Procurement Opportunity: SITC of 8 passenger Machine room less lift,AMC Comprehensive Preventive Breakdown Maintenance,Durin in CENTRAL DELHI, DELHI

Bid Publish Date

02-Feb-2026, 12:12 pm

Bid End Date

17-Feb-2026, 2:00 pm

EMD

₹38,146

Value

₹19,07,298

Latest Corrigendum Available

Progress

Issue02-Feb-2026, 12:12 pm
Corrigendum12-Feb-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

61

Category

SITC of 8 passenger Machine room less lift

Bid Type

Two Packet Bid

Categories 33

Bharat Sanchar Nigam Limited Portal(bsnl) announces a tender for SITC of 8 passenger Machine room less lift, AMC Comprehensive Preventive Breakdown Maintenance, During 2nd Year of AMC after warranty period, During 3rd Year of AMC after warranty period, During 4th Year of AMC after warranty period, During 5th Year of AMC after warranty period in CENTRAL DELHI, DELHI. Quantity: 61. Submission Deadline: 17-02-2026 14: 00: 00. Last date to apply is approaching fast!

Documents 5

GeM-Bidding-8912065.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

SITC OF AUTO TITRATOR FOR TAN,FIRST YEAR AMC,SECOND YEAR AMC,THIRD YEAR AMC,FOURTH YEAR AMC,FIFTH Y

Hindustan Petroleum Corporation Ltd

TIRUVALLUR, TAMIL NADU

Posted: 17 July 2025
Closed: 28 July 2025
GEM

Highback Executive Chair Type 2,Highback Executive Chair-Type 1,Visitor Chair,Executive Table,Compu

Airports Authority Of India

CHENNAI, TAMIL NADU

Posted: 3 September 2025
Closed: 23 September 2025
GEM

SITC OF H2S ANALYZER,SUPPLY OF MANDATORY SPARES AND CONSUMBLES,FIRST YEAR AMC,SECOND YEAR AMC,THIRD

Hindustan Petroleum Corporation Ltd

ERNAKULAM, KERALA

Posted: 26 June 2025
Closed: 7 July 2025
GEM

Customized AMC/CMC for Pre-owned Products - For AMC of Passenger Lift Installed at New Office Build

Sjvn Limited

SHIMLA, HIMACHAL PRADESH

Posted: 8 September 2025
Closed: 1 October 2025
GEM

AMC FOR AIR CONDITIONER MACHINES, AMC period-1year, Total machine-24 nos(17 nos 1.5T Window machine

Andrew Yule And Company Limited

Posted: 15 November 2024
Closed: 6 December 2024
GEM

Bill of Quantities (BOQ) 6 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 SITC of 8 passenger Machine room less lift SITC of 8 passenger 544 Kgs Machine room less MRL lift with regenerative drive Elec Works PartIII LIft and Escalator 2003 BIS NBC 2016 prov for barrier free access Guidelines and Stand in lift shaft as per detailed spec. enclosed under including all other equipment and accessories complete as required i Speed1 MPS ii Floors3 G plus2 iii Travel 12 Meters approx. iv Stops and opening 3 stops and 3 openings v Controller A.C. vari voltage and variable freq vi Auto rescue device ARD complete dry maintce free batteries as required. vii Op Micropro based single autopush button simplexduplex collective selective withwithout attendant viii Power415 Volts10 perct 3 phase 50 Hz 4 wires system ix Car Encl SS scratch proof Moon Rock Honeycomb Hairline Finish on all sides and SS decor ceiling fans indirect throw and LED fitting. x The car floor smooth antiskid apprd by engineerincharge. xi Type of doors Car Power oper centre opening horiz sliding SS scratch proof Moon Rock Honeycomb Hairline Finish. b Landing doors SS scratch proof. xii A hand rail not less that 600mm long 900mm above floor level fixed adjac to control panel in the lift car. xiii Voice annouc sys car to announce position elevator hoist way car passes or stops at floor served elevator. xiv Closed loop Control System protec power fluctuation xv The lift doors vision enable persons hearing impairment to signal assis event emergency. xvi An approp. tech support be prov Through emerg messaging or alarms etc. to respond to the emergency reqmnts of person hearing impairment or deafness. xvii In case failure ARD eletronic devices provision manual rescue be provided. Note 1. It responsibility firm install cleared Lift Inspector obtain lift operation license installcarried out relevant Lift Act relevant I.S. safety standard.2. Lift installed shaft MS struc by Civil. 3. Agency visit before quoting. Items are as per schedule of work item 1 1 no ipgsdeed2@nd 180
2 AMC Comprehensive Preventive Breakdown Maintenance Sub Head II AMC Comprehensive Preventive Breakdown Maintenance of above Lift with all its associated items including ARD and its battery by deploying specialized man power supplying fixing required spares tools and plant etc. to keep all the equipments healthy operational including scheduled maintenance as per manufacturers recommendations as per the specification attached.During 1st Year of AMC after warranty period.Items are as per schedule of work item 2.a 12 months ipgsdeed2@nd 180
3 During 2nd Year of AMC after warranty period During 2nd Year of AMC after warranty period. Items are as per schedule of work item 2.b 12 months ipgsdeed2@nd 180
4 During 3rd Year of AMC after warranty period During 3rd Year of AMC after warranty period. Items are as per schedule of work item 2.c 12 months ipgsdeed2@nd 180
5 During 4th Year of AMC after warranty period During 4th Year of AMC after warranty period. Items are as per schedule of work item 2.d 12 months ipgsdeed2@nd 180
6 During 5th Year of AMC after warranty period During 5th Year of AMC after warranty period. Items are as per schedule of work item 2.e 12 months ipgsdeed2@nd 180

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

Additional Doc 1 (Requested in ATC)

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

2 Updates
#1

Update

12-Feb-2026

Extended Deadline

17-Feb-2026, 2:00 pm

Opening Date

17-Feb-2026, 2:30 pm

#2

Update

02-Feb-2026