Tender Notice for Vibrometer - Induced Ground Vibration Monitoring Instrument in HAZARIBAG, JHARKHAND

Bid Publish Date

20-Feb-2026, 2:50 pm

Bid End Date

13-Mar-2026, 3:00 pm

Progress

Issue20-Feb-2026, 2:50 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2

Bid Type

Two Packet Bid

Categories 5

Ntpc Limited announces a tender for Vibrometer - Induced Ground Vibration Monitoring Instrument (Q3) in HAZARIBAG, JHARKHAND. Quantity: 2. Submission Deadline: 13-03-2026 15: 00: 00. Last date to apply is approaching fast!

Documents 4

GeM-Bidding-8953166.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Western Coalfields Limited Vibrometer Induced Ground Vibration Monitoring Instrument Tender Chandrapur Maharashtra 2025

Western Coalfields Limited

CHANDRAPUR, MAHARASHTRA

Posted: 17 November 2025
Closed: 10 December 2025
GEM

Vibrometer - Induced Ground Vibration Monitoring Instrument

Mahanadi Coalfields Limited

ANGUL, ODISHA

Posted: 24 July 2025
Closed: 16 August 2025
GEM

Vibrometer - Induced Ground Vibration Monitoring Instrument

Western Coalfields Limited

CHANDRAPUR, MAHARASHTRA

Posted: 4 January 2025
Closed: 29 January 2025
GEM

Vibrometer - Induced Ground Vibration Monitoring Instrument

Mahanadi Coalfields Limited

ANGUL, ODISHA

Posted: 19 February 2025
Closed: 12 March 2025
GEM

Vibrometer - Induced Ground Vibration Monitoring Instrument

Central Water And Power Research Station (cwprs)

PUNE, MAHARASHTRA

Posted: 9 October 2025
Closed: 15 November 2025
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Certification Compliance to Standard for Microphone ISEE 2011, IEC 61672 Class 1, ISEE2017
Certification Warranty 1, 2, 3 Or higher
Construction Length of wire for geophone assembly(meter) 5-6, 6-7, 7-8, 8-9, 9-10, 10-50, 50-100, 100-200, 200-400, 400-600, 600-800, 800-1000, 2-5, NA
Construction Length of wire for microphone assembly(meter) 2-3, 3-4, 4-5, 5-6, 6-10, 10-20-, 20-50, 50-75, 75-100, 100-200, 200-400, 400-750, NA
Seismic Vibration Monitoring Resolution of Seismic Velocity(mm/sec) 0.003-0.006, 0.006-0.009, 0.1
Seismic Vibration Monitoring Minimum accuracy of Seismic velocity measurement 2%, 3%, 4%, 5%
Seismic Vibration Monitoring Maximum linear freqency response of Geophone 200, 250, 300, 350, 400, 500, 0
Sound Overpressure Monitoring Maximum Linear sound overpressure monitored (dB) 140-144, 144-148, 148-152, 120-124, 124-128, 128-132, 132-136, 136-140, NA
Sound Overpressure Monitoring Maximum Linear response of microphone 200, 250, 300, 350, 400, 450, 500, 0
Sound Overpressure Monitoring Minimum Linear sound overpressure monitored (dB) 66-70, 70-74, 74-78, 78-82, 82-88, 88-94, NA
Waveform recording & data collection Sample Rate per channel(samples/sec) 512, 1024, 2048, 4096, 8192, 16384, 32768, 65536, NA
Waveform recording & data collection Waveform recording modes Fullwave form, Combined, Manual, NA
Histogram/Bar Graph Recording Display facility feature available Peak particle velocity, Frequency, Displacement, Air over pressure level, Acceleration, Peak Vector Sum, RMS/Peak Velocity, Acceleration & Displacement
Generic Parameters Water Proof(Submerged 20+ cm in water logged mines) Yes, No
Generic Parameters Modular Software for Vibration Data Analysis Provided Yes, No
Generic Parameters Integrated Keypad Yes, No
Accessories External data printer Yes, No

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Additional Doc 1 (Requested in ATC)

4

Additional Doc 2 (Requested in ATC)

5

Additional Doc 3 (Requested in ATC)

6

Additional Doc 4 (Requested in ATC)

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer