Bid Publish Date
13-Mar-2026, 1:23 am
Bid End Date
23-Mar-2026, 9:00 am
Progress
Organization: Jammu and Kashmir State Sports Council. Procurement: fixed-leg tripods for surveying instruments, conforming to IS 8330. Location: Jammu & Kashmir; procurement context centers on standard-compliant field equipment. Quantity/Value: not disclosed; estimated scope appears aligned to government procurement of generic tripods with dimensional and constructional specifics. Key differentiator: strict IS 8330 conformity, emphasis on material, woods for legs, packing, and marking. Unique clause enables 25% quantity variation and extended delivery terms.
Product/service: Tripods for surveying instruments, fixed leg type
Standards: IS 8330 conformity
Materials: Specified generic category (not detailed in data)
Dimensions/Construction: Length, woodworking for legs, overall finishing and packing
Accessories: Included per BOQ/Title (not enumerated)
Marking/Finish: Required as per generic terms; packaging compliance
Qty can increase/decrease up to 25% at contract placement and during currency with rates unchanged
Establish or demonstrate a Functional Service Centre in each consignee state within 30 days of award
Payment release contingent on documentary evidence of service capability; on-site warranty may apply
Delivery timeline adjustments use the formula: (Increased quantity ÷ Original quantity) × Original delivery period with a 30-day minimum
EMD and exact estimated value not disclosed in accessible data
Payment terms require documentary evidence of a Functional Service Centre in the consignee state; exact payment schedule not specified in provided data.
Delivery period can be extended via option clause; additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Not specified in available tender data; bidders should refer to buyer terms for LD provisions.
Functional Service Centre in the State of each consignee location or a clear plan to establish within 30 days of award
Experience in supplying surveying tripods or similar equipment
Compliance with IS 8330 conformity and related quality standards
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | AD CONTRACTS & SUPPLIES Under PMA | Make : NA Model : JP-PMS-7719 | 22-03-2026 23:18:32 | |
| 2 | R A IMPEX Under PMA | Make : NA Model : JP-PMS-7719 | 22-03-2026 23:24:28 | |
| 3 | RSR VENTURES Under PMA | Make : NA Model : JP-PMS-7719 | 22-03-2026 23:51:02 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | RSR VENTURES( MSE Social Category:General ) Under PMA | Item Categories : Tripods for Surveying Instruments - Fixed Leg Type as per IS 8330 | |
| L2 | AD CONTRACTS & SUPPLIES Under PMA | Item Categories : Tripods for Surveying Instruments - Fixed Leg Type as per IS 8330 | |
| L3 | R A IMPEX( MSE Social Category:General ) Under PMA | Item Categories : Tripods for Surveying Instruments - Fixed Leg Type as per IS 8330 |
Please sign in or create an account to view contract details and download result documents.
Quantity
12
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Tripods for Surveying Instruments - Fixed Leg Type as per IS 8330 (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration
PAN card
Experience certificates for similar tripod supply
Financial statements (annual reports, turnover proof)
EMD/Security deposit documentation (amount not disclosed)
Technical bid documents showing IS 8330 conformity
OEM authorizations or Maharashtra/OEM service capability proof
Proof of functional Service Centre in consignee state or plan to establish within 30 days
Any other statutory compliance documents requested in Terms and Conditions
| Category | Specification | Requirement |
|---|---|---|
| Genric | Conformity to IS 8330 | Yes |
| Genric | Material | As per Clause 3 |
| Genric | General Requirement | As per Clause 4 |
| Genric | Dimensional and Constructional Requirements | As per Clause 5 |
| Genric | Length | 1.5 - 1.6 m |
| Genric | Type of Woods for Legs | Teak |
| Genric | Accessories | As per Clause 6 |
| Genric | Finish | As per Clause 7 |
| Genric | Marking | As per Clause 9 |
| Genric | Packing | As per Clause 10 |
Bidders must submit GST, PAN, experience certificates, financial statements, EMD documents, and technical compliance showing IS 8330 conformity. Include OEM authorizations if applicable, and evidence of a functional service centre or a plan to establish within 30 days of award.
Required documents include GST certificate, PAN, experience certificates for similar tripods, financial statements, EMD submission proof, technical bid with IS 8330 conformity, and OEM authorization. Ensure service-centre proof or establishment plan is provided.
Delivery terms permit a 25% quantity variation with adjusted delivery period per formula: (increased/original quantity) × original delivery period, minimum 30 days. Payment terms hinge on documentary evidence of service capability; explicit schedule not disclosed.
Tripods must conform to IS 8330 standard. Additional materials, finish, marking, and packing must comply with generic but explicit quality expectations outlined in the tender terms.
A functional service centre must be established within 30 days of award for each consignee state; submission of evidence is required before payment release.
Eligibility requires IS 8330 conformity, demonstrated capability to supply tripods, and either existing service centres in the state or an approved plan to set up within 30 days of award.
Penalty details are not specified in the available data. Bidders should review the full terms for any LD provisions and ensure delivery timelines align with option-clause extensions.
The purchaser may increase or decrease up to 25% of bid/contract quantity at the time of order placement and during the currency, at contracted rates.