Progress
Goa Shipyard Limited, operating under the Department of Defence Production, invites bids for the procurement of hand held drilling machines located in South Goa, Goa. The tender lacks published quantity, value, and delivery specifics, but includes an option clause allowing a ±50% quantity variation and a flexible delivery window tied to the original delivery period. The contract framework prescribes adherence to the option clause and delivery mechanics, with emphasis on compliance to the extended-time calculations. The unique aspect is the explicit right to modify quantity and adjust delivery timelines during contract execution, which bidders must accommodate in their planning and pricing.
Product/service: Hand held drilling machine
Quantity: Not disclosed in data
Estimated value: Not disclosed
Standards/certifications: Not specified in data
Delivery: Commencement from last date of original delivery order; extended delivery time formula applies
Experience: Not specified in data; bidders should rely on ATC for requirements
Brand/OEM: Not specified
Option to increase/decrease quantity up to 50% at contract and during currency
Delivery period adjustments follow a defined formula with a 30-day minimum
Delivery starts from the last date of the original delivery order
Purchaser reserves right to alter quantity by up to 50% at placement and during contract at contracted rates
Extended duration calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Compliance with option clause and delivery calculations
Ability to price for quantity variations up to 50%
Submission of standard bidding documents per ATC
Quantity
6
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
HAND HELD DRILLING MACHINE
Payment Timelines
Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
SOUTH GOA
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | SOUTH GOA | SOUTH GOA | - | - | 6 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar hand held drilling machine procurement
Financial statements showing turnover and stability
EMD/Security deposit documentation (as per ATC if required)
Technical bid/compliance statement
OEM authorisation or dealership certificate (if applicable)
Any specific alignment certificates or manufacturer specifications referenced in ATC
Key insights about GOA tender market
Bidders should review the ATC for Goa Shipyard Limited, prepare firm price quotes, and plan for ±50% quantity variation. Include compliance with delivery-time formula, ensure OEM authorisation if required, and attach GST, PAN, financials, and experience certificates. Submit technical and commercial bids as per tender terms.
Submit GST certificate, PAN card, financial statements, experience certificates for similar equipment, EMD documentation if applicable, technical bid, OEM authorization, and any ATC-specific documents. Ensure compliance with delivery-time extension provisions and bid submission format.
Delivery extensions follow: Extended time = (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The Purchaser may adjust the timeline to match contracted rates, starting from the last date of the original delivery order.
No specific standards are listed in the data. Bidders should consult the ATC to identify any required OEM certifications or industry standards (if mentioned) and ensure their product meets those criteria before bid submission.
The option clause permits a ±50% quantity variation at the time of contract placement and during contract currency. Bidders must price accordingly and ensure flexibility in manufacturing and logistics to accommodate changes.
Payment terms are not disclosed in the available data. Bidders should verify through the ATC and final contract. Typically, government procurements include milestone-based payments, with possible advance and post-delivery settlement, subject to compliance and delivery verification.
Refer to the ATC document uploaded with the tender for Goa Shipyard Limited. The ATC contains supplementary terms not visible in the basic data, including eligibility, submission formats, and any brand/OEM requirements.
Eligibility typically requires GST, PAN, prior experience certificates for similar equipment, financial stability documentation, and OEM authorizations if applicable. The ATC will specify any additional mandatory documents to accompany the bid.