Progress
Quantity
10
Category
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.1 and attach BoQ Specification
Bid Type
Two Packet Bid
Nuclear Power Corporation Of India Limited invites bids for Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No. 1 and attach BoQ Specification, Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No. 2 and attach BoQ Specification, Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No. 3 and attach BoQ Specification, Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No. 4 and attach BoQ Specification, Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No. 5 and attach BoQ Specification, Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No. 6 and attach BoQ Specification, Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No. 7 and attach BoQ Specification in SURAT, GUJARAT. Quantity: 10. Submission Deadline: 30-01-2025 17: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.1 and attach BoQ Specification , Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.2 and attach BoQ Specification , Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.3 and attach BoQ Specification , Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.4 and attach BoQ Specification , Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.5 and attach BoQ Specification , Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.6 and attach BoQ Specification , Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.7 and attach BoQ Specification
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.1 and attach BoQ Specification
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.1 with following specification_ Location _ U-1 TB Basement Air Washer Plant Load Bearing Capacity _ 300 kg / sqm Material _ UV Stabilized Terpathalic Resin Hardware Accessories _ SS304
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.2 and attach BoQ Specification
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.2 with following specification_ Location _ U-2 TB Basement Air Washer Plant Load Bearing Capacity _ 300 kg/sqm
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.3 and attach BoQ Specification
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.3 with following specification _ Location _ U-1 TB Deaerator floor Air Washer Plant Load Bearing Capacity _ 300 kg/sqm Material _ UV Stabilized Terpathalic Resin Hardware Accessories _ SS304
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.4 and attach BoQ Specification
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.4 with following specification _ Location _ U-2 TB Deaerator floor Air Washer Plant Load Bearing Capacity _ 300 kg/sqm Material _ UV Stabilized Terpathalic Resin Hardware Accessories _ SS304
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.5 and attach BoQ Specification
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.5 with following specification _ Location _ Service Building Air Washer Plant Load Bearing Capacity _ 300 kg/sqm
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.6 and attach BoQ Specification
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.6 with following specification _ Location _ Waste management plant Air Washer Plant Load Bearing Capacity _ 300 kg/sqm
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.7 and attach BoQ Specification
Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.7 with following specification _ Location _ Chiller/Comp. area Air Washer Plant Load Bearing Capacity _ 300 kg/sqm
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.1 and attach BoQ Specification | Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.1 with following specification_ Location _ U-1 TB Basement Air Washer Plant Load Bearing Capacity _ 300 kg / sqm Material _ UV Stabilized Terpathalic Resin Hardware Accessories _ SS304 | 2 | set | con2.gj | 120 | |
| 2 | Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.2 and attach BoQ Specification | Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.2 with following specification_ Location _ U-2 TB Basement Air Washer Plant Load Bearing Capacity _ 300 kg/sqm | 2 | set | con2.gj | 120 | |
| 3 | Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.3 and attach BoQ Specification | Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.3 with following specification _ Location _ U-1 TB Deaerator floor Air Washer Plant Load Bearing Capacity _ 300 kg/sqm Material _ UV Stabilized Terpathalic Resin Hardware Accessories _ SS304 | 1 | set | con2.gj | 120 | |
| 4 | Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.4 and attach BoQ Specification | Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.4 with following specification _ Location _ U-2 TB Deaerator floor Air Washer Plant Load Bearing Capacity _ 300 kg/sqm Material _ UV Stabilized Terpathalic Resin Hardware Accessories _ SS304 | 1 | set | con2.gj | 120 | |
| 5 | Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.5 and attach BoQ Specification | Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.5 with following specification _ Location _ Service Building Air Washer Plant Load Bearing Capacