TenderDekho Logo
Closed GEM

Procurement Opportunity: CGI and IIS PC with following configuration_Equivalent or higher Motherboard _ASUS by Intel motherb in BANGALORE, KARNATAKA

Bid Publish Date

03-Jul-2025, 12:17 pm

Bid End Date

02-Aug-2025, 1:00 pm

EMD

₹10,505

Progress

RA
Issue03-Jul-2025, 12:17 pm
Reverse Auction02-Dec-2025, 10:00 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

4064

Category

CGI and IIS PC with following configuration_Equivalent or higher Motherboard _ASUS by Intel motherboard with following

Bid Type

Two Packet Bid

Categories 85

A tender has been published for Indian Army CGI and IIS PC with following configuration_Equivalent or higher Motherboard _ASUS by Intel motherb in BANGALORE, KARNATAKA. Quantity: 4064 by. Submission Deadline: 02-08-2025 13: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7810527.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 114 Items Sign in for GEM prices

#1

CGI and IIS PC with following configuration_Equivalent or higher Motherboard _ASUS by Intel motherboard with following

As Per Specifications

6 set Delivery: 90 days
#2

Sound System_5_1 Channel Sound System_Speaker 5 _1_ Approx _ Speaker power_ 25W RMS per channel 4channel_

As Per Specifications

4 nos Delivery: 90 days
#3

UPS _UPS 5 KVA On line _Output Power Capacity 5000 VA Max Output Voltage 230V_ Efficiency at Full Load 92percentage_

As Per Specifications

2 nos Delivery: 90 days
#4

Ethernet Switch _Hub__8_port Ethernet Switch _Hub__8 Port 100Mbps Switch with_8 100Mbps Nway auto ports

As Per Specifications

2 nos Delivery: 90 days
#5

KVM switch_KVM switch _1_4_ _4 Port USB KVM switch _1_4_ _One USB console controls 4 computer

As Per Specifications

2 nos Delivery: 90 days
#6

HDMI Splitter 4 Port_1 x 4 HDMI Splitter 4K Support_Connector Type _ HDMICable Type _HDMI

As Per Specifications

6 nos Delivery: 90 days
#7

Printer__Laser printer__Printer Black_ Print speed Up to 14 ppm_ _normal_ A4_

As Per Specifications

2 nos Delivery: 90 days
#8

DVD Blank__DVD Blank with jewel case__Recordable DVD 4_7 GB_120 minuts with jewel case_

As Per Specifications

16 nos Delivery: 90 days
#9

PCI Serial Card_PCI Card 2xSerial Port_Supports PCI IRQ sharing_saves valuable resources for other expansion card

As Per Specifications

6 nos Delivery: 90 days
#10

Driving force racing wheel _Force Feedback and Game Wheel_Logitech G29 Driving force racing wheel with Shifter module

As Per Specifications

8 nos Delivery: 90 days
#11

Converters__DP to HDMI Converter_Supports video resolutions up to 3840x2160 _4k support_ and uncompressed digital

As Per Specifications

10 nos Delivery: 90 days
#12

Converters HDMI to VGA converter_PC HDMI and DP Converter with I by P VGA to O by P SVGA_ VGA_ TV and Video converter_

As Per Specifications

10 nos Delivery: 90 days
#13

Display_Graphics Accelerator Card___High End Graphics card with 4GB GDDR5X RAM with Min 2 HDMI

As Per Specifications

8 nos Delivery: 90 days
#14

Video projector__LCD Projector WUXGA type_1920x1200__ 5500 Ansi Lumens_

As Per Specifications

4 nos Delivery: 90 days
#15

LCD monitor screen size 7inch diagonal_LCD monitor screen size 7inch diagonal_ physical resolution 800 x 48

As Per Specifications

4 nos Delivery: 90 days
#16

Operating System__Microsoft Windows_10 _Windows 10 Professional OEM Pack

As Per Specifications

6 nos Delivery: 90 days
#17

Application Software__MS Office__MS Office 2019_ Consists MS Access_

As Per Specifications

6 nos Delivery: 90 days
#18

Programmable Logic Controller__PLC for ALS _Programmable Logic Controller__Interface PCB by SDD approved

As Per Specifications

6 nos Delivery: 90 days
#19

Gear sensor__Gear sensor PCB__Specification _ Inputs_ Active lo_ 8 Nos_ Outputs _ 8 Nos_ Through 15 Pin D Connectors

As Per Specifications

6 nos Delivery: 90 days
#20

Power cable__2 core power cable__Type YY_1 Sq mm dia strength 8_1 kg

As Per Specifications

40 mtr Delivery: 90 days
#21

3 core power cable__H07_RNF_1_5 sqmm dia ISI Standard

As Per Specifications

360 mtr Delivery: 90 days
#22

3 core power cable__H07_RNF_2_5 sq mm dia ISI Standard

As Per Specifications

80 mtr Delivery: 90 days
#23

Signal cable__10 core cable unshielded__Type YY 6_3mm dia strength 8_1 kg_

As Per Specifications

40 mtr Delivery: 90 days
#24

15_core cable _Gear Sensor PCB to Interface PCB_ with 15_pin male and female D_sub end connectors _1m length_

As Per Specifications

40 mtr Delivery: 90 days
#25

25 core cable unshielded__Screened 6_3mm dia

As Per Specifications

20 mtr Delivery: 90 days
#26

Connector__2 Pin Connector__2 Pin Wego connector Plug Male and Female sockets pair_ 0_138inch _3_5 mm pitch_ 180degree

As Per Specifications

32 nos Delivery: 90 days
#27

3 Pin Connector__3 Pin Wego connector Plug Male and Female sockets pair_ 0_138inch _3_5 mm pitch_ 180 degree_ 10 Amps

As Per Specifications

32 nos Delivery: 90 days
#28

Connector__4 Pin Connector__4 Pin Wego connector Plug Male and Female sockets pair_ 0_138inch _3_5 mm pitch_ 180degree

As Per Specifications

24 nos Delivery: 90 days
#29

10 Pin Connector_10 Pin Wego connector Plug Male and Female sockets pair_ 0_138inch _5 mm pitch_ 180 degree_ 16 Amps

As Per Specifications

16 nos Delivery: 90 days
#30

16 Pin Connector_16 Pin Wego connector Plug Male and Female sockets pair_ 0_138inch _5 mm pitch_ 180 degree_ 16 Amps

As Per Specifications

8 nos Delivery: 90 days
#31

15 Pin automobile connector_Panel receptable 15 way_

As Per Specifications

8 nos Delivery: 90 days
#32

9 pin D_shell female connector complete with dust cover and strain relief_ITT D_sheel connector_ ISI Standard_

As Per Specifications

12 nos Delivery: 90 days
#33

9 pin D sub male connector complete with dust cover and strain relief _ITT D_sheel connector_ ISI Standard_

As Per Specifications

12 nos Delivery: 90 days
#34

15 pin D_shell female connector complete with dust cover and strain relief_ITT D_sheel connector_ ISI Standard_

As Per Specifications

12 nos Delivery: 90 days
#35

15 pin D_shell female connector complete with dust cover and strain relief_ITT D_sheel connector_ ISI Standard_

As Per Specifications

12 nos Delivery: 90 days
#36

25_pin D_shell connector female complete with dust cover and strain relief__ITT D_sheel connector_ ISI Standard_

As Per Specifications

16 nos Delivery: 90 days
#37

Connector__25_pin D shell connector male complete with dust cover and strain relief__ITT D_sheel connector_ ISI Standard

As Per Specifications

16 nos Delivery: 90 days
#38

Audio cable_Audio cable _10 m length__Flexible audio cable Nominal O by D_1503A_3_68mm_ Nominal capacitance between

As Per Specifications

20 nos Delivery: 90 days
#39

AC plug Top 6 Amps_3_pin plug Top 6 Amps_ISI Standard_

As Per Specifications

20 nos Delivery: 90 days
#40

AC plug Top 15Amps_3_pin plug Top 15 Amps_ISI Standard_

As Per Specifications

8 nos Delivery: 90 days
#41

Binding Wire__Size_2061_02_ 1 by 26 _ 92 Mtrs Roll_

As Per Specifications

4 roll Delivery: 90 days
#42

Power cord_Computer power cord 230 V AC_ 6 A_ 3 mtr length_ _H07_RNF_1_5 sq mm dia_ ISI Standard_

As Per Specifications

20 nos Delivery: 90 days
#43

Connector__Combination switch ALS automobile end_connectors__Automobile end connector for ALS combination switch

As Per Specifications

8 nos Delivery: 90 days
#44

_Ignition switch ALS automobile end connectors__Auto connector for ALS Ignition switch both male and female _pair_

As Per Specifications

8 nos Delivery: 90 days
#45

LAN cable_LAN cable Cat 5E with RJ_45 end connectors _15 m length_ _Duplex cable _ Cat 5e UTP_Cat 5e UTP_

As Per Specifications

8 nos Delivery: 90 days
#46

_LAN cable Cat 5E with RJ_45 end connectors _2 m length_ _Duplex cable _ Cat 5e UTP_Cat 5e UTP__ Nominal OD

As Per Specifications

8 nos Delivery: 90 days
#47

Switch _Microswitch _Push button type 3 Way 10 mm dia_

As Per Specifications

12 nos Delivery: 90 days
#48

LT wire_Premium quality LT wire for Dashboard wiring__2mm dia LT wire of Red_Black_ Blue_ Green and Yellow_

As Per Specifications

400 mtr Delivery: 90 days
#49

Proximity Switch _Proximity Switch P_Type_Inductive P type_ 3Core wire length 2_5 mtrs_ 18 mm dia_ 6_36 Volt

As Per Specifications

40 nos Delivery: 90 days
#50

Spike buster _Spike buster socket board 6 sockets_ 15 A_ _6 sockets_ 15 A _ 15 by 5A multipin socket_ Card length 5 Mtrs

As Per Specifications

12 nos Delivery: 90 days
#51

_Spike buster socket board 6 sockets_ 6 A _6 sockets_ 6 A _ Card length 5 Mtrs_ Socket material Bross_ Heavy duty_

As Per Specifications

6 nos Delivery: 90 days
#52

USB Extender Cable_USB Extender Cable _10 Mts_ _USB Extender Cable USB_2_0_ Male to female Supports 480 Mbps_

As Per Specifications

8 nos Delivery: 90 days
#53

VGA cable__VGA cable with 15_pin male to female end connectors _20 m length_ _High performs RGB_ DB15_ DE15 HD_15

As Per Specifications

8 nos Delivery: 90 days
#54

HDMI Cable__ HDMI Cable _2m length_ _Supporting Resolution_ 800x600_1024x768_ 1080p Full HD_ 1092x1200_WXGA_

As Per Specifications

8 nos Delivery: 90 days
#55

HDMI Cable _20m length_ _Supporting Resolution_ 800x600_1024x768_ 1080p Full HD_ 1092x1200_WXGA_

As Per Specifications

8 nos Delivery: 90 days
#56

Cable ties__Cable ties and tie bases _50mm packet of 100_ as per drawing_Standard cabel Ties_ white nylon with

As Per Specifications

8 pkt Delivery: 90 days
#57

Cable ties and tie bases _100mm packet of 100_ as per drawing_Standard cabel Ties_ white nylon with a non_release

As Per Specifications

8 pkt Delivery: 90 days
#58

Cable zip_Cable zip tie Mounts__Cable zip tie Mounts_ Self Adhesive Tie Mount for wire alignment_ Size 1inch x 1inch Color_ Black

As Per Specifications

8 pkt Delivery: 90 days
#59

Spiral Pipe_Spiral Pipe 1_5inch Dia _ Flexible Conduct__Mtrls _ Nylon PA6_ thread_ PG36_ Temp_ _40 deg to 120 deg_

As Per Specifications

40 mtr Delivery: 90 days
#60

Spiral Pipe 1inch Dia _ Flexible Conduct__Mtrls _ Nylon PA6_ thread_ PG36_ Temp_ _40 deg to 120 deg_

As Per Specifications

20 mtr Delivery: 90 days
#61

PVC Channal_PVC Channal_PVC _ Flexible Conduct_ 1_x 3_ 1_5 Mtr length

As Per Specifications

20 nos Delivery: 90 days
#62

Instrument panel_ALS Mk_IV Original Instrument panel Complete teflon wiring_modified_ALS Mk_IV

As Per Specifications

4 nos Delivery: 90 days
#63

Instrument panel Bulbs_Instrument panel Bulbs Operating voltage 2_Amps_12v_Dc_

As Per Specifications

80 nos Delivery: 90 days
#64

Switch_Toggle Switches _Toggle Switch 3 way 230 volt Ac

As Per Specifications

8 nos Delivery: 90 days
#65

Sleeves_Sleeves assorted_1_0mm_1_5mm_2mm_4mm_ 5mm_ 8mm_10mm_15mm_ 20mm_

As Per Specifications

30 mtr Delivery: 90 days
#66

Heat Sink Sleeve_1mm_ 1_5mm_ 2mm_ 4 mm and 8 mm each _02 Mtrs

As Per Specifications

20 mtr Delivery: 90 days
#67

Connector__Ecom Connector for UPS Connection 6 Amps_Ecom Connector 5 amps Male and female pair_

As Per Specifications

20 set Delivery: 90 days
#68

Ecom Connector for UPS Connection 15 Amps_Ecom Connector 15 amps Male and female Pair_

As Per Specifications

12 set Delivery: 90 days
#69

Universal Adaptor_Universal Adaptor for 3 pin plug__ 6 Apms_ Socket Material Bross__ ISI Standard_

As Per Specifications

24 nos Delivery: 90 days
#70

Mounting bracket_Mounting bracket for Speaker__As per 515 ABW drawing No A4 515 ALS 57817_

As Per Specifications

4 nos Delivery: 90 days
#71

Mounting Plate for PLC_ _As per 515 ABW drawing No A3 515 ALS 57822_

As Per Specifications

4 nos Delivery: 90 days
#72

Mounting bracket for Spike Buster__As per 515 ABW drawing No A4 515 ALS 57823

As Per Specifications

20 nos Delivery: 90 days
#73

Mounting Bracket Main Gear Box ALS__As per 515 ABW drawing No A3 515 ALS 40805_

As Per Specifications

20 nos Delivery: 90 days
#74

Holding bracket for 7inch LCD monitor_As per 515 ABW drawing No A3 515 ALS 57826_

As Per Specifications

4 nos Delivery: 90 days
#75

Mounting Bracket for SMPS _As per 515 ABW drawing No A4 515 ALS 57817_

As Per Specifications

8 nos Delivery: 90 days
#76

Steering Logitech G_29 Mounting assembly_Steering Logitech Mounting assy_ As per 515 ABW drawing No A2 515

As Per Specifications

4 nos Delivery: 90 days
#77

Coupling _Aluminium Flanze__Coupling stearing wheel with Logitech G_29 15 cm dia 6 cm length solid Aluminium

As Per Specifications

4 nos Delivery: 90 days
#78

Gear box _Modified Main gear Box of ALS 6_1 Gear__6_1 Gear with shifting mechanism_ shifting lever and lever knob_

As Per Specifications

4 nos Delivery: 90 days
#79

Projector Stand_Mounting stand video projector _Projector mounting stand Rotating height adjustable extension_ locking

As Per Specifications

4 nos Delivery: 90 days
#80

Projection screen__Back Projection screen_ _Projection screen Projection from backside of the screen

As Per Specifications

4 nos Delivery: 90 days
#81

Screen Frame_Parabolic projection adjustable Frame_Parabolic projection adjustable stand with 11_5feetx15feetx4feet

As Per Specifications

4 nos Delivery: 90 days
#82

Mounting Rope_Projector screen mounting rope_Projector screen mounting rope Nylon rope 8mm dia_ as per ISO standard_

As Per Specifications

400 mtr Delivery: 90 days
#83

Instructor station__Instructor station ALS 1_2_MS with black powder coating_ 4xInstrument cooling fans_

As Per Specifications

2 set Delivery: 90 days
#84

Chair_Instructor chair__ISI Standard_

As Per Specifications

2 nos Delivery: 90 days
#85

Universal joint _Universal joint ALS MK_IV assy with coupling male and female for steering assy_ As per 515 ABW drawing No A3 515 ALS 57824_

As Per Specifications

4 nos Delivery: 90 days
#86

Fasteners_Set of Assorted fasteners ALS_Cheese head slotted screw size M6 by 40 long with nut and double washer

As Per Specifications

4 set Delivery: 90 days
#87

MFG Lable_Manufacturer_s lable plate_515 Army Base Wksp manufacturer plate_ As per 515 ABW drawing No A3 515

As Per Specifications

6 nos Delivery: 90 days
#88

U Bolt_U Bolt with coupling bracket_U Bolt for Coupling ALS MK_IV Cabin intermedite frame with 6 DOF Hydrolic Upper

As Per Specifications

24 nos Delivery: 90 days
#89

Anchor Bolt_Anchor Bolt_Size_ 20 mm dia x 12inch As per 515 ABW drawing_

As Per Specifications

24 nos Delivery: 90 days
#90

Frame__Intermediate frame__Intermediate frame_ Couple the ALS MK_IV driver cabin to 6 DOF Hydrolic Motion plotform

As Per Specifications

4 nos Delivery: 90 days
#91

DVR Cabin_Original DVR Cabin Ashok Leyland Stallion Mk_IV_ __Ashok Leyland Stallion Mk_IV cabin Original

As Per Specifications

4 nos Delivery: 90 days
#92

Hydraulic Platform _6 Degree of Freedom Hydraulic Motion Platform With Hydraulic power panel and Hydraulic PLC Panel _1_

As Per Specifications

4 set Delivery: 90 days
#93

Hydraulic Fluid_Hydraulic oil_Hydraulic Fluid Grade SHO 68

As Per Specifications

1,200 ltr Delivery: 90 days
#94

Power cable_3 Phase 4 core Power cable_3phase with earthing_ Red_ Yellow_ Green and Black 70 sq mm_ 170 Amps

As Per Specifications

40 mtrs Delivery: 90 days
#95

Allen key_Allen key_Set of 8__Allen key_2_3_4_5_6_7_8_9_ Set of 8_ ISI Standard

As Per Specifications

2 set Delivery: 90 days
#96

Screw driver set _Screw driver set of Five_ISI Brand

As Per Specifications

2 nos Delivery: 90 days
#97

Cutting plier__Cutting plier_ 6inch ISI Standard_

As Per Specifications

2 nos Delivery: 90 days
#98

Spanner open_jaw_Spanner open_jaw _Set of 8__Spanner open_jaw 10 by 11 to 20 by 21_ ISI Standard_ _ 6 to 22 Set _

As Per Specifications

2 set Delivery: 90 days
#99

Spanner_Adjustable spanner 24inch_ISI Standard_

As Per Specifications

4 nos Delivery: 90 days
#100

Bubble sheet__2 mtr width_

As Per Specifications

80 mtrs Delivery: 90 days
#101

Corrugated sheet__2 Mtr width_

As Per Specifications

80 mtrs Delivery: 90 days
#102

Cotton waste__Cotton waste_

As Per Specifications

80 kgs Delivery: 90 days
#103

Grease__Commercial grade_

As Per Specifications

2 kgs Delivery: 90 days
#104

_Hessian cloth__2mtr width_

As Per Specifications

80 mtrs Delivery: 90 days
#105

Insulation tape__Wonder tape 10 mtr roll PVC_

As Per Specifications

20 roll Delivery: 90 days
#106

Packing tape__Adhesive packing tape 50mm width_ 10 mtrs std roll

As Per Specifications

40 roll Delivery: 90 days
#107

Paint_Paint black and Oliver green spray Container _500 gms__Quick Drying Lacquer Spray 100percentage Acrylic Automobiles Finishes

As Per Specifications

8 tin Delivery: 90 days
#108

LDPE Plastic rolls_LDPE plastic rolls Pattern _ plain_LDPE plastic rolls Pattern _ plain_ Transparency _ 50percentage_ Packing type

As Per Specifications

16 roll Delivery: 90 days
#109

Silica Gel__Transparent Silica Gel__Transparent Silica Gel_ Bag Particle Size _200_425 Mesh_ Industrial Use_ ISI Standard_

As Per Specifications

8 bag Delivery: 90 days
#110

Wood packing Boxes_Chir wood packing Boxes by crates _ Wooden Boxes required for packing one set of

As Per Specifications

4 set Delivery: 90 days
#111

Rubber Mat_Rubber Mat for 6 DOF Hydrolic Base Frame_ _6_ x 6_ _ 15mm thickness_ ISI Standard_

As Per Specifications

24 mtrs Delivery: 90 days
#112

Documents_Technical manual_As per 515 Soft copy_ Approx 250 Pages_

As Per Specifications

2 nos Delivery: 90 days
#113

User hand book_As per 515 Soft copy_ Approx 250 Pages_

As Per Specifications

2 nos Delivery: 90 days
#114

Log Book_As per 515 Soft copy_ Approx 50 Pages_

As Per Specifications

2 nos Delivery: 90 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

02-Dec-2025, 10:00 am

End

17-Dec-2025, 3:00 pm

Duration: 365 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-02-08-2025 09:57:29
2
**********   Under PMA
-01-08-2025 16:26:23
3
**********   Under PMA
-01-08-2025 17:48:36
4
**********   Under PMA
-01-08-2025 18:01:12
5
**********   Under PMA
-02-08-2025 12:55:02
6
**********   Under PMA
-01-08-2025 16:46:55
7
**********   Under PMA
-02-08-2025 12:03:49