Oil India Limited invites bids for the Transformer Winding Resistance Meter supply. Scope involves procurement of a specialized electrical testing instrument, with quantity flexibility up to 25% of bid quantity and the option to extend delivery for additional quantity at contracted rates. Delivery timelines commence from the last date of the original delivery order, with a minimum extension of 30 days. The procurement is conducted via GeM, with 21 days payment after CRAC and online bill submission as per ATC. Emphasis on bidder compliance with the option clause and timely delivery across awarded quantities.
Product/service: Transformer winding resistance meter
Quantity: Not disclosed in available data
Estimated value: Not disclosed
Experience: Not specified in tender data
Quality/Compliance: ATC terms with standard GeM proformas
Delivery: 25% quantity option; minimum 30 days extension
Delivery quantity may be increased by up to 25% during contract at contracted rates
Payments due within 21 days of CRAC and online bill submission
MSE preference rules apply with 15% price band and full order award to eligible MSE L1
Payments to seller within 21 days of CRAC issuance and online bill submission; supersedes earlier 10-day period
Delivery period begins from the last date of the original delivery order; option clause may extend delivery with calculated extra time
Not specified in provided terms; refer to ATC/GeM tender terms for LDs
Must comply with GeM terms and ATC clauses
Possess capability to supply electrical testing meters to a national buyer
GST registration and financial stability as per policy
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply of Transformer winding resistance meter
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates (if any)
Financial statements (as applicable)
EMD/security deposit details (if mandated by GeM terms)
Technical bid documents and GeM proformas
OEM authorizations (if applicable)
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SCOPE T&M PRIVATE LIMITED(MSE)( MSE Social Category:General ) Under PMA | Item Categories : Supply of Transformer winding resistance meter | |
| L2 | THE MOTWANE MANUFACTURING COMPANY PRIVATE LIMITED( MSE Social Category:General ) Under PMA | Item Categories : Supply of Transformer winding resistance meter | |
| L3 | GREENWATT GLOBAL VENTURES PRIVATE LIMITED Under PMA | Item Categories : Supply of Transformer winding resistance meter | |
| L4 | M/S REAL TIME SYSTEMS( MSE Social Category:General ) Under PMA | Item Categories : Supply of Transformer winding resistance meter | |
| L5 | DIGITECH Under PMA | Item Categories : Supply of Transformer winding resistance meter | |
| L6 | APPLIED TECHNO PRODUCTS PRIVATE LIMITED( MSE Social Category:General ) Under PMA | Item Categories : Supply of Transformer winding resistance meter |
Key insights about ASSAM tender market
Bidders should prepare GeM-proforma submissions, verify GST applicability, and ensure capability to supply transformer winding resistance meters. The tender allows up to 25% quantity variation and requires 21-day payment after CRAC. Submit queries within 5 days via the designated email and comply with any OEM authorizations if applicable.
Required documents include GST registration, PAN, experience certificates, financial statements, and GeM-proforma bids. OEM authorizations may be needed for specific meters. Ensure all documents align with GeM ATC terms and submit before the 5-day query window closes.
Delivery commences from the last date of the original delivery order. The purchaser may increase quantity by up to 25% at contracted rates and extend delivery time accordingly, with a minimum extension of 30 days. Extended time formula: (Additional/Original) × Original days, subject to limits.
Specific standards are not stated in the available data. Bidders should review the ATC and GeM proformas for any standard requirements and ensure supplier capabilities for electrical testing equipment compliance as applicable to transformer meters.
Queries must be submitted within 5 days of tender publication. Send in writing to the designated email with subject line clearly indicating the tender and GEM bid number for proper tracking.
Payments are due within 21 days of issue of CRAC and online bill submission. This supersedes earlier timelines and aligns with GeM ATC terms; ensure CRAC is issued and bills are submitted electronically to receive timely payment.