Steel Almirah / Cabinets conforming to IS 3312 (V4)
Indian Army
DARJEELING, WEST BENGAL
Bid Publish Date
10-Nov-2025, 12:00 am
Bid End Date
01-Dec-2025, 4:00 pm
Location
Progress
Quantity
10
Bid Type
Two Packet Bid
Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl), Lucknow. Procurement: Steel almirah/cabinets conforming to IS 3312 (V4), with PAC-only eligibility. The tender scope shows no BOQ items and an undefined estimated value or EMD. The buyer reserves a 25% quantity variation during contract placement and also during the contract period, at contracted rates. The delivery schedule is tied to the original delivery period, with extended time calculated as: (increased quantity ÷ original quantity) × original delivery period, minimum 30 days, potentially extending to the original delivery window. This tender emphasizes standard-compliant steel storage solutions for energy sector assets in Uttar Pradesh.
Product/service: Steel almirah/cabinets
Standards: IS 3312 (V4) - CABINETS 3rd party verification
Category: Q3, PAC Only
Quantity: Not specified (flexible up to 25% as per option clause)
Delivery: As per original delivery period with extended time rules
Documentation: ATC file referenced; ensure review and compliance
EMD amount not disclosed in data; confirm at bid stage
Delivery window governed by original period; extensions follow formula
Quantity may vary by up to 25% during and after contract
IS 3312 (V4) compliance mandatory for all cabinets
Purchaser may increase/decrease quantity up to 25% at contract award and during currency; extended delivery time calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
Delivery period commences from the last date of the original delivery order; extended periods follow the option clause and formula described.
Bidder must view and comply with the ATC document uploaded by the buyer; additional technical conditions may be contained therein.
PAC-only procurement eligibility in Uttar Pradesh energy sector
IS 3312 (V4) conformance demonstrated for steel almirah cabinets
Experience in supplying steel storage furniture to public sector or energy utilities (preferred)
Indian Army
DARJEELING, WEST BENGAL
N/a
SOLAN, HIMACHAL PRADESH
N/a
HYDERABAD, TELANGANA
N/a
GONDIA, MAHARASHTRA
Central Railway
NASHIK, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates relevant to steel furniture/cabinets
Financial statements (latest audited, if requested)
EMD submission documentation (amount not specified in data; confirm)
Technical bid documents demonstrating IS 3312 (V4) compliance
OEM authorization or dealer/sub-dealer agreements if applicable
Any PAC-specific authorization or compliance certificates
Extended Deadline
01-Dec-2025, 4:00 pm
Opening Date
01-Dec-2025, 4:30 pm
Extended Deadline
25-Nov-2025, 4:00 pm
Opening Date
25-Nov-2025, 4:30 pm
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD documents, and technical compliance proofs demonstrating IS 3312 (V4) conformance. Review the ATC for PAC-only requirements and confirm any PAC authorization. Ensure delivery plan matches the option clause’s 25% quantity variation.
Required documents include GST registration, PAN, company financial statements, experience certificates for steel furniture supply, EMD proof, OEM authorization if applicable, and technical bid showing IS 3312 (V4) compliance; PAC-specific compliance may be needed per ATC.
Delivery timing follows the original delivery period; if quantities increase under the option clause, extended time is calculated as (increased/ original) × original period with a minimum of 30 days, and may extend to the original delivery window.
Cabinets must conform to IS 3312 (V4); bidders should provide certification or testing reports validating IS 3312 (V4) compliance and PAC eligibility as specified in the ATC.
Eligibility emphasizes PAC-only procurement with IS 3312 (V4) conformance, prior supply experience in steel storage furniture to public sector or energy utilities, and regulatory GST/PAN compliance; review ATC for any additional criteria.
Quantities may be adjusted up to 25% during contract placement and throughout the currency; delivery time adjusts per the option clause formula, ensuring a minimum 30-day extension.
Kamdhenu University
📍 AMRELI, GUJARAT
Directorate Of Employment & Training
📍 SURAT, GUJARAT
N/a
📍 KANKER, CHHATTISGARH
Central Coalfields Limited
📍 HAZARIBAG, JHARKHAND
Assam Rifles
Access all tender documents at no cost
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS