Indian Army Department of Military Affairs Online UPS 10 KVA with Battery IS 16242 Part 1 Tender 2025
Indian Army
JAMMU, JAMMU & KASHMIR
Bid Publish Date
04-Jul-2026, 3:54 pm
Bid End Date
14-Jul-2026, 4:00 pm
Location
Progress
Quantity
1
Bid Type
Single Packet Bid
The Jammu and Kashmir State Pollution Control Board (jkspcb), under the Forest Department Jammu & Kashmir, seeks an Online UPS (10 KVA) with Battery conforming to IS 16242 (Part 1) for delivery to the Pollution Control Committee, Sheikh Ul Alam Campus, Rajbagh, Srinagar. The procurement includes a scalable quantity option of up to 25% increase during contract, at contracted rates, with delivery timelines linked to the last delivery order. The project requires a robust service footprint in Jammu & Kashmir, including installation, commissioning, and on-site support. The bid emphasizes ISO/IS standards compliance and a strong aftersales framework. The estimated value is not disclosed, but the scope focuses on durable UPS units with built-in isolation transformer, adequate overload capacity, and compliant battery backup provisions.
Online UPS, 10 KVA rating
IS 16242 (Part 1) compliant
Built-in isolation transformer
Minimum overload capacity specification
Battery type per IS 16242 requirements
Backup time specification aligning with critical loads
Mounting type as specified (floor/console/rack compatible)
Minimum 3-year warranty with OEM support
Delivery quantity may vary by ±25% at contract; extended delivery period applies
Delivery address: SRINAGAR, Rajbagh; install/comissioning as scope
Service centers must be in JK or established within 30 days of award
Dedicated toll-free service line and escalation matrix required
OEM warranty certificates must be submitted at delivery
EMD and financial standing documentation required
Not specified in data; bidders should expect standard govt terms with possible advance/after-delivery payment per contract
Delivery commencement from the last date of original delivery order; option-driven delivery extension formulas apply
Not detailed; terms imply adherence to delivery and performance milestones with potential LD as per purchasing terms
Non-liquidation, non-bankruptcy status with undertaking
Functional service center in Jammu & Kashmir or commitment to establish within 30 days
OEM/authorized distributor with capability to supply 10 KVA online UPS and provide 3-year warranty
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
JAMMU, JAMMU & KASHMIR
Government Medical College And Associated Hospitals
ANANTHNAG, JAMMU & KASHMIR
Integral Coach Factory
CHENNAI, TAMIL NADU
N/a
DEHRADUN, UTTARAKHAND
Indian Overseas Bank
KAMRUP, ASSAM
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Performance Parameters | Rating (in KVA) | 5 |
| Performance Parameters | Input Voltage (AC, 50 Hz) | Single Phase, 160V - 260V |
| Performance Parameters | Output Voltage (AC, 50 Hz) | Single Phase, 230V±1%, |
| Construction | Availability of Inbuilt Isolation Transformer | Yes |
| Construction | Minimum Overload Capacity of Online UPS | 120% of Rating in KVA for 10 minutes, 150% of Rating in KVA for 60 seconds |
| Battery/Backup Bank | Type of Battery | SMF-VRLA (Sealed Maintenance Free-Valve Regulated Lead Acid) / Stationary Lead Acid Batteries |
| Battery/Backup Bank | Backup Time | 60.0 |
| Features | Type of Mounting of Online UPS | Floor Standing |
| Warranty And Reports | Minimum Standard Warranty | 1.0 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates of similar UPS deployments
Financial statements or solvency proof
EMD/Security deposit proof
Technical bid documents
OEM authorizations / manufacturer credentials
Proof of functional service center in JK or plan to establish within 30 days
OEM warranty certificates and post-sales support details
Key insights about JAMMU AND KASHMIR tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD, technical bids, and OEM authorizations; ensure IS 16242 Part 1 compliance, 3-year OEM warranty, and provide proof of JK service centers or plan to establish within 30 days of award.
Required documents include GST certificate, PAN, experience certificates for UPS deployments, financial statements, EMD proof, OEM authorization, technical bid, and proof of a JK service center or establishment plan within 30 days post-award.
Units must be IS 16242 (Part 1) compliant, with a built-in isolation transformer, 50 Hz input/output, and minimum overload capacity suitable for critical loads; backup time aligned with essential services requirements.
Delivery and commissioning are to be performed at POLLUTION CONTROL COMMITTEE, SHEIKH UL ALAM CAMPUS, RAJBAGH, SRINAGAR, KASHMIR, with installation as applicable in scope.
The contract requires a minimum 3-year warranty from final acceptance or post-installation testing, with OEM warranty certificates submitted at delivery and a reliable after-sales support network in India.
Yes. The purchaser reserves the right to increase or decrease the quantity by up to 25% of the bid quantity at contract placement and during the contract currency at contracted rates.
Bidders must have a functional service center in JK or commit to establishing one within 30 days of award; a dedicated toll-free service line and escalation matrix must be provided for timely support.
Delivery timings follow the option clause: extended time is calculated as (additional quantity / original quantity) × original delivery period, with a minimum of 30 days.
Indian Bank
📍 KOLKATA, WEST BENGAL
N/a
📍 ALAPPUZHA, KERALA
Indian Air Force
Kamdhenu University
📍 BANASKANTHA, GUJARAT
Directorate Of Employment & Training
📍 AMRELI, GUJARAT
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS