Line Interactive UPS with AVR (V2)
South Central Railway
HYDERABAD, TELANGANA
Bid Publish Date
29-Dec-2025, 4:55 pm
Bid End Date
13-Jan-2026, 2:00 pm
Location
Progress
Quantity
29
Bid Type
Two Packet Bid
The opportunity is issued by the Directorate Of Technical Education And Training (West Bengal) for procurement of a Line Interactive UPS with AVR (V2) in Birbhum, West Bengal 731101. The procurement scope centers on Line Interactive UPS with AVR capability, covering key performance aspects such as rating in KVA, inverter efficiency, and battery backup time. The contract contemplates potential quantity variation up to 25% of bid quantity during order placement and within the contract period, with delivery timelines adjusted using a defined formula and a minimum of 30 days. Bidder installation and commissioning must be performed by the OEM or OEM-certified resource or an OEM-authorised reseller. The tender emphasizes the financial capability of bidders via a three-year average turnover criterion and mandates OEM turnover eligibility for stage-wise authentication. A nationwide service footprint is implied through the requirement for service centers in the consignees’ states, ensuring post-sale support. This tender highlights the critical combination of technical capability, formal turnover metrics, and logistics readiness to deliver within the specified delivery window. The unique aspects include explicit OEM/authorized installation requirements and a structured option clause governing quantity adjustments and delivery extensions.
Line Interactive UPS with AVR (V2)
Rating (KVA): [Not specified in data] — extractable from bidder datasheet
Inverter Efficiency (%): [Not specified]
Minimum Guaranteed Battery Backup Time (Minutes): [Not specified]
Warranty: Line Interactive UPS warranty; Battery warranty from date of delivery
Rated Output (Volt) with THD (%)
AVR Voltage regulation performance in AC mode
25% quantity variation rights during and within contract term
OEM/OEM-certified installation and commissioning required
Bidder and OEM turnover criteria for last 3 years with documentary evidence
Not explicitly detailed in data; subject to bid terms set by buyer and standard procurement practice
Delivery period starts from last date of original delivery order; extended period applies with calculation (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified in data; typically implied under standard contract terms; refer to tender document for LD rates
Bidder must meet turnover criteria for last 3 years as per bid document
OEM of offered product must meet separate turnover criteria for last 3 years
Availability of Functional Service Centre in West Bengal for consignees
South Central Railway
HYDERABAD, TELANGANA
Geological Survey Of India (gsi)
BANGALORE, KARNATAKA
Rajasthan Electronics And Instruments Limited (reil) - Solar Pv Monitoring System Jaipur
JAIPUR, RAJASTHAN
All India Institute Of Speech And Hearing (aiish) Mysore
N/a
KANCHIPURAM, TAMIL NADU
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Rating (in KVA) | 1.0, 1.5, 2.0, 3 Or higher |
| GENERIC | Technology | MOSFET-PWM |
| GENERIC | Inverter Efficiency (%) | 70% or better Or higher |
| GENERIC | Minimum Guaranteed Battery Backup time (Minutes) on Full Load | 15, 30, 60, 90, 120, 180, 240 Or higher |
| GENERIC | Warranty for Line Interactive UPS | 2 Years, 3 Years, 4 Years, 5 Years Or higher |
| Battery/Backup Bank | Warranty for the battery from the date of delivery | 2 Years Or higher |
| FEATURES | Rated Output (Volt) with Total Harmonic Distortion (%) | Single Phase Sinewave 230v AC 50Hz with Total Harmonic Distortion as <3% Or higher |
| FEATURES | Variation in AVR output in AC mode (AVR Voltage regulation) | 230 Volts +/-15% |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Audited Balance Sheets or CA/CMA turnover certificates for last 3 financial years
OEM authorization letter or OEM-certified installation capability
Proof of functional Service Centre in West Bengal
Technical bid documents detailing UPS specifications and compliance
Delivery/commercial terms including EMD (if applicable) and bid security
Any prior similar project experience certificates
Key insights about WEST BENGAL tender market
Bidders must submit GST, PAN, audited turnover certificates, OEM authorization, and proof of a West Bengal service centre. Ensure the UPS model supports AVR and THD specifications, with installation performed by OEM-certified personnel and turnover meeting the three-year criterion.
Submit GST certificate, PAN, audited balance sheets or CA/CMA turnover certificates for last 3 years, OEM authorization letter, proof of service centers in West Bengal, technical bid, and any prior project experience certificates related to UPS or similar electrical equipment.
Delivery begins after the last delivery order date; option to increase quantity by up to 25% with contract rates. If extended, time is calculated as (Increased quantity/Original quantity) × Original delivery period, with a minimum extension of 30 days.
Suppliers must demonstrate OEM authorization and offer AVR-enabled Line Interactive UPS with warranty coverage; ensure compliance with THD and AVR regulation requirements, and provide evidence of service capability in West Bengal per buyer’s terms.
OEMs must show three-year average annual turnover, supported by audited statements or CA/CMA certificates; if OEM is younger, turnover is calculated from completed financial years after incorporation, and highest bid category OEM must meet criteria.
Installation/commissioning must be performed by the OEM, OEM-certified resource, or OEM-authorised reseller; provide installation readiness proof and trained personnel details in the bid submission.
Bidder must have a functional service centre in the State of each consignee location, ensuring timely maintenance, replacement parts, and on-site support during warranty and AMC periods.
The tender specifies warranty for the Line Interactive UPS and separate battery warranty from delivery date; exact duration should be detailed in the bid; bidders must confirm both warranties and provide supplier terms.
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS