SITC OF AUTO TITRATOR FOR TAN,FIRST YEAR AMC,SECOND YEAR AMC,THIRD YEAR AMC,FOURTH YEAR AMC,FIFTH Y
Hindustan Petroleum Corporation Ltd
TIRUVALLUR, TAMIL NADU
Bid Publish Date
02-Feb-2026, 12:12 pm
Bid End Date
17-Feb-2026, 2:00 pm
EMD
₹38,146
Value
₹19,07,298
Location
Progress
Quantity
61
Category
SITC of 8 passenger Machine room less lift
Bid Type
Two Packet Bid
Bharat Sanchar Nigam Limited Portal(bsnl) announces a tender for SITC of 8 passenger Machine room less lift, AMC Comprehensive Preventive Breakdown Maintenance, During 2nd Year of AMC after warranty period, During 3rd Year of AMC after warranty period, During 4th Year of AMC after warranty period, During 5th Year of AMC after warranty period in CENTRAL DELHI, DELHI. Quantity: 61. Submission Deadline: 17-02-2026 14: 00: 00. Last date to apply is approaching fast!
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Petroleum Corporation Ltd
TIRUVALLUR, TAMIL NADU
Airports Authority Of India
CHENNAI, TAMIL NADU
Hindustan Petroleum Corporation Ltd
ERNAKULAM, KERALA
Sjvn Limited
SHIMLA, HIMACHAL PRADESH
Andrew Yule And Company Limited
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | SITC of 8 passenger Machine room less lift | SITC of 8 passenger 544 Kgs Machine room less MRL lift with regenerative drive Elec Works PartIII LIft and Escalator 2003 BIS NBC 2016 prov for barrier free access Guidelines and Stand in lift shaft as per detailed spec. enclosed under including all other equipment and accessories complete as required i Speed1 MPS ii Floors3 G plus2 iii Travel 12 Meters approx. iv Stops and opening 3 stops and 3 openings v Controller A.C. vari voltage and variable freq vi Auto rescue device ARD complete dry maintce free batteries as required. vii Op Micropro based single autopush button simplexduplex collective selective withwithout attendant viii Power415 Volts10 perct 3 phase 50 Hz 4 wires system ix Car Encl SS scratch proof Moon Rock Honeycomb Hairline Finish on all sides and SS decor ceiling fans indirect throw and LED fitting. x The car floor smooth antiskid apprd by engineerincharge. xi Type of doors Car Power oper centre opening horiz sliding SS scratch proof Moon Rock Honeycomb Hairline Finish. b Landing doors SS scratch proof. xii A hand rail not less that 600mm long 900mm above floor level fixed adjac to control panel in the lift car. xiii Voice annouc sys car to announce position elevator hoist way car passes or stops at floor served elevator. xiv Closed loop Control System protec power fluctuation xv The lift doors vision enable persons hearing impairment to signal assis event emergency. xvi An approp. tech support be prov Through emerg messaging or alarms etc. to respond to the emergency reqmnts of person hearing impairment or deafness. xvii In case failure ARD eletronic devices provision manual rescue be provided. Note 1. It responsibility firm install cleared Lift Inspector obtain lift operation license installcarried out relevant Lift Act relevant I.S. safety standard.2. Lift installed shaft MS struc by Civil. 3. Agency visit before quoting. Items are as per schedule of work item 1 | 1 | no | ipgsdeed2@nd | 180 |
| 2 | AMC Comprehensive Preventive Breakdown Maintenance | Sub Head II AMC Comprehensive Preventive Breakdown Maintenance of above Lift with all its associated items including ARD and its battery by deploying specialized man power supplying fixing required spares tools and plant etc. to keep all the equipments healthy operational including scheduled maintenance as per manufacturers recommendations as per the specification attached.During 1st Year of AMC after warranty period.Items are as per schedule of work item 2.a | 12 | months | ipgsdeed2@nd | 180 |
| 3 | During 2nd Year of AMC after warranty period | During 2nd Year of AMC after warranty period. Items are as per schedule of work item 2.b | 12 | months | ipgsdeed2@nd | 180 |
| 4 | During 3rd Year of AMC after warranty period | During 3rd Year of AMC after warranty period. Items are as per schedule of work item 2.c | 12 | months | ipgsdeed2@nd | 180 |
| 5 | During 4th Year of AMC after warranty period | During 4th Year of AMC after warranty period. Items are as per schedule of work item 2.d | 12 | months | ipgsdeed2@nd | 180 |
| 6 | During 5th Year of AMC after warranty period | During 5th Year of AMC after warranty period. Items are as per schedule of work item 2.e | 12 | months | ipgsdeed2@nd | 180 |
Discover companies most likely to bid on this tender
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
17-Feb-2026, 2:00 pm
Opening Date
17-Feb-2026, 2:30 pm
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS