclosed in the provided data; verify during bid submission
  • Delivery/Timeline: Not specified; seek project timeline clarification during tender clarifications
  • Payment: Not specified in the data; confirm payment terms in the contract
  • Documents: Standard project documents likely required (company registration, technical capability, prior experience)
  • Warranty/Penalties: Not specified; check for post-delivery warranty or LD clauses in final terms
  • Clause highlights: 25% quantity/duration variation permitted; lump-sum scope expansion possible with provider consent

Key Specifications

  • Product/service: Extraction and recovery of cylinder liners from IIIrd stage of IHI C (K-201C) compressor

  • Quantity: 02 liners

  • Location: LPG 1 plant, Uran (ONGC)

  • EMD/Estimated value: Not disclosed in data

  • Standards/Certification: Not specified; anticipate OEM-compliance and safety standards

  • Warranty/Support: Not specified; verify in contract

Terms & Conditions

  • 25% variation clause in contract quantity or duration

  • Lump-sum service with potential scope expansion upon consent

  • No explicit technical specs published; require clarifications

Important Clauses

Payment Terms

Not specified in tender data; confirm in contract during bid finalization

Delivery Schedule

Not specified in tender data; bidders should seek project timeline guidance

Penalties/Liquidated Damages

Not specified; verify LD/penalty framework in final contract terms

Bidder Eligibility

  • Experience in extraction/recovery of cylinder liners or similar high-precision mechanical components

  • Capability to operate within a live LPG plant environment with safety compliance

  • Financial stability to handle lump-sum service contracts and potential scope changes

Advertisement

Tender Data

Bid Details

Quantity

1

Similar Category

Repair and Overhauling Service Operation And Maintenance Of Other Machines And Plants Repair, Maintenance and Installation of Plant/ Systems/Equipments

Bid Type

Single Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Tech Clarification Time

5 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

No

Item Category

Custom Bid for Services - Hiring of Services for Extraction and Recovery of cylinder liners from IIIrd stage cylinders (02 nos) of IHI C (K-201C) reciprocating compressor installed in LPG 1 plant of ONGC Uran Plant

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

5

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Delivery Locations

1

Delivery Cities

Raigad

Delivery Pincodes

400702

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sooraj P S400702,Uran Plant, ONGC Dronagiri BVhavan Uran Distt RaigadRaigadMaharashtra400702Project / Lumpsum Based--

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 11

GeM-Bidding-9998613.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

400702

Grievance Contact

[email protected]

Categories 11

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar compressor cylinder liner extraction/recovery projects

4

Financial statements (last 2-3 years)

5

EMD/Security deposit documents (if required by final terms)

6

Technical bid documents (methodology, tools, safety plans)

7

OEM authorizations or certifications (if applicable for IHI C/K-201C components)

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for ONGC cylinder liner extraction service in Uran 2026

To bid, submit your company details, GST and PAN, plus prior experience in high-precision cylinder work. Prepare a technical approach for on-site extraction, confirm safety/ISMS compliance, and await final contract terms detailing EMD, payment, and delivery timelines.

What documents are required for ONGC Uran cylinder liner tender 2026

Required documents typically include GST certificate, PAN, company registration, financial statements, experience certificates for similar work, OEM authorizations if applicable, and technical bid with delivery methodology and safety plan; verify final terms during bid submission.

What are the delivery expectations for the IHI C liner recovery tender

The tender data does not specify timelines. Bidders should seek clarification on on-site scheduling, access windows at LPG 1 Uran plant, and acceptable downtime for extraction without impacting plant operations.

What are the minimum experience criteria for ONGC cylinder work

Minimum experience is not listed; bidders should demonstrate prior similar projects involving high-precision liner extraction or compressor component recovery, including safety and QA certifications and references from refinery or gas-plant environments.

What is the 25% variation clause in ONGC procurement

Contract allows a 25% up/down adjustment in quantity or duration at bid issuance and after contract issuance; any scope/value changes require the service provider’s consent and must be documented in a contract amendment.

What standards or certifications are expected for ONGC cylinder work

No specific standards are listed in the data. Bidders should anticipate OEM compatibility with IHI C (K-201C) components, plus general safety and quality controls for high-precision mechanical work in an energy facility.

How to prepare for price and scope clarification for Uran tender

Prepare a lump-sum price with breakdown for two cylinder liners and potential scope options; ensure your bid includes risk allowances for on-site extraction, safety compliance, and potential 25% scope changes, pending final terms from ONGC.

What are the payment terms for ONGC cylinder liner service

Payment terms are not disclosed in the current data; bidders should await contract terms that specify payment milestones, submission of invoices, and average clearance time after delivery or service completion.

Advertisement