Organization: Uttar Pradesh Power Corporation Limited (UPPCL) under the Energy Department, Uttar Pradesh. Procurement scope: Repair, maintenance, and installation services for a 132 KV substation at Aurangabad, Mathura, including maintenance of 1 high mast at the 132 KV Substation Aurangabad, Mathura. Estimated value: ₹9,971.40. Location: Mathura, Uttar Pradesh 281001. Key differentiator: Scope includes service for high mast maintenance and substation equipment under a single service provider arrangement; quantity/scale can be adjusted by up to 25% per the option clause. Unique aspect: No BOQ items listed; tender emphasizes serviceability in electrical substation maintenance.
Electrical substation maintenance for 132 KV S/S Aurangabad, Mathura
Maintenance of 1 high mast at 132 KV Substation Aurangabad
Estimated value: ₹9,971.40
Option clause allowing up to 25% increase in quantity/duration
No BOQ items available; scope inferred from tender description
25% contract quantity/duration variation allowed
EMD amount and payment terms not disclosed in data
No BOQ items; verify scope and deliverables from final tender document
Payment terms not disclosed in the provided data; bidders must refer to the official tender terms for milestone and mode of payment.
Delivery/operational schedule is unspecified; the final contract will define on-site maintenance timelines at 132 KV S/S Aurangabad, Mathura.
No LD details provided; verify during bid submission per organization policy.
Electrical service provider with substation maintenance experience
Valid GST registration and PAN
Evidence of previous maintenance for high-must or 132 KV substations (preferred)
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - 132 KV S/S Aurangabad; Repair and maintainance of 1 No of high mast at 132KV Substation Aurangabad Mathura; Service Provider
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Mathura
Delivery Pincodes
281001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Raj Kumar Verma | 281001,ELECTRICITY TRANSMISSION DIVISION 132 KV SUB STATION AURANGABAD MATHURA | Mathura | Uttar Pradesh | 281001 | Project / Lumpsum Based | - | Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 0 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates demonstrating substation maintenance capability
Financial statements or solvency proof (as required by terms)
Technical bid documents and any OEM authorizations if applicable
EMD submission proof (amount and mode to be confirmed)
Key insights about UTTAR PRADESH tender market
Bidders should register on the government e-tender portal, obtain the tender documents, and submit the technical bid with GST, PAN, experience certificates, and proposed scope. Ensure compliance with the 25% option clause and confirm EMD amount from the portal.
Required documents include GST registration, PAN, experience certificates in substation maintenance, financial statements, OEM authorizations if applicable, and EMD proof. Technical bid documents must detail scope for 132 KV S/S Aurangabad and 1 high mast maintenance.
The tender indicates an estimated value of ₹9,971.40. Bidders should confirm currency and any applicable taxes during bid submission and in the final contract, including potential SOW adjustments within the 25% option clause.
Eligibility favors firms with proven substation maintenance experience, valid GST and PAN, and financial stability. Submit prior project certificates, safety compliance records, and maintenance capabilities for 132 KV equipment to strengthen eligibility.
No BOQ items are listed in the available data. Bidders should rely on the tender text to define scope and ensure all essential deliverables, including high mast maintenance, are covered in the technical bid.
The buyer may increase or decrease contract quantity or duration by up to 25% at contract issuance and later, with the vendor’s acceptance. This requires flexible resource planning and pricing strategies.
Payment terms are not specified in the excerpt. Bidders should check the official tender document for milestones, payment mode, and timelines, typically linked to acceptance of deliverables and maintenance milestones.
Specific standards are not listed; bidders should demonstrate electrical safety compliance, proper high mast maintenance capabilities, and relevant certifications (e.g., electrical safety authorizations) during technical evaluation.
Sign up now to access all documents
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS