Progress
Quantity
2390
Category
Installation of VRLA Battery 400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required
Bid Type
Two Packet Bid
Bharat Sanchar Nigam Limited Portal(bsnl) invites bids for Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories, Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories, Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories, Dismantling of VLRA Power Plant including disconecting power cables with all accessories, Installation of VRLA Battery 400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required, Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required, Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required, Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required, Additional charges to shift the VRLA Battery 400AH TO 900AH set to upper floor at siteIn the case of buildings where lift facility is not available, Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available, Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available, Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required, Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required, Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available, Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available, Transportation of Battery Power plant Liion BBPP from BA Stores or any sites as instructed by site in charge, Loading and unloading charges in KOLLAM, KERALA. Quantity: 2390. Submission Deadline: 26-05-2026 11: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories , Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories , Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories , Dismantling of VLRA Power Plant including disconecting power cables with all accessories , Installation of VRLA Battery 400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required , Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required , Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required , Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required , Additional charges to shift the VRLA Battery 400AH TO 900AH set to upper floor at siteIn the case of buildings where lift facility is not available , Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available , Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available , Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required , Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required , Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available , Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available , Transportation of Battery Power plant Liion BBPP from BA Stores or any sites as instructed by site in charge , Loading and unloading charges
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories
Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories
Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories
Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories
Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories
Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories
Dismantling of VLRA Power Plant including disconecting power cables with all accessories
Dismantling of VLRA Power Plant including disconecting power cables with all accessories
Installation of VRLA Battery 400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required
Installation of VRLA Battery 400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required
Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required
Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required
Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required
Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required
Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required
Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required
Additional charges to shift the VRLA Battery 400AH TO 900AH set to upper floor at siteIn the case of buildings where lift facility is not available
Additional charges to shift the VRLA Battery 400AH TO 900AH set to upper floor at siteIn the case of buildings where lift facility is not available
Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available
Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available
Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available
Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available
Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required
Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required
Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required
Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required
Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available
Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available
Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available
Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available
Transportation of Battery Power plant Liion BBPP from BA Stores or any sites as instructed by site in charge
Transportation of Battery Power plant Liion BBPP from BA Stores or any sites as instructed by site in charge
Loading and unloading charges
Loading and unloading charges
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories | Dismantling of VLRA Battery Set of Capacity 200AH to 900AH including disconnecting power cables along with all accessories | 60 | nos | agmklm | 90 | |
| 2 | Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories | Dismantling of VLRA battery set of Capacity 1000AH to 1500AH including disconnecting power cables along with all accessories | 25 | nos | agmklm | 90 | |
| 3 | Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories | Dismantling of VLRA battery set of capacity 2000AH to 4000AH including disconnecting power cables along with all accessories | 2 | nos | agmklm | 90 | |
| 4 | Dismantling of VLRA Power Plant including disconecting power cables with all accessories | Dismantling of VLRA Power Plant including disconecting power cables with all accessories | 36 | nos | agmklm | 90 | |
| 5 | Installation of VRLA Battery 400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required | Installation of VRLA Battery 400AH TO 600AH connecting HRC fuse testing and commissioning of the above battery AND PP set on available exchange load as required | 35 | nos | agmklm | 90 | |
| 6 | Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | Installation of VRLA Battery1000AH TO 1500AH connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | 20 | nos | agmklm | 90 | |
| 7 | Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required | Installation of VRLA Battery2000AH TO 4000AH connecting HRC fuse testing and commissioning of the above battery and PP set on available exchange load as required | 2 | nos | agmklm | 90 | |
| 8 | Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required | Installation of VRLA Power Plant connecting HRC fuse testing and commissioning of the above batter and PP set on available exchange load as required | 40 | nos | agmklm | 90 | |
| 9 | Additional charges to shift the VRLA Battery 400AH TO 900AH set to upper floor at siteIn the case of buildings where lift facility is not available | Additional charges to shift the VRLA Battery 400AH TO 900AH set to upper floor at siteIn the case of buildings where lift facility is not available | 35 | nos | agmklm | 90 | |
| 10 | Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available | Additional charges to shift the VRLA Battery1000AH TO 2000AHset to upper floor at siteIn the case of buildings where lift facility is not available | 5 | nos | agmklm | 90 | |
| 11 | Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available | Additional charges to shift the VRLA Power Plant to upper floor at siteIn the case of buildings where lift facility is not available | 15 | nos | agmklm | 90 | |
| 12 | Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | Installation of Battery PP sets LiIon 300 AH to 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | 25 | nos | agmklm | 90 | |
| 13 | Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | Installation of Battery PP sets LiIon above 900 AH and PP connecting HRC fuse testing and commissioning of the above batteryPP set on available exchange load as required | 5 | nos | agmklm | 90 | |
| 14 | Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available | Additional charges to shift the Liion BBPP 400AH TO 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available | 20 | nos | agmklm | 90 | |
| 15 | Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available | Additional charges to shift the Liion BBPP above 900AHandPP set to upper floor at site In the case of buildings where lift facility is not available | 5 | nos | agmklm | 90 | |
| 16 | Transportation of Battery Power plant Liion BBPP from BA Stores or any sites as instructed by site in charge | Transportation of Battery Power plant Liion BBPP from BA Stores or any sites as instructed by site in charge | 2,000 | km | agmklm | 90 | |
| 17 | Loading and unloading charges | Loading and unloading charges | 60 | nos | agmklm | 90 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
26-May-2026, 11:00 am
Opening Date
26-May-2026, 11:30 am
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS