Bid Publish Date
14-Oct-2026, 6:36 pm
Bid End Date
26-Oct-2026, 11:00 am
Location
Progress
[object Object]
Key term: Quantity may vary ±25% with extended delivery under contract
Key term: Pre-dispatch or post-receipt inspection by ASP-assigned agency
Key term: Annexure governs design, fabrication, and supply details including materials and dimensions
Not explicitly stated in the provided data; bidders should anticipate standard government procurement terms and confirm with issuing authority during bid submission
Delivery period governed by option clause; minimum 30 days for extended delivery; base period defined by original delivery order date
Risk Purchase provision active if delivery is not completed as per contract; specific LD rates not provided in data
Demonstrated capacity to design and fabricate SS316 orifice plates per ISO-5167
Financial capability to manage procurement of stainless steel components and carbon steel flanges
Experience in supplying CBM gas flow measurement assemblies to similar industries
Quantity
7
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
ORIFICE PLATE ASSEMBLY ( MAT CODE 278671305)
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Paschim Bardhaman
Delivery Pincodes
713208
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Manjai Madhawa | 713208,Alloy Steels Plant Durgapur | Paschim Bardhaman | West Bengal | 713208 | 7 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Cancelled cheque copy
EFT mandate certified by bank
Experience certificates for similar ORIFICE PLATE assemblies
Technical compliance certificates and any OEM authorizations if applicable
Proof of capability to meet ISO-5167/SS316 fabrication standards
Any pre-allocated inspection plan or prior approval data
Key insights about WEST BENGAL tender market
Bidders must submit GST, PAN, cancelled cheque, and EFT mandate; provide ISO-5167 compliant SS316 plate fabrication capability; ensure ASP pre/post inspection readiness and conform to annexure design specs for 100 mm NB, 4 mm plate thickness, and 8-hole carbon steel flanges.
Prepare GSTIN, PAN, bank EFT mandate, cancelled cheque, and experience certificates for similar ORIFICE plate projects; include technical compliance certificates and OEM authorizations if applicable; ensure pre-dispatch/post-receipt inspection readiness per ASP guidance.
The design should follow ISO-5167 for concentric orifice plates; SS316 material with 4 mm thickness; 100 mm NB pipe size; carbon steel flanges with 8 holes of 18 mm diameter; flow accuracy ±1%.
Quantity can be increased or decreased by up to 25% of the bid quantity; delivery period adjusts proportionally using the specified formula with a minimum 30 days extension.
Pipe size 100 mm NB, 4 mm thick SS316 plate, 8-hole carbon steel flanges, 18 mm holes; flow 0–500 Sm3/hr, density 0.739 kg/Nm3, CBM gas with CH4 97%; accuracy ±1% and 600 mmWC nominal pressure, 300–1000 mmWC range.
Nominated ASP inspection entity will conduct either pre-dispatch at seller premises or post-receipt inspection at ASP stores, as per ATC/annexure; ensure compliance with testing and approval of orifice data before manufacturing.
In case of non-delivery, the purchaser may exercise risk purchase remedies; ensure tender compliance with delivery commitments and annexure-defined material specs to mitigate penalties.