TenderDekho Logo
Active GEM

Indian Navy Goods Supply Tender India for Detailed Design Drawings Approval 21 Days 2026

Bid Publish Date

29-Aug-2026, 5:32 pm

Bid End Date

19-Sep-2026, 6:00 pm

Progress

Issue29-Aug-2026, 5:32 pm
AwardPending

Tender Overview

Organization: Indian Navy (Department Of Military Affairs). Procurement: supply of goods with mandatory Detailed Design Drawings approval prior to fabrication. Estimated delivery contingencies depend on buyer approval timing. Location details are not specified in the data. The tender emphasizes design-finalization within 21 days post-award, with a 15-day window for modification feedback. Acknowledges potential quantity adjustments up to 50% during and after contract award. Emphasizes that imported products require Indian-based after-sales support through the OEM or authorized seller. Aims to ensure items are current, non-obsolete, and have minimum 3 years market life post-award, with GST considerations managed by bidders. The scope is limited to supply of GOODS, with design alignment to approved drawings and modifications as communicated by the Buyer.

Technical Specifications & Requirements

  • Scope of supply: Only supply of GOODS.
  • Design process: submit Detailed Design Drawings within 21 days of award; buyer to approve or list modifications within 15 days.
  • Delivery impact: delivery period adjusts if drawing approvals are delayed; no liquidated damages for Buyer-drawn delays.
  • Quantity flexibility: option clause allows up to 50% increase or decrease at time of award and during currency at contracted rates.
  • OEM/Support: imported products must have an Indian-registered office for after-sales service; OEM authorization required.
  • Market life: offered products must have at least 3 years residual market life and not be deemed end-of-life by OEM.
  • Bidder setup: bidders must adhere to GST obligations and provide standard bid documents for vendor code creation.

Terms, Conditions & Eligibility

  • DD/Drawing approvals: submit Detailed Design Drawings within 21 days; buyer’s disposition within 15 days.
  • Financial standing: bidder must not be undergoing liquidation or bankruptcy; provide an undertaking.
  • Obsolescence: bid products must have at least 3 years residual market life; not end-of-life.
  • GST/Tax: bidder responsible for GST; reimbursement as actual or applicable rate, whichever is lower.
  • Vendor code & documents: submit PAN, GSTIN, cancelled cheque, EFT mandate certified by bank.
  • Option clause: quantity may vary by up to 50%; delivery timelines recalculated accordingly.
  • Scope: bid price must include all costs for GOODS delivery; no service component.

Key Specifications

  • Scope: supply of GOODS

  • Detailed Design Drawings due: 21 days from award

  • Modification feedback window: 15 days

  • Delivery impact: no LD for Buyer drawing delays

  • Option clause: up to 50% quantity variation

  • Imported products: Indian-based after-sales office required

  • OEM or Authorized Seller registration in India

  • Minimum market life: 3 years residual life

Terms & Conditions

  • DDDs must be approved or listed for modification within 21 days

  • Bidder must provide GST, PAN, cancelled cheque and EFT mandate

  • Quantity may be adjusted by up to 50% with corresponding delivery recalculation

Important Clauses

Payment Terms

GST reimbursement as actuals or applicable rate, whichever is lower; bidder to manage GST.

Delivery Schedule

Delivery period adjusted for drawing approval delays; no LD for Buyer approval delays.

Penalties/Liquidated Damages

No LD imposed for delays caused by Buyer drawing approvals; other LD terms not specified.

Bidder Eligibility

  • Not under liquidation, court receivership or bankruptcy; provide undertaking

  • Non-obsolescence: product must have 3 years residual market life

  • OEM authorization for imported goods with Indian after-sales support

Tender Data

Bid Details

Quantity

1620

Category

EC6948D-1090076

Bid Type

Single Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

EC6948D-106-0735 , EC6948D-1090074 , EC6948D- 1090076 , EC6948D-1090077 , EC6948D-1121102 , EC6948D-112-1102 , EC6948D-1135304 , EC6948D-122- 7375 , EC6948D-125-5274 , EC6948D-1260577 , EC6948D- 126-2702 , EC6948D-129-9452 , EC6948D-137-5541 , EC6948D-150-1156 , EC6948D-1632478 , EC6948D- 1777375 , EC6948D-180-7350 , EC6948D-1808424 , EC6948D-186-2001 , EC6948D-194-6725 , EC6948D- 1N3825 , EC6948D-1R0749 , EC6948D-1R-0755 , EC6948D- 1R-1808 , EC6948D-201-6615 , EC6948D-201-6616 , EC6948D-2027530 , EC6948D-2054831 , EC6948D-2076890 , EC6948D-2081233 , EC6948D-216-5582 , EC6948D-218- 3840 , EC6948D-224-3983 , EC6948D-225-3099 , EC6948D- 2275538 , EC6948D-230-2569 , EC6948D-2303728 , EC6948D-2303775 , EC6948D-232-3226 , EC6948D-232- 3232 , EC6948D-236-1525 , EC6948D-2361637 , EC6948D- 2388708 , EC6948D-2388709 , EC6948D-246-5659 , EC6948D-247-9908 , EC6948D-2485513 , EC6948D- 2517222 , EC6948D-2556863 , EC6948D-2588117 , EC6948D-264-4297 , EC6948D-2707193 , EC6948D-270- 7257 , EC6948D-2968388 , EC6948D-2A-4429 , EC6948D- 2H3935 , EC6948D-2P3760 , EC6948D-2W0482 , EC6948D- 322-8594 , EC6948D-322-8595 , EC6948D-332-9539 , EC6948D-344-5153 , EC6948D-349-2568 , EC6948D-355- 6043 , EC6948D-3658396 , EC6948D-375-4703 , EC6948D- 3777037 , EC6948D-3849908 , EC6948D-3G8856 , EC6948D-3H5896 , EC6948D-3P0650 , EC6948D-3P0655 , EC6948D-3S4489 , EC6948D-415-2432 , EC6948D-4907198 , EC6948D-490-7200 , EC6948D-4N0913 , EC6948D-5S9134 , EC6948D-6L7817 , EC6948D-6V5048 , EC6948D-6V5064 , EC6948D-6V-5554 , EC6948D-7C-0145 , EC6948D-8C3681 , EC6948D-8T1703 , EC6948D-8T4983 , EC6948D-8T4984 , EC6948D-9L6647 , EC6948D-9N3040 , EC6948D-9X7317 , EC6948D-9X-7378 , EC6948D-9X-7430

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

14

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

VISHAKHAPATNAM CITY

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-VISHAKHAPATNAM CITYVISHAKHAPATNAM CITY--2180-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9697880.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Navy

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 92 Items Sign in for GEM prices

#1

EC6948D-106-0735

CONTROL GP

2 no Delivery: 180 days
#2

EC6948D-1090074

OIL COOLER SOR

1 no Delivery: 180 days
#3

EC6948D-1090076

OIL COOLER SOR

11 no Delivery: 180 days
#4

EC6948D-1090077

OIL COOLER SOR

4 no Delivery: 180 days
#5

EC6948D-1121102

SEA WATER LINE SEAL O RING (SOR)

6 no Delivery: 180 days
#6

EC6948D-112-1102

SEAL-O-RING

2 no Delivery: 180 days
#7

EC6948D-1135304

SEAL O RING

1 no Delivery: 180 days
#8

EC6948D-122-7375

GUIDE

55 no Delivery: 180 days
#9

EC6948D-125-5274

CAP-RADIATOR

1 no Delivery: 180 days
#10

EC6948D-1260577

BREATHER AS

9 no Delivery: 180 days
#11

EC6948D-126-2702

SEAL GP-CSHF

4 no Delivery: 180 days
#12

EC6948D-129-9452

GASKET

57 no Delivery: 180 days
#13

EC6948D-137-5541

PUMP AS

4 no Delivery: 180 days
#14

EC6948D-150-1156

BOLT-SPL

13 no Delivery: 180 days
#15

EC6948D-1632478

SEALl-VALVE

88 no Delivery: 180 days
#16

EC6948D-1777375

ELEMENT - AIR FILTER

25 no Delivery: 180 days
#17

EC6948D-180-7350

PIN-PISTON

13 no Delivery: 180 days
#18

EC6948D-1808424

SEAL O RING

1 no Delivery: 180 days
#19

EC6948D-186-2001

ROTOCOIL AS

84 no Delivery: 180 days
#20

EC6948D-194-6725

SENSOR GR-RR

5 no Delivery: 180 days
#21

EC6948D-1N3825

BOLT

3 no Delivery: 180 days
#22

EC6948D-1R0749

FUEL FILTER

109 no Delivery: 180 days
#23

EC6948D-1R-0755

FUEL FILTER (SEC)

