TenderDekho Logo
Closed GEM

UPPCL Carriage, Erection & Transmission Line Works Tender Aligarh UP 2026

Bid Publish Date

08-Aug-2026, 4:44 pm

Bid End Date

24-Aug-2026, 4:00 pm

Value

₹5,00,000

Progress

RA
Issue08-Aug-2026, 4:44 pm
Reverse Auction04-Sep-2026, 7:00 pm
AwardCompleted

Key Highlights

  • System-wide scope includes carriage of PCC/STP poles (8.5/9/11/13 m) and erection of double poles
  • Laying of ACSR conductors (Weasal, Rabbit, Dog) and 11 kV insulators with fittings
  • Inclusion of distribution boxes, stay wires, clamps, and mounting hardware
  • Tree trimming and restoration works for HT/LT lines; dismantling of old 33 kV/11 kV lines

Tender Overview

Uttar Pradesh Power Corporation Limited (UPPCL) invites bids for a comprehensive carriage, erection, isolation, and associated works across high-tension distribution lines in Aligarh, Uttar Pradesh. The procurement covers PCC/STP poles 8.5, 9, 11, and 13 m, carriage of line material, erection of double poles, laying of ACSR Weasal, Rabbit and Dog Conductor, 11 kV insulators with fittings, V-type cross arms, clamps, distribution boxes, and related hardware. The contract scope includes stay wire fixing, tree trimming to restore HT/LT lines, and dismantling of old 33 kV or 11 kV lines. Estimated value is ₹500,000. A 14-item Bill of Quantities suggests a broad, integrated field operation.

  • Location: Aligarh, Uttar Pradesh
  • Organization: UPPCL
  • Scope: Carriage, Erection, Laying, Insulation, and Ancillary Works for 11 kV/HT lines
  • Distinctive factor: Comprehensive field works with variable quantity provisioning under option clause
  • Key consideration: ATC references govern bidder obligations; data gaps require adherence to purchaser terms

Technical Specifications & Requirements

  • No explicit technical specs in the tender data; the scope implies standard utility construction practices for PCC/STP poles, ACSR conductor strings, insulators, and brackets used in 11 kV networks
  • Expected items include: PCC/STP poles (8.5/9/11/13 m), ACSR conductors (Weasal, Rabbit, Dog), 11 kV insulators and fittings, V cross arms, MS stay/LT clamps, and distribution boxes
  • The tender includes work to cut and prune trees affecting HT/LT lines and dismantle obsolete 33 kV/11 kV lines, indicating a broad field-operations requirement
  • The terms mention a standard option clause governing quantity variation up to 25%, and delivery time calculations based on last delivery order with a minimum of 30 days; complies with typical civil/mechanical/line works
  • No specified brand/OEM, but ATC documents provided by buyer should guide technical compliance
  • Ensure readiness for on-site installation, testing, and commissioning as per UP electricity regulations

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease contracted quantity by up to 25%; extended delivery time formula applies with minimum 30 days
  • Delivery Period: Commences from last date of original delivery order; additional time follows the option clause formula
  • ATC/Attachment: Bidder must review uploaded ATC document for project-specific clauses
  • EMD: Not specified in provided data; confirm exact amount in ATC/GEM portal
  • Payment Terms: Not detailed here; verify in contract terms and ATC
  • Dismantling/Tree trimming: Included; ensure compliance with safety standards and clearance protocols
  • BOQ: 14 items present, but no quantities listed in data; bidders must rely on site assessment and ATC for exact quantities
  • Compliance with safety regulations, site restoration, and environmental considerations are implied

Key Specifications

  • PCC/STP poles: 8.5 m, 9 m, 11 m, 13 m

  • ACSR conductors: Weasal, Rabbit, Dog variants

  • 11 kV insulators with fittings; 11 kV pin insulators with fittings

  • MS pole clamps or LT clamps; V-type cross arms

  • Distribution boxes; stay wire fixing/grouting

  • Tree trimming and clearance work for HT/LT lines

  • Old line dismantling for 33 kV/11 kV systems

  • Delivery extension rules under 25% quantity variation

Terms & Conditions

  • Delivery can vary by up to 25% in quantity with corresponding time adjustments

  • ATC document governs specific contractual clauses and compliance requirements

  • EMD, payment terms, and exact BOQ quantities to be confirmed in official tender documents

Important Clauses

Payment Terms

Not specified in available data; verify in ATC and contract; ensure alignment with UPPCL payment schedules

Delivery Schedule

Delivery time calculated from last date of original delivery order; extended time determined by (increased quantity ÷ original quantity) × original delivery period with minimum 30 days

Penalties/Liquidated Damages

Not disclosed in current data; confirm LD provisions in official tender terms and ATC

Bidder Eligibility

  • Experience in carriage and erection works for HT/LT lines

  • Financial stability with verifiable turnover

  • Compliance with safety standards and on-site execution capabilities

Authority & Contact

Technical Results

S.No Seller Item Date Status
1
M/S A R K ELECTRICALS   Under PMA
-20-08-2026 15:53:40
2
M/S RADHA KRISHAN CONTRACTOR   Under PMA
-24-08-2026 11:02:32
3
M/S RIZVI ASSOCIATES   Under PMA
-22-08-2026 22:26:54
4
tyne enterprises   Under PMA
-22-08-2026 22:09:45

Financial Results

Rank Seller Price Item
L1
tyne enterprises   Under PMA
Item Categories : Carriage of following PCC STP poles 8.5 and 9 and 11 and 13 Mtr,Carriage of line material,Erection
L2
M/S RIZVI ASSOCIATES   Under PMA
Item Categories : Carriage of following PCC STP poles 8.5 and 9 and 11 and 13 Mtr,Carriage of line material,Erection
L3
M/S RADHA KRISHAN CONTRACTOR   Under PMA
Item Categories : Carriage of following PCC STP poles 8.5 and 9 and 11 and 13 Mtr,Carriage of line material,Erection

Reverse Auction Schedule

Completed

Start

04-Sep-2026, 7:00 pm

End

05-Sep-2026, 7:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

5825

Category

Carriage of following PCC STP poles 8.5 and 9 and 11 and 13 Mtr

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

2

OEM Avg. Turnover

2

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Carriage of following PCC STP poles 8.5 and 9 and 11 and 13 Mtr , Carriage of line material , Erection of PCC and STP poles 8.5 and 9 and 11 and 13 Mtr , Erection of Double poles 8.5 and 9 and 11 and 13 Mtr , Laying of ACSR Weasal, Rabbit and Dog Conductor. , 11 KV Dise Insulator with fining , 11 KV Pin Insulator with fitting , 11 KV V type Coss Arm , F Bracket , MS Pole Clamp or LT Clamp etc. , Distribution Box , Fixing or grouting of Stay wire complete. , Lopping and Chopping of tree branches to restoration of HT or LT Line , Dismentling of old and damaged 33 KV or 11 KV Line

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

12

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

21

Delivery Locations

1

Delivery Cities

Aligarh

Delivery Pincodes

202001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rohitas Singh Jangpangi202001,Superintending Engineer, EDC-II Aligarh, SCADA, Building, Lal Diggi, Aligarh-202001AligarhUttar Pradesh20200115021-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9730037.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 14 Items Sign in for GEM prices

#1

Carriage of following PCC STP poles 8.5 and 9 and 11 and 13 Mtr

Carriage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road Including the work of its loading and unloading at the respective ends also including the work of dragging etc. and also including the cost of labour T P carrier etc required for proper completion of work. (Dist. O to 50 Kms.). PCC STP poles 8.5, 9, 11, 13 Mtr.

150 nos Delivery: 21 days
#2

Carriage of line material

Carriage of line material viz LT Cable, Conductor Gi earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc, and also including the cost of labour, T P carrier etc. required for proper completion of work. (Dist. 0 10 50 Km)

30 qtl Delivery: 21 days
#3

Erection of PCC and STP poles 8.5 and 9 and 11 and 13 Mtr

Erection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work

150 nos Delivery: 21 days
#4

Erection of Double poles 8.5 and 9 and 11 and 13 Mtr

Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work

30 nos Delivery: 21 days
#5

Laying of ACSR Weasal, Rabbit and Dog Conductor.

Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work

4,200 mtr Delivery: 21 days
#6

11 KV Dise Insulator with fining

Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store.

150 nos Delivery: 21 days
#7

11 KV Pin Insulator with fitting

Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store.

100 nos Delivery: 21 days
#8

11 KV V type Coss Arm

Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store.

25 nos Delivery: 21 days
#9

F Bracket

Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store.

30 nos Delivery: 21 days
#10

MS Pole Clamp or LT Clamp etc.

Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store.

60 nos Delivery: 21 days
#11

Distribution Box

Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store.

10 nos Delivery: 21 days
#12

Fixing or grouting of Stay wire complete.

Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store.

25 nos Delivery: 21 days
#13

Lopping and Chopping of tree branches to restoration of HT or LT Line

Lopping and Chopping of tree branches to restoration of HT or LT Line network including cost of material, men and T and P

850 nos Delivery: 22 days
#14

Dismentling of old and damaged 33 KV or 11 KV Line

Dismentling of old and damaged 33 KV or 11 KV Line on Double Pole or Section Pole after Dismentling of all Accessories. It included the work of cartage, cost of labour, T and P.

15 qtl Delivery: 23 days

Categories 51

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar line works

4

Financial statements or turnover proof

5

EMD/Security deposit documentation (as specified in ATC)

6

Technical bid documents and compliance certificates

7

OEM authorizations or manufacturer approvals (if applicable)

8

Any site-specific safety and environmental clearances

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for Aligarh carriage and erection tender in UP 2026?

Bidders should submit GST, PAN, experience certificates, financials, EMD and technical compliance. Review the ATC for project-specific clauses, and ensure capability for carriage, erection, ACSR laying, and tree trimming. Delivery terms follow 25% quantity variation with minimum 30 days, and site safety compliance.

What documents are required for UPPCL line works tender in Aligarh?

Required documents include GST certificate, PAN, experience certificates for similar line works, financial statements, EMD details, technical bid, OEM authorizations if applicable, and safety/environmental clearances. Ensure submission aligns with ATC document and GEM portal guidelines.

What are the technical specifications for PCC/STP poles in this bid?

Poles of 8.5 m, 9 m, 11 m, and 13 m lengths are involved; expect ACSR conductors such as Weasal, Rabbit, and Dog; insulators and fittings for 11 kV; V-type cross arms and brackets. Exact load ratings and jointing standards will be confirmed in ATC/SPEC annexure.

When is the delivery window and quantity variation allowed for this tender?

Delivery can vary by up to 25% of the bid quantity; additional time is computed as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. Delivery starts after the last delivery order date per clause in ATC.

What are the EMD and payment terms for UPPCL line work contract?

EMD details are not disclosed in the provided data; verify in the ATC. Payment terms are not explicitly stated here; bidders should reference contract terms and UP electricity procurement norms for schedule payments upon milestone completion and acceptance.

What safety and environmental requirements apply to this UP tender?

Bidders must comply with on-site safety standards for HT/LT line work, tree trimming, and dismantling activities; ensure use of PPE, risk assessments, and environmental clearance where applicable, as per UPPCL guidelines and ATC.

What documents confirm eligibility for UPPCL Aligarh line project 2026?

Eligibility requires demonstrated experience in similar HT/LT line projects, solid financials, GST/PAN validity, and technical certifications or OEM authorizations if required; ATC may specify pre-qualification criteria and site visit prerequisites.

How to understand the ATC terms for this Aligarh tender in UP?

ATC contains bid-specific clauses including option quantity, delivery adjustments, and compliance standards. Download and review the ATC document; ensure your bid aligns with 25% quantity variance rules and the delivery calculation method described.