Tender Notice for Upgradation Work in P South ward in Z IV in MUMBAI SUBURBAN, MAHARASHTRA
Municipal Corporation of Greater Mumbai
MUMBAI SUBURBAN, MAHARASHTRA
Bid Publish Date
03-Jul-2026, 9:31 am
Bid End Date
20-Jul-2026, 11:00 am
Progress
Quantity
177
Category
Upgradation of existing SAS at Kurnool SS- Supply Portion
Bid Type
Single Packet Bid
A tender has been published for Power Grid Corporation Of India Limited Upgradation of existing SAS at Kurnool SS- Supply Portion, Upgradation of existing SAS at Kurnool SS- Service Portion, Upgradation of existing SAS at Raichur SS- Supply Portion, Upgradation of existing SAS at Raichur SS- Service Portion, Upgradation of existing SAS at Nellore PS- Supply Portion, Upgradation of existing SAS at Nellore PS- Service Portion. Quantity: 177 by. Submission Deadline: 20-07-2026 11: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Upgradation of existing SAS at Kurnool SS- Supply Portion , Upgradation of existing SAS at Kurnool SS- Service Portion , Upgradation of existing SAS at Raichur SS- Supply Portion , Upgradation of existing SAS at Raichur SS- Service Portion , Upgradation of existing SAS at Nellore PS- Supply Portion , Upgradation of existing SAS at Nellore PS- Service Portion
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
34
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Pre-Bid Date
06-07-2026 15:00:00
Pre-Bid Venue
Online mode
Max Delivery Days
244
Delivery Locations
1
Delivery Cities
Kurnool
Delivery Pincodes
518010
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Gorkal Nagaraju | 518010,Power Grid Corporation of India Limited, Kurnool 765 kv SS, near 23 Km Mile Stone, Kurnool-Nandyal Road, Oravakal (PO & Mandal), Kurnool dist, Andhra Pradesh- 518010 | Kurnool | Andhra Pradesh | 518010 | 9 | 244 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Municipal Corporation of Greater Mumbai
MUMBAI SUBURBAN, MAHARASHTRA
Municipal Corporation of Greater Mumbai
MUMBAI SUBURBAN, MAHARASHTRA
Municipal Corporation of Greater Mumbai
MUMBAI SUBURBAN, MAHARASHTRA
Municipal Corporation of Greater Mumbai
MUMBAI SUBURBAN, MAHARASHTRA
Municipal Corporation of Greater Mumbai
MUMBAI SUBURBAN, MAHARASHTRA
Tender Results
Loading results...
Upgradation of existing SAS at Kurnool SS- Supply Portion
Supply of industrial grade PC with latest operating System (Windows 11) with 7 Years Support and with PC specifications as mentioned in SCOPE of work i Server- 02 nos ii Client- 02 nos iii Gateway- 02 nos iv DR-EWS PC- 01 no V Historians - 02 Nos
Upgradation of existing SAS at Kurnool SS- Supply Portion
Supply of Next Generation Fire Walls(NGFW) as per the POWERGRID specifications
Upgradation of existing SAS at Kurnool SS- Supply Portion
Monitors- 27 Inch
Upgradation of existing SAS at Kurnool SS- Supply Portion
Loading of latest SCADA and other software licensed version in Servers-HMIs- Gateways and DR-EWS PCs compatible with latest OS Version with Seven Year patch support
Upgradation of existing SAS at Kurnool SS- Supply Portion
Configuration and software loading in PC (Supply and installation of Antivirus, Network management system and other softwares ) licensed
Upgradation of existing SAS at Kurnool SS- Supply Portion
Engineering, loading and testing & Commissioning of new database
Upgradation of existing SAS at Kurnool SS- Supply Portion
Ethernet Switches with 12CU plus 12 FO.
Upgradation of existing SAS at Kurnool SS- Supply Portion
GPS with POWERGRID TS
Upgradation of existing SAS at Kurnool SS- Supply Portion
Inverters 2KVA
Upgradation of existing SAS at Kurnool SS- Supply Portion
Bay control Unit ( For Swapping during Firmware Upgrdataion)
Upgradation of existing SAS at Kurnool SS- Supply Portion
Patch Cords
Upgradation of existing SAS at Kurnool SS- Service Portion
Final Data base modification at site, testing and commissioning limited to 30 days
Upgradation of existing SAS at Kurnool SS- Service Portion
Installation and commissioning of Next Generation Fire Walls(NGFW) as per the Powergrid Specifications
Upgradation of existing SAS at Raichur SS- Supply Portion
Supply of industrial grade PC with latest operating System(Windows 11) with 7 Years Support and with PC specifications as mentioned in SCOPE of work i) Server- 03 nos ii) Client- 02 nos iii) Gateway- 02 nos iv) DR/EWS PC- 01 no V)Historians - 02 Nos
Upgradation of existing SAS at Raichur SS- Supply Portion
Supply of Next Generation Fire Walls(NGFW) as per the POWERGRID specifications
Upgradation of existing SAS at Raichur SS- Supply Portion
Monitors- 27 Inch
Upgradation of existing SAS at Raichur SS- Supply Portion
Loading of latest SCADA and other software licensed version in Servers -HMIs-Gateways and DR-EWS PCs compatible with latest OS Version with Seven Year patch support
Upgradation of existing SAS at Raichur SS- Supply Portion
Configuration and software loading in PC (Supply and installation of Antivirus, Network management system and other softwares ) licensed
Upgradation of existing SAS at Raichur SS- Supply Portion
Engineering, loading and testing & Commissioning of new database
Upgradation of existing SAS at Raichur SS- Supply Portion
Ethernet Switches with 12CU plus 12 FO.
Upgradation of existing SAS at Raichur SS- Supply Portion
GPS with POWERGRID TS
Upgradation of existing SAS at Raichur SS- Supply Portion
Inverters 2KVA
Upgradation of existing SAS at Raichur SS- Supply Portion
Bay control Unit ( For Swapping during Firmware Upgrdataion)
Upgradation of existing SAS at Raichur SS- Supply Portion
Patch Cords
Upgradation of existing SAS at Raichur SS- Service Portion
Final Data base modification at site, testing and commissioning limited to 30 days
Upgradation of existing SAS at Raichur SS- Service Portion
Installation and commissioning of Next Generation Fire Walls(NGFW) as per the Powergrid Specifications
Upgradation of existing SAS at Nellore PS- Supply Portion
Supply of industrial grade PC with latest operating System(Windows 11) with 7 Years Support. And with PC specifications as mentioned in SCOPE of work i) Server- 03 nos ii) Client- 02 nos iii) Gateway- 02 nos iv) DR/EWS PC- 02 no V)Historians - 02 Nos
Upgradation of existing SAS at Nellore PS- Supply Portion
Supply of Next Generation Fire Walls(NGFW) as per the POWERGRID specifications
Upgradation of existing SAS at Nellore PS- Supply Portion
Monitors- 27 Inch
Upgradation of existing SAS at Nellore PS- Supply Portion
Loading of latest SCADA and other software licensed version in Servers -HMIs- Gateways and DR-EWS PCs compatible with latest OS Version with Seven Year patch support
Upgradation of existing SAS at Nellore PS- Supply Portion
Configuration and software loading in PC (Supply and installation of Antivirus, Network management system and other softwares ) licensed
Upgradation of existing SAS at Nellore PS- Supply Portion
Engineering, loading and testing & Commissioning of new database
Upgradation of existing SAS at Nellore PS- Supply Portion
Ethernet Switches with 12CU plus 12 FO.
Upgradation of existing SAS at Nellore PS- Supply Portion
GPS with POWERGRID TS
Upgradation of existing SAS at Nellore PS- Supply Portion
Inverters 2KVA
Upgradation of existing SAS at Nellore PS- Supply Portion
Bay control Unit ( For Swapping during Firmware Upgrdataion)
Upgradation of existing SAS at Nellore PS- Supply Portion
Patch Cords
Upgradation of existing SAS at Nellore PS- Service Portion
Final Data base modification at site, testing and commissioning limited to 30 days
Upgradation of existing SAS at Nellore PS- Service Portion
Installation and commissioning of Next Generation Fire Walls(NGFW) as per the Powergrid Specifications
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Upgradation of existing SAS at Kurnool SS- Supply Portion | Supply of industrial grade PC with latest operating System (Windows 11) with 7 Years Support and with PC specifications as mentioned in SCOPE of work i Server- 02 nos ii Client- 02 nos iii Gateway- 02 nos iv DR-EWS PC- 01 no V Historians - 02 Nos | 9 | no | consigneekurnool1 | 244 | |
| 2 | Upgradation of existing SAS at Kurnool SS- Supply Portion | Supply of Next Generation Fire Walls(NGFW) as per the POWERGRID specifications | 2 | no | consigneekurnool1 | 244 | |
| 3 | Upgradation of existing SAS at Kurnool SS- Supply Portion | Monitors- 27 Inch | 4 | no | consigneekurnool1 | 244 | |
| 4 | Upgradation of existing SAS at Kurnool SS- Supply Portion | Loading of latest SCADA and other software licensed version in Servers-HMIs- Gateways and DR-EWS PCs compatible with latest OS Version with Seven Year patch support | 1 | lot | consigneekurnool1 | 244 | |
| 5 | Upgradation of existing SAS at Kurnool SS- Supply Portion | Configuration and software loading in PC (Supply and installation of Antivirus, Network management system and other softwares ) licensed | 1 | lot | consigneekurnool1 | 244 | |
| 6 | Upgradation of existing SAS at Kurnool SS- Supply Portion | Engineering, loading and testing & Commissioning of new database | 1 | lot | consigneekurnool1 | 244 | |
| 7 | Upgradation of existing SAS at Kurnool SS- Supply Portion | Ethernet Switches with 12CU plus 12 FO. | 2 | ea | consigneekurnool1 | 244 | |
| 8 | Upgradation of existing SAS at Kurnool SS- Supply Portion | GPS with POWERGRID TS | 1 | set | consigneekurnool1 | 244 | |
| 9 | Upgradation of existing SAS at Kurnool SS- Supply Portion | Inverters 2KVA | 2 | set | consigneekurnool1 | 244 | |
| 10 | Upgradation of existing SAS at Kurnool SS- Supply Portion | Bay control Unit ( For Swapping during Firmware Upgrdataion) | 1 | ea | consigneekurnool1 | 244 | |
| 11 | Upgradation of existing SAS at Kurnool SS- Supply Portion | Patch Cords | 2 | set | consigneekurnool1 | 244 | |
| 12 | Upgradation of existing SAS at Kurnool SS- Service Portion | Final Data base modification at site, testing and commissioning limited to 30 days | 30 | mandays | consigneekurnool1 | 244 | |
| 13 | Upgradation of existing SAS at Kurnool SS- Service Portion | Installation and commissioning of Next Generation Fire Walls(NGFW) as per the Powergrid Specifications | 2 | no | consigneekurnool1 | 244 | |
| 14 | Upgradation of existing SAS at Raichur SS- Supply Portion | Supply of industrial grade PC with latest operating System(Windows 11) with 7 Years Support and with PC specifications as mentioned in SCOPE of work i) Server- 03 nos ii) Client- 02 nos iii) Gateway- 02 nos iv) DR/EWS PC- 01 no V)Historians - 02 Nos | 10 | no | 60001289 | 244 | |
| 15 | Upgradation of existing SAS at Raichur SS- Supply Portion | Supply of Next Generation Fire Walls(NGFW) as per the POWERGRID specifications | 2 | no | 60001289 | 244 | |
| 16 | Upgradation of existing SAS at Raichur SS- Supply Portion | Monitors- 27 Inch | 4 | no | 60001289 | 244 | |
| 17 | Upgradation of existing SAS at Raichur SS- Supply Portion | Loading of latest SCADA and other software licensed version in Servers -HMIs-Gateways and DR-EWS PCs compatible with latest OS Version with Seven Year patch support | 1 | lot | 60001289 | 244 | |
| 18 | Upgradation of existing SAS at Raichur SS- Supply Portion | Configuration and software loading in PC (Supply and installation of Antivirus, Network management system and other softwares ) licensed | 1 | lot | 60001289 | 244 | |
| 19 | Upgradation of existing SAS at Raichur SS- Supply Portion | Engineering, loading and testing & Commissioning of new database | 1 | lot | 60001289 | 244 | |
| 20 | Upgradation of existing SAS at Raichur SS- Supply Portion | Ethernet Switches with 12CU plus 12 FO. | 2 | ea | 60001289 | 244 | |
| 21 | Upgradation of existing SAS at Raichur SS- Supply Portion | GPS with POWERGRID TS | 1 | set | 60001289 | 244 | |
| 22 | Upgradation of existing SAS at Raichur SS- Supply Portion | Inverters 2KVA | 2 | set | 60001289 | 244 | |
| 23 | Upgradation of existing SAS at Raichur SS- Supply Portion | Bay control Unit ( For Swapping during Firmware Upgrdataion) | 1 | ea | 60001289 | 244 | |
| 24 | Upgradation of existing SAS at Raichur SS- Supply Portion | Patch Cords | 2 | set | 60001289 | 244 | |
| 26 | Upgradation of existing SAS at Raichur SS- Service Portion | Final Data base modification at site, testing and commissioning limited to 30 days | 30 | mandays | 60001289 | 244 | |
| 27 | Upgradation of existing SAS at Raichur SS- Service Portion | Installation and commissioning of Next Generation Fire Walls(NGFW) as per the Powergrid Specifications | 2 | no | 60001289 | 244 | |
| 28 | Upgradation of existing SAS at Nellore PS- Supply Portion | Supply of industrial grade PC with latest operating System(Windows 11) with 7 Years Support. And with PC specifications as mentioned in SCOPE of work i) Server- 03 nos ii) Client- 02 nos iii) Gateway- 02 nos iv) DR/EWS PC- 02 no V)Historians - 02 Nos | 11 | no | consigneenellore2 | 244 | |
| 29 | Upgradation of existing SAS at Nellore PS- Supply Portion | Supply of Next Generation Fire Walls(NGFW) as per the POWERGRID specifications | 2 | no | consigneenellore2 | 244 | |
| 30 | Upgradation of existing SAS at Nellore PS- Supply Portion | Monitors- 27 Inch | 4 | no | consigneenellore2 | 244 | |
| 31 | Upgradation of existing SAS at Nellore PS- Supply Portion | Loading of latest SCADA and other software licensed version in Servers -HMIs- Gateways and DR-EWS PCs compatible with latest OS Version with Seven Year patch support | 1 | lot | consigneenellore2 | 244 | |
| 32 | Upgradation of existing SAS at Nellore PS- Supply Portion | Configuration and software loading in PC (Supply and installation of Antivirus, Network management system and other softwares ) licensed | 1 | lot | consigneenellore2 | 244 | |
| 33 | Upgradation of existing SAS at Nellore PS- Supply Portion | Engineering, loading and testing & Commissioning of new database | 1 | lot | consigneenellore2 | 244 | |
| 34 | Upgradation of existing SAS at Nellore PS- Supply Portion | Ethernet Switches with 12CU plus 12 FO. | 2 | ea | consigneenellore2 | 244 | |
| 35 | Upgradation of existing SAS at Nellore PS- Supply Portion | GPS with POWERGRID TS | 1 | set | consigneenellore2 | 244 | |
| 36 | Upgradation of existing SAS at Nellore PS- Supply Portion | Inverters 2KVA | 2 | set | consigneenellore2 | 244 | |
| 37 | Upgradation of existing SAS at Nellore PS- Supply Portion | Bay control Unit ( For Swapping during Firmware Upgrdataion) | 1 | ea | consigneenellore2 | 244 | |
| 38 | Upgradation of existing SAS at Nellore PS- Supply Portion | Patch Cords | 2 | set | consigneenellore2 | 244 | |
| 39 | Upgradation of existing SAS at Nellore PS- Service Portion | Final Data base modification at site, testing and commissioning limited to 30 days | 30 | mandays | consigneenellore2 | 244 | |
| 40 | Upgradation of existing SAS at Nellore PS- Service Portion | Installation and commissioning of Next Generation Fire Walls(NGFW) as per the Powergrid Specifications | 2 | no | consigneenellore2 | 244 |
Discover companies most likely to bid on this tender
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
20-Jul-2026, 11:00 am
Opening Date
20-Jul-2026, 11:30 am
Indian Navy
📍 SOUTH GOA, GOA
HAUDD
📍 JAMMU, JAMMU AND KASHMIR
Bharat Sanchar Nigam Limited Portal(bsnl)
N/a
📍 JYOTIBA PHULE NAGAR, UTTAR PRADESH
Sign up now to access all documents
Main Document
OTHER
OTHER
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS