Submersible Pump Starters (Motor starter controls)
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
JYOTIBA PHULE NAGAR, UTTAR PRADESH
Bid Publish Date
05-Nov-2025, 10:14 am
Bid End Date
05-Dec-2025, 12:00 pm
Location
Progress
Quantity
3
Bid Type
Two Packet Bid
Rashtriya Ispat Nigam Limited (RINL), Visakhapatnam, Andhra Pradesh, invites bids for a Start Motor Soft Starter 600V 370A for the CH-3 pump. The contract scope covers Supply, Installation, Testing and Commissioning of the soft starter. The tender requires bidders to specify the exact Make/Model and upload technical catalogues; bid submissions must align with GCC and ATC terms. An important quantity option allows up to 25% increase over the bid quantity during contract execution. The delivery timeline starts from the last date of the original delivery order, with a minimum handling window of 30 days for additional time.
Bidder communications should use the designated email for inquiries: [email protected]. The tender forbids participation from bidders under hold in material sub-group 20011 or centrally blocked with Vizag Steel Plant. The document sets forth that deviations from the offered terms during evaluation will not be entertained and that inspection/acceptance will follow the agreed parameters.
Option quantity up to 25%, extended delivery time rules
Delivery period starts from last DO date; 30-day minimum for extensions
GCC and Detailed Terms govern tender; no scope deviations accepted
Not specified in data; bidders should align with GCC terms in the invitation to supply
Delivery period commences from last date of original delivery order; extended time calculated by formula with minimum 30 days
Not described explicitly; penalties would be as per GCC details on Vizag Steel Plant portal
Not under hold in material sub-group 20011 or centrally blocked with Vizag Steel Plant
Must specify Make/Model and provide technical catalogues
Compliance with GCC and Detailed Terms; no deviations without acceptance
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
JYOTIBA PHULE NAGAR, UTTAR PRADESH
N/a
BALRAMPUR, UTTAR PRADESH
South Eastern Railway
HOWRAH, WEST BENGAL
East Coast Railway
DANTEWADA, CHHATTISGARH
East Coast Railway
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar soft-starter procurements
Financial statements (last 2-3 years)
EMD submission document (amount not specified in data; provide as per tender guidance)
Technical bid documents and bid catalogue
OEM authorization or Make/Model confirmation
Any safety or quality certifications cited in GCC/ATC
Extended Deadline
05-Dec-2025, 12:00 pm
Opening Date
05-Dec-2025, 12:30 pm
Key insights about ANDHRA PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD documentation, technical bid with Make/Model and catalogues, and OEM authorizations. Ensure compliance with GCC and ATC; upload the catalog and confirm the exact 600V/370A rating for CH-3 pump.
Required documents include GST certificate, PAN card, latest financial statements, experience certificates for similar procurements, EMD submission proof, technical bid, OEM authorization, and product catalogues confirming Make/Model and 600V/370A specification.
Delivery starts from the last date of the original delivery order; quantity can increase by up to 25%, with the extended delivery time calculated by (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Inspection and acceptance are per the bidder’s offer and agreed evaluation parameters; GCC terms apply. Ensure catalog data aligns with offered performance and the 600V/370A rating for the CH-3 pump.
Bidders must specify the exact Make/Model and upload the technical catalogue/brochures; supply of other than offered make/model will be rejected during evaluation.
Scope includes Supply, Installation, Testing and Commissioning of the soft starter for the CH-3 pump; all costs must be included in the bid price as per the ATC and GCC.
Eligibility requires not being under hold with Vizag Steel Plant; provide Make/Model, catalogues, and comply with GCC/ATC; provide necessary certifications and experience in similar motor-control equipment procurements.
Direct inquiries to the designated Vizag Steel contact: [email protected]; ensure all communications reference the soft starter CH-3 pump scope and provide detailed specifications from catalogues.
Access all tender documents at no cost
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS