TenderDekho Logo
Closed GEM

National Fertilizers Limited Valve & Actuator Components Tender Rohtak Haryana 2026

Bid Publish Date

08-Aug-2026, 3:28 pm

Bid End Date

29-Aug-2026, 3:00 pm

Progress

Issue08-Aug-2026, 3:28 pm
AwardPending

Tender Overview

National Fertilizers Limited (NFL) invites bids for the supply of valve and actuator components, including plug valve bodies, actuator bodies, actuator repair kits, top seal kits, and sleeves, for delivery to NFL Stores, Panipat, Haryana. The scope is strictly the supply of goods with no installation scope. The procurement emphasizes interchangeability with existing installed items and a warranty against manufacturing defects for 18 months from supply or 12 months from installation. The award will hinge on adherence to delivery timelines, warranty commitments, and GST-compliant invoicing for large turnover suppliers. A 30-day payment term post-acceptance is mandated, with bidders providing latest bank details on invoice.

Technical Specifications & Requirements

  • Product names: plug valve body, actuator body, actuator repair kit, top seal kit, sleeve (all variants marked as 1 in category).
  • Delivery location: NFL Stores, Panipat, Haryana; indicative delivery period; bidder to quote minimum delivery period.
  • Warranty: 18 months from supply or 12 months from installation; interchangeability certification with existing installed item.
  • Documentation: warranty certificate, interchangeability certificate, acceptance of uploaded ATC documents, signed on letterhead; E-invoice compliance if turnover > ₹5 crore.
  • Payment: 100% payment within 30 days after receipt and acceptance; supply of latest bank mandate at time of invoice.
  • MSME schemes: awareness of ZED/LEAN certifications; no mandatory requirement but guidance provided.
  • BoQ: 10 items stated; specific quantities not disclosed; scope remains strictly goods supply, not services.
  • Deviation: any deviation must be provided on a separate sheet; delivery terms are indicative but bidder may quote shorter timelines.
  • Compliance: ensure GST as applicable; honor CGST Rule 48 for e-invoicing.

Terms, Conditions & Eligibility

  • EMD details not disclosed; bidders must meet payment terms: 100% within 30 days after receipt.
  • Warranty/guarantee for manufacturing defects: 18 months from supply or 12 months from installation.
  • Interchangeability certificate with existing installed item required.
  • E-invoicing obligation if turnover exceeds ₹5 Crore in any financial year since 2017-18.
  • Delivery period: candidate must quote minimum delivery period; if not quoted, bid document period applies.
  • Documentation: acceptance of uploaded ATC document on letterhead; OEM authorizations and technical compliance documents would be evaluated.
  • Price variations: deviations to be specified in a separate sheet; payment terms and GST compliance non-negotiable.

Key Specifications

    • Product names: plug valve body, actuator body, actuator repair kit, top seal kit, sleeve (category variants marked as -1)
    • Delivery location: NFL Stores, Panipat, Haryana; delivery timeline to be quoted by bidder
    • Warranty: 18 months from supply or 12 months from installation; interchangeability with existing installed items
    • Certification: Interchangeability certificate required; Warranty certificate against manufacturing defects
    • Invoicing: GST compliance; E-invoice under Rule 48 if turnover exceeds ₹5 crore
    • Payment: 100% within 30 days after receipt and acceptance; provide latest bank details on invoice
    • Quantity/BOQ: 10 items listed; exact quantities not disclosed in data
    • Delivery terms: quoted minimum delivery period; otherwise default bid document period
    • Compliance: standard terms specify supply-only scope (no installation)

Terms & Conditions

  • Payment terms: 100% within 30 days after receipt and acceptance

  • Warranty: 18 months from supply or 12 months from installation

  • Interchangeability certificate and acceptance of ATC documents required

  • GST/compliance: E-invoicing required if turnover > ₹5 crore

  • Delivery period: bidders to quote minimum delivery; indicative period may apply

  • Evidence of vendor credentials: GST, PAN, experience, financials, OEM authorization

  • Bid deviations: disclose separately; delivery terms are binding

Important Clauses

Payment Terms

100% payment within 30 days after receipt/acceptance; provide latest bank mandate with invoice

Delivery Schedule

Bidder to quote minimum delivery period; if not quoted, bid document period applies

Penalties/Liquidated Damages

Not explicitly stated in provided data; typical NFL practice applies

Bidder Eligibility

  • Turnover and GST compliance per CGST requirements

  • Experience in supplying valve/actuator components to government or large public sector entities

  • Ability to provide interchangeability certificates and warranty for manufacturing defects

Authority & Contact

Tender Data

Bid Details

Quantity

16

Category

Plug valve body

Bid Type

Single Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Plug valve body , Actuator body , Actuator repair kit , Top seal kit , Sleeve , Plug valve body-1 , Actuator body-1 , Actuator repair kit-1 , Top seal kit-1 , SLEEVE -1

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Panipat

Delivery Pincodes

132106

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sudhanshu Ranjan Srivastava132106,National Fertilizers Limited (A Government of India Undertaking) Gohana Road, Panipat Haryana - 132106PanipatHaryana1321061120-

Authority Records

MINISTRY OF CHEMICALS AND FERTILIZERSFERTILIZERS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 11

GeM-Bidding-9628476.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 10 Items Sign in for GEM prices

#1

Plug valve body

Plug valve body for ON OFF 3-way PTFE sleeved as per sr no 1 of attached specification

1 nos Delivery: 120 days
#2

Actuator body

Actuator body for ON OFF 3-way PTFE sleeved plug Valve as per sr no 2 of attached specification

1 nos Delivery: 120 days
#3

Actuator repair kit

Actuator repair kit for ON OFF 3-way PTFE sleeved plug Valve as per sr no 3 of attached specification

2 nos Delivery: 120 days
#4

Top seal kit

Top seal kit for ON OFF 3-way PTFE sleeved plug Valve as per sr no 4 of attached specification

2 set Delivery: 120 days
#5

Sleeve

Sleeve for ON OFF 3-way PTFE sleeved plug Valve as per sr no 5 of attached specification

2 nos Delivery: 120 days
#6

Plug valve body-1

Plug valve body for ON OFF 2-way PTFE sleeved plug Valve as per sr no 6 of attached specification

1 nos Delivery: 120 days
#7

Actuator body-1

Actuator body for ON OFF 2-way PTFE sleeved plug Valve as per sr no 7 of attached specification

1 nos Delivery: 120 days
#8

Actuator repair kit-1

Actuator repair kit for ON OFF 2-way PTFE sleeved plug Valve as per sr no 8 of attached specification

2 set Delivery: 120 days
#9

Top seal kit-1

Top seal kit for ON OFF 2-way PTFE sleeved plug Valve as per sr no 9 of attached specification

2 set Delivery: 120 days
#10

SLEEVE -1

SLEEVE for ON OFF 2-way PTFE sleeved plug Valve as per sr no 10 of attached specification

2 nos Delivery: 120 days

Categories 20

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates (relevant supply of valve/actuator components)

4

Financial statements (last 3 years) or turnover details

5

EMD/Security deposit documentation (as applicable by NFL)

6

Technical bid documents and product specifications

7

OEM authorization/callbacks (if applicable)

8

Warranty/guarantee certificates

9

Interchangeability certificate with existing installed items

10

Bank mandate / cancelled cheque copy on vendor letterhead

Frequently Asked Questions

Key insights about HARYANA tender market

What documents are required for NFL Rohtak valve tender bidding?

Bidders must submit GST certificate, PAN, experience certificates for similar supplies, financial statements, EMD documentation, technical bid documents, OEM authorizations (if applicable), warranty certificates, interchangeability certificates, and bank mandate details with the invoice submission.

How is payment processed for NFL Rohtak valve component supply?

100% payment is released within 30 days after receipt and acceptance of materials at NFL Stores, Panipat; bidders must provide bank mandate/cancelled cheque on letterhead at invoice time to avoid payment delays.

What warranty is required for valve components in NFL tender?

Warranty must cover manufacturing defects for 18 months from supply or 12 months from installation, whichever is earlier; a warranty certificate must accompany the supply to ensure claim validity.

What is the interchangeability certificate requirement for NFL Rohtak tender?

Bidders must submit an Interchangeability certificate demonstrating compatibility with existing installed items, ensuring seamless replacement without modification to downstream systems.

Is e-invoicing mandatory for NFL Rohtak procurement?

Yes, e-invoicing is required if the bidder's turnover exceeds ₹5 crore in any financial year since 2017-18; non-compliant invoices may not be eligible for input tax credit.

What delivery terms should bidders quote for NFL valve components?

Bidders must quote a minimum delivery period; if not quoted, the period specified in the bid document applies; delivery is to NFL Stores, Panipat, Haryana.

Are MSME ZED/LEAN certifications mandatory for this NFL tender?

MSME ZED/LEAN certifications are encouraged to boost competitiveness but are not strictly mandatory; bidders should ensure sustainability and lean practices as part of quality considerations.