3 no Delivery: 180 days
#24

EC6948D-1R-1808

LUB OIL FILTER

21 no Delivery: 180 days
#25

EC6948D-201-6615

SENSOR-GP-SP

8 no Delivery: 180 days
#26

EC6948D-201-6616

SENSOR GP

6 no Delivery: 180 days
#27

EC6948D-2027530

SEAL

6 no Delivery: 180 days
#28

EC6948D-2054831

SEAL O RING

1 no Delivery: 180 days
#29

EC6948D-2076890

ELEMENT

5 no Delivery: 180 days
#30

EC6948D-2081233

CLAMP

2 no Delivery: 180 days
#31

EC6948D-216-5582

BEARNIG-SLEE

17 no Delivery: 180 days
#32

EC6948D-218-3840

SENSOR GP-PRESSURE

6 no Delivery: 180 days
#33

EC6948D-224-3983

INSERT SEAT

39 no Delivery: 180 days
#34

EC6948D-225-3099

GASKET-CYL H

9 no Delivery: 180 days
#35

EC6948D-2275538

SEAL O RING

1 no Delivery: 180 days
#36

EC6948D-230-2569

RETAINER-P

3 no Delivery: 180 days
#37

EC6948D-2303728

SEAL

2 no Delivery: 180 days
#38

EC6948D-2303775

SEAL

2 no Delivery: 180 days
#39

EC6948D-232-3226

BEARING-CONNECTING

13 no Delivery: 180 days
#40

EC6948D-232-3232

ROD AS

17 no Delivery: 180 days
#41

EC6948D-236-1525

SEAL INTEGRA

1 no Delivery: 180 days
#42

EC6948D-2361637

SEAL

1 no Delivery: 180 days
#43

EC6948D-2388708

GASKET

5 no Delivery: 180 days
#44

EC6948D-2388709

GASKET

2 no Delivery: 180 days
#45

EC6948D-246-5659

RING-PISTON

13 no Delivery: 180 days
#46

EC6948D-247-9908

SPRING VALVE

61 no Delivery: 180 days
#47

EC6948D-2485513

COOLANT THERMOSTATE (92 DEG)

13 no Delivery: 180 days
#48

EC6948D-2517222

ELEMENT - AIR FILTER

54 no Delivery: 180 days
#49

EC6948D-2556863

GASKET FOR EXHAUST ELBOW

6 no Delivery: 180 days
#50

EC6948D-2588117

KIT-GASKET-S

13 no Delivery: 180 days
#51

EC6948D-264-4297

CONTROL GP

12 no Delivery: 180 days
#52

EC6948D-2707193

HOSE

4 no Delivery: 180 days
#53

EC6948D-270-7257

FILTER KIT

18 no Delivery: 180 days
#54

EC6948D-2968388

IMPELLER

6 no Delivery: 180 days
#55

EC6948D-2A-4429

LOCK

145 no Delivery: 180 days
#56

EC6948D-2H3935

THERMOSTATE HOUSING SOR

1 no Delivery: 180 days
#57

EC6948D-2P3760

GASKET

7 no Delivery: 180 days
#58

EC6948D-2W0482

STUD

3 no Delivery: 180 days
#59

EC6948D-322-8594

PUMP GP-AUX

1 no Delivery: 180 days
#60

EC6948D-322-8595

IMPELLER

8 no Delivery: 180 days
#61

EC6948D-332-9539

CARTRIDGE-GP

1 no Delivery: 180 days
#62

EC6948D-344-5153

RING-PISTON

13 no Delivery: 180 days
#63

EC6948D-349-2568

RING-PISTON

13 no Delivery: 180 days
#64

EC6948D-355-6043

TUBE AS - OIL JET

18 no Delivery: 180 days
#65

EC6948D-3658396

ENGINE COOLANT (ELC) 18 LIT PAIL

29 no Delivery: 180 days
#66

EC6948D-375-4703

PUMP GP-AUX

2 no Delivery: 180 days
#67

EC6948D-3777037

FRESH WATER REBUILD KIT

1 no Delivery: 180 days
#68

EC6948D-3849908

CRANK SHAFT AS

1 no Delivery: 180 days
#69

EC6948D-3G8856

WASHER

2 no Delivery: 180 days
#70

EC6948D-3H5896

BOLT

5 no Delivery: 180 days
#71

EC6948D-3P0650

OIL COOLER SOR

1 no Delivery: 180 days
#72

EC6948D-3P0655

SEAL O RING

4 no Delivery: 180 days
#73

EC6948D-3S4489

SEAL O RING

1 no Delivery: 180 days
#74

EC6948D-415-2432

SENSOR GP-TE

1 no Delivery: 180 days
#75

EC6948D-4907198

VALVE INTAKE

2 no Delivery: 180 days
#76

EC6948D-490-7200

VALVE-EXHAUS

2 no Delivery: 180 days
#77

EC6948D-4N0913

SCREEN

1 no Delivery: 180 days
#78

EC6948D-5S9134

SEAL O RING

7 no Delivery: 180 days
#79

EC6948D-6L7817

FRESH LINE SEAL O RING

4 no Delivery: 180 days
#80

EC6948D-6V5048

SEAL O RING

1 no Delivery: 180 days
#81

EC6948D-6V5064

SEAL O RING

1 no Delivery: 180 days
#82

EC6948D-6V-5554

SEAL O RING

4 no Delivery: 180 days
#83

EC6948D-7C-0145

CORE AS

1 no Delivery: 180 days
#84

EC6948D-8C3681

CM-HOSE STK

400 no Delivery: 180 days
#85

EC6948D-8T1703

OIL COOLER SOR

4 no Delivery: 180 days
#86

EC6948D-8T4983

HEX HOSE CLAMP

18 no Delivery: 180 days
#87

EC6948D-8T4984

SEA PUMP CLAMP ASSEMBLY

30 no Delivery: 180 days
#88

EC6948D-9L6647

VEE BELT

3 no Delivery: 180 days
#89

EC6948D-9N3040

SEA WATER OIL LINE (HOSE )

1 no Delivery: 180 days
#90

EC6948D-9X7317

SEAL O RING

2 no Delivery: 180 days
#91

EC6948D-9X-7378

SEAL

1 no Delivery: 180 days
#92

EC6948D-9X-7430

SEAL O RING

13 no Delivery: 180 days

Categories 48

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled Cheque copy

4

EFT Mandate copy certified by Bank

5

Undertaking of non-liquidation or non-bankruptcy

6

Details for Detailed Design Drawings submission

7

OEM authorization / authorized seller documentation for import scenarios

8

Bidder declaration of non-obsolescence (3 years residual market life)

9

GST considerations acknowledgment

Frequently Asked Questions

How to bid for Indian Navy goods supply tender with DDD approval

Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate and an undertaking of financial stability. Provide Detailed Design Drawings within 21 days of award, with buyer feedback within 15 days. Ensure products have at least 3 years residual market life and, for imports, OEM authorization and Indian after-sales support.

What documents are required for印度 Navy procurement submission

Submit PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, and an undertaking of non-liquidation. Include any OEM authorizations for imported goods and evidence of 3-year market life. Also provide Detailed Design Drawings plan and any GST compliance declarations.

What are the key technical requirements for the goods tender

Core requirements specify supply of GOODS with DDD alignment to approved drawings. Ensure before fabrication that all drawings are approved or clearly modified per buyer list within 15 days. Confirm OEM authorization for imports and maintain minimum 3-year market life for offered products.

When is the drawing approval deadline and modification window

Submit Detailed Design Drawings within 21 days of award; buyer will issue approval or a modification list within 15 days. Delay in approval shifts the delivery period, with no liquidated damages for such Buyer delays.

What is the option clause for quantity variation in this tender

Purchaser may increase or decrease the bid quantity up to 50% at contract placement and during the currency at contracted rates. Additional delivery time is calculated as (Increased quantity / Original quantity) × Original delivery period, minimum 30 days.

Are imported products allowed and what after-sales support is required

Imported products require an OEM or Authorized Seller with a registered Indian office for after-sales service. Provide OEM authorization, ensure Indian-based service capability, and align with IS/standards requested by the buyer.

What are the GST requirements and payment terms

Bidders bear GST obligations; reimbursement will be actuals or applicable rate, whichever is lower. Ensure GST compliance documentation is ready; payment terms are aligned with supplier’s terms and government regulations—no fixed percentage is stated in the data.

What is the minimum market life requirement for bids

Bidders must ensure offered products have at least 3 years residual market life and should not be declared end-of-life by the OEM before this period; provide evidence or certification confirming product lifecycle commitment.