RAUttar Pradesh Power Corporation Limited (UPPCL) invites bids for a comprehensive carriage, erection, isolation, and associated works across high-tension distribution lines in Aligarh, Uttar Pradesh. The procurement covers PCC/STP poles 8.5, 9, 11, and 13 m, carriage of line material, erection of double poles, laying of ACSR Weasal, Rabbit and Dog Conductor, 11 kV insulators with fittings, V-type cross arms, clamps, distribution boxes, and related hardware. The contract scope includes stay wire fixing, tree trimming to restore HT/LT lines, and dismantling of old 33 kV or 11 kV lines. Estimated value is ₹500,000. A 14-item Bill of Quantities suggests a broad, integrated field operation.
PCC/STP poles: 8.5 m, 9 m, 11 m, 13 m
ACSR conductors: Weasal, Rabbit, Dog variants
11 kV insulators with fittings; 11 kV pin insulators with fittings
MS pole clamps or LT clamps; V-type cross arms
Distribution boxes; stay wire fixing/grouting
Tree trimming and clearance work for HT/LT lines
Old line dismantling for 33 kV/11 kV systems
Delivery extension rules under 25% quantity variation
Delivery can vary by up to 25% in quantity with corresponding time adjustments
ATC document governs specific contractual clauses and compliance requirements
EMD, payment terms, and exact BOQ quantities to be confirmed in official tender documents
Not specified in available data; verify in ATC and contract; ensure alignment with UPPCL payment schedules
Delivery time calculated from last date of original delivery order; extended time determined by (increased quantity ÷ original quantity) × original delivery period with minimum 30 days
Not disclosed in current data; confirm LD provisions in official tender terms and ATC
Experience in carriage and erection works for HT/LT lines
Financial stability with verifiable turnover
Compliance with safety standards and on-site execution capabilities
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | M/S A R K ELECTRICALS Under PMA | - | 20-08-2026 15:53:40 | |
| 2 | M/S RADHA KRISHAN CONTRACTOR Under PMA | - | 24-08-2026 11:02:32 | |
| 3 | M/S RIZVI ASSOCIATES Under PMA | - | 22-08-2026 22:26:54 | |
| 4 | tyne enterprises Under PMA | - | 22-08-2026 22:09:45 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | tyne enterprises Under PMA | Item Categories : Carriage of following PCC STP poles 8.5 and 9 and 11 and 13 Mtr,Carriage of line material,Erection | |
| L2 | M/S RIZVI ASSOCIATES Under PMA | Item Categories : Carriage of following PCC STP poles 8.5 and 9 and 11 and 13 Mtr,Carriage of line material,Erection | |
| L3 | M/S RADHA KRISHAN CONTRACTOR Under PMA | Item Categories : Carriage of following PCC STP poles 8.5 and 9 and 11 and 13 Mtr,Carriage of line material,Erection |
Start
04-Sep-2026, 7:00 pm
End
05-Sep-2026, 7:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
5825
Category
Carriage of following PCC STP poles 8.5 and 9 and 11 and 13 Mtr
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
2
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Carriage of following PCC STP poles 8.5 and 9 and 11 and 13 Mtr , Carriage of line material , Erection of PCC and STP poles 8.5 and 9 and 11 and 13 Mtr , Erection of Double poles 8.5 and 9 and 11 and 13 Mtr , Laying of ACSR Weasal, Rabbit and Dog Conductor. , 11 KV Dise Insulator with fining , 11 KV Pin Insulator with fitting , 11 KV V type Coss Arm , F Bracket , MS Pole Clamp or LT Clamp etc. , Distribution Box , Fixing or grouting of Stay wire complete. , Lopping and Chopping of tree branches to restoration of HT or LT Line , Dismentling of old and damaged 33 KV or 11 KV Line
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
12
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
21
Delivery Locations
1
Delivery Cities
Aligarh
Delivery Pincodes
202001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rohitas Singh Jangpangi | 202001,Superintending Engineer, EDC-II Aligarh, SCADA, Building, Lal Diggi, Aligarh-202001 | Aligarh | Uttar Pradesh | 202001 | 150 | 21 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Carriage of following PCC STP poles 8.5 and 9 and 11 and 13 Mtr
Carriage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road Including the work of its loading and unloading at the respective ends also including the work of dragging etc. and also including the cost of labour T P carrier etc required for proper completion of work. (Dist. O to 50 Kms.). PCC STP poles 8.5, 9, 11, 13 Mtr.
Carriage of line material
Carriage of line material viz LT Cable, Conductor Gi earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc, and also including the cost of labour, T P carrier etc. required for proper completion of work. (Dist. 0 10 50 Km)
Erection of PCC and STP poles 8.5 and 9 and 11 and 13 Mtr
Erection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work
Erection of Double poles 8.5 and 9 and 11 and 13 Mtr
Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work
Laying of ACSR Weasal, Rabbit and Dog Conductor.
Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work
11 KV Dise Insulator with fining
Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store.
11 KV Pin Insulator with fitting
Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store.
11 KV V type Coss Arm
Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store.
F Bracket
Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store.
MS Pole Clamp or LT Clamp etc.
Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store.
Distribution Box
Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store.
Fixing or grouting of Stay wire complete.
Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store.
Lopping and Chopping of tree branches to restoration of HT or LT Line
Lopping and Chopping of tree branches to restoration of HT or LT Line network including cost of material, men and T and P
Dismentling of old and damaged 33 KV or 11 KV Line
Dismentling of old and damaged 33 KV or 11 KV Line on Double Pole or Section Pole after Dismentling of all Accessories. It included the work of cartage, cost of labour, T and P.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Carriage of following PCC STP poles 8.5 and 9 and 11 and 13 Mtr | Carriage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road Including the work of its loading and unloading at the respective ends also including the work of dragging etc. and also including the cost of labour T P carrier etc required for proper completion of work. (Dist. O to 50 Kms.). PCC STP poles 8.5, 9, 11, 13 Mtr. | 150 | nos | edcaligarh2consignee | 21 | |
| 2 | Carriage of line material | Carriage of line material viz LT Cable, Conductor Gi earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc, and also including the cost of labour, T P carrier etc. required for proper completion of work. (Dist. 0 10 50 Km) | 30 | qtl | edcaligarh2consignee | 21 | |
| 3 | Erection of PCC and STP poles 8.5 and 9 and 11 and 13 Mtr | Erection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work | 150 | nos | edcaligarh2consignee | 21 | |
| 4 | Erection of Double poles 8.5 and 9 and 11 and 13 Mtr | Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work | 30 | nos | edcaligarh2consignee | 21 | |
| 5 | Laying of ACSR Weasal, Rabbit and Dog Conductor. | Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work | 4,200 | mtr | edcaligarh2consignee | 21 | |
| 6 | 11 KV Dise Insulator with fining | Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store. | 150 | nos | edcaligarh2consignee | 21 | |
| 7 | 11 KV Pin Insulator with fitting | Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store. | 100 | nos | edcaligarh2consignee | 21 | |
| 8 | 11 KV V type Coss Arm | Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store. | 25 | nos | edcaligarh2consignee | 21 | |
| 9 | F Bracket | Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store. | 30 | nos | edcaligarh2consignee | 21 | |
| 10 | MS Pole Clamp or LT Clamp etc. | Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store. | 60 | nos | edcaligarh2consignee | 21 | |
| 11 | Distribution Box | Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store. | 10 | nos | edcaligarh2consignee | 21 | |
| 12 | Fixing or grouting of Stay wire complete. | Replacement and Re fixing of following damaged hardward and Fitting of damaged line network including shifting of new or old material to store. | 25 | nos | edcaligarh2consignee | 21 | |
| 13 | Lopping and Chopping of tree branches to restoration of HT or LT Line | Lopping and Chopping of tree branches to restoration of HT or LT Line network including cost of material, men and T and P | 850 | nos | edcaligarh2consignee | 22 | |
| 14 | Dismentling of old and damaged 33 KV or 11 KV Line | Dismentling of old and damaged 33 KV or 11 KV Line on Double Pole or Section Pole after Dismentling of all Accessories. It included the work of cartage, cost of labour, T and P. | 15 | qtl | edcaligarh2consignee | 23 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar line works
Financial statements or turnover proof
EMD/Security deposit documentation (as specified in ATC)
Technical bid documents and compliance certificates
OEM authorizations or manufacturer approvals (if applicable)
Any site-specific safety and environmental clearances
Key insights about UTTAR PRADESH tender market
Bidders should submit GST, PAN, experience certificates, financials, EMD and technical compliance. Review the ATC for project-specific clauses, and ensure capability for carriage, erection, ACSR laying, and tree trimming. Delivery terms follow 25% quantity variation with minimum 30 days, and site safety compliance.
Required documents include GST certificate, PAN, experience certificates for similar line works, financial statements, EMD details, technical bid, OEM authorizations if applicable, and safety/environmental clearances. Ensure submission aligns with ATC document and GEM portal guidelines.
Poles of 8.5 m, 9 m, 11 m, and 13 m lengths are involved; expect ACSR conductors such as Weasal, Rabbit, and Dog; insulators and fittings for 11 kV; V-type cross arms and brackets. Exact load ratings and jointing standards will be confirmed in ATC/SPEC annexure.
Delivery can vary by up to 25% of the bid quantity; additional time is computed as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. Delivery starts after the last delivery order date per clause in ATC.
EMD details are not disclosed in the provided data; verify in the ATC. Payment terms are not explicitly stated here; bidders should reference contract terms and UP electricity procurement norms for schedule payments upon milestone completion and acceptance.
Bidders must comply with on-site safety standards for HT/LT line work, tree trimming, and dismantling activities; ensure use of PPE, risk assessments, and environmental clearance where applicable, as per UPPCL guidelines and ATC.
Eligibility requires demonstrated experience in similar HT/LT line projects, solid financials, GST/PAN validity, and technical certifications or OEM authorizations if required; ATC may specify pre-qualification criteria and site visit prerequisites.
ATC contains bid-specific clauses including option quantity, delivery adjustments, and compliance standards. Download and review the ATC document; ensure your bid aligns with 25% quantity variance rules and the delivery calculation method described.