Progress
Quantity
1
Bid Type
Two Packet Bid
The Department Of Health And Family Welfare of India invites bids for a Fume Exhaust System with Scrubber or Fume Hood with Scrubber, including installation, testing and commissioning. Estimated value and EMD are not disclosed. Location is nationwide India, with the procurement targeting standard-compliant exhaust and scrubber setups. The scope emphasizes on system components and post-installation support, with a focus on durability, compliance, and serviceability. Unique aspects include mandatory material test certificates and OEM authorization requirements, ensuring post-sale service within India. This opportunity targets bidders with demonstrated supply of central/state govt equipment and adherence to prescribed safety and performance standards.
Fume Exhaust System with Scrubber or Fume Hood with Scrubber
Internal washing/cleaning capability
Exhaust motor assembly speed (rpm) required
Sash handle specification
Base cabinet features
Material of construction
View glass water level indicator for scrubber
Water circulation flow rate (LPM)
Scrubber flow rate (cfm)
Warranty term
Installation included
3 years experience in similar govt category products
OEM authorization required for distributors
50% quantity variation rights for purchasers
Material Test Certificate and BIS/type test certificates mandatory
End User Certificate provided in buyer format if required
Installation, testing and commissioning included
Not specified in data; bidders should anticipate standard govt payment terms after completion of installation and acceptance.
Option clause allows up to 50% quantity variation; delivery periods to be calculated as per formula provided
Not specified; bidders should verify LD terms during bid submission and contract execution
Minimum 3 years experience in supplying similar govt category equipment
Authorized OEM authorization for distributors
Must have ongoing presence in India for after-sales service
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Fume Exhaust System with Scrubber or Fume Hood with Scrubber (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| Fume Exhaust System Specifications | Internal Washing or Cleaning | Yes |
| Fume Exhaust System Specifications | Exhaust Motor Assembly Speed, rpm | 2000 - 4000 |
| Fume Exhaust System Specifications | Sash Handle | Anodized Aluminium handle, Others |
| Fume Exhaust System Specifications | Base Cabinet Features | Adjustable Shelf |
| Fume Exhaust System Specifications | Material of Construction | Stainless Steel |
| Scrubber Specifications | View Glass Water Level Indicator | Yes |
| Scrubber Specifications | Water Circulation Flow Rate, LPM | 30 - 50 |
| Scrubber Specifications | Scrubber Flow rate, cfm | 3500, 3550, 4000 |
| Generic | Warranty | 3.0 |
| Generic | Installation Provided | Yes |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar govt projects (minimum 3 years)
Financial statements demonstrating liquidity
EMD/Security deposit proof (amount not disclosed in data)
Technical bid documents and product specifications
OEM authorization / Manufacturer’s certificate of authorization
Material Test Certificate and BIS/type test certificates
End User Certificate in Buyer’s format (if requested)
Extended Deadline
24-Feb-2026, 6:00 pm
Opening Date
24-Feb-2026, 6:30 pm
Extended Deadline
17-Feb-2026, 6:00 pm
Opening Date
17-Feb-2026, 6:30 pm
Extended Deadline
10-Feb-2026, 6:00 pm
Opening Date
10-Feb-2026, 6:30 pm
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | AMAZE INSTRUMENTS PRIVATE LIMITED Under PMA | Make : AI SCIENTIFIC Model : AI-149 | 09-02-2026 15:09:44 | |
| 2 | Cominus Under PMA | Make : Cominus Model : CM-FH-04 | 25-01-2026 17:23:46 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | AMAZE INSTRUMENTS PRIVATE LIMITED Under PMA | Item Categories : Fume Exhaust System with Scrubber or Fume Hood with Scrubber |
Please sign in or create an account to view contract details and download result documents.
Key insights about BIHAR tender market
Bidders must have 3 years of govt supply experience, provide OEM authorization if using distributors, submit Material Test Certificate and BIS/type certificates, and include installation/commissioning in the bid price. Ensure ISO/IS standards compliance and India after-sales support. Prepare End User Certificate in the buyer format if requested.
Required documents include GST registration, PAN, 3 years experience certificates, financial statements, EMD proof, OEM authorization, Material Test Certificate, BIS/type certificates, and technical bid documents. End User Certificate may be requested in the buyer format; ensure all certificates are valid and up-to-date.
Key scrubber specs include water circulation flow rate in LPM and scrubber flow rate in CFM. Exactly labeled as Water Circulation Flow Rate (LPM) and Scrubber Flow Rate (CFM); ensure the chosen system meets both parameters and associated electrical ratings suitable for installation in government facilities.
Bid price must cover Supply, Installation, Testing and Commissioning (SITC). Installation scope includes on-site setup, calibration of exhaust and scrubber systems, functional testing, and operator training where applicable. Confirm acceptance criteria with the buyer before final acceptance and payment release.
If bidding via authorized distributor, provide OEM authorization with full contact details. The OEM must have a registered Indian office to provide after-sales service. Include designation, address, email, and phone number to satisfy eligibility criteria.
Warranty is required but not quantified in data. Vendors should specify minimum warranty period and post-sale service terms in their technical bid, including response times, spare parts availability, and on-site support across India as part of after-sales commitment.
Scope includes Supply, Installation, Testing and Commissioning of fume exhaust system with scrubber or fume hood with scrubber, along with warranty and any required testing certificates. Ensure all components meet BIS/type test standards and that material certificates accompany delivery.
Bidders must include BIS licence and type test certificates with bid. The buyer lab will review Material Test Certificates and test results; acceptance will depend on lab outcomes. Prepare copies in electronic and hard formats to expedite verification.
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS