Bid Publish Date
14-Jan-2026, 3:01 pm
Bid End Date
28-Jan-2026, 9:00 am
Location
Progress
Quantity
2
Bid Type
Single Packet Bid
The East Central Railway, part of Indian Railways, advertises a tender for an Impact Wrench (Q3) under the Goods & Services framework. The procurement scope is limited to the supply of goods, with an option clause allowing a possible 25% increase in quantity at contracted rates. Inspection is conducted post-receipt at the consignee site. Invoicing must align with the consignee GSTIN. The bid emphasizes delivery efficiency within the extended timeline if quantities rise, and adherence to GST applicability as per actual rates.
Impact Wrench (Q3) with listed technical parameters
Support for standard and high-strength bolts
Warranty information to be provided
No explicit BOQ quantities available
Post-receipt inspection at consignee site
25% quantity increase/decrease option at contracted rates
Post-receipt inspection at consignee site
Invoice to be issued with consignee GSTIN
GST to be paid as per actual rates; invoice in consignee name with consignee GSTIN; reimbursement subject to applicable rates.
Delivery period linked to last date of original delivery order; additional time calculated as (increase in quantity/original quantity) × original delivery period, minimum 30 days.
Not specified in available data; general tender terms apply per purchaser's ATC.
Experience in supplying torque tools or industrial impact wrenches
Ability to meet GST and invoicing requirements with consignee GSTIN
Capability to supply goods-only with warranty coverage
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Impact Wrench (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| Technical Parameter | Number of Batteries Required For Operation | Double Battery |
| Technical Parameter | No Load SpeedRPM | Max / Hard / Mid / Soft : 0-3200/0-2600/0-1800/0-1000 |
| Technical Parameter | Square Drive inch | 1/2 |
| Technical Parameter | Maximum Fastening TorqueN/m | 160 |
| Technical Parameter | Tool Type | Cordless |
| Technical Parameter | Impact Per Minute (IPM) | 0-3200 |
| Technical Parameter | Electronic Speed Selection | 2 Speed |
| Technical Parameter | Standard Bolt | M8-M16 |
| Technical Parameter | High Strength Bolt | M10-M16 |
| Generic | Warranty | 12.0 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates from similar supply of impact wrenches
Financial statements or turnover proof
EMD/Security deposit documents
Technical bid documents and product specifications
OEM authorization or distributor certificate (if applicable)
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | ****** Under PMA | Item Categories : Impact Wrench | |
| L2 | ****** Under PMA | Item Categories : Impact Wrench | |
| L3 | ****** Under PMA | Item Categories : Impact Wrench | |
| L4 | ****** Under PMA | Item Categories : Impact Wrench | |
| L5 | ****** Under PMA | Item Categories : Impact Wrench | |
| L6 | ****** Under PMA | Item Categories : Impact Wrench |
Key insights about BIHAR tender market
Bidders must submit GST, PAN, experience certificates and financial statements along with technical bid documents. Ensure OEM authorization if required, and provide warranty terms. The tender requires supply-only scope and post-receipt inspection; quantity may increase up to 25% at contracted rates.
Prepare GST certificate, PAN card, experience certificates for similar tools, financial statements, EMD documents, technical compliance certificates and OEM/distributor authorizations. Include warranty details and clear indication of post-receipt inspection arrangements at consignee site.
Specifications include number of batteries, no-load RPM, square drive inches, maximum fastening torque in N/m, IPM, electronic speed selection, and bolt compatibility with standard and high-strength bolts; ensure warranty compliance and tool type as specified in the tender.
Delivery timeline links to the last date of the original delivery order; if quantity increases, extended time is calculated as (increase/original) × original period with a minimum of 30 days.
GST will be reimbursed per actuals or applicable rates, whichever is lower, subject to quoted GST percentage; invoice must be raised in consignee name with consignee GSTIN.
Scope is strictly supply of goods; installation or service is not included unless ATC specifies otherwise; post-receipt inspection at consignee site is required.
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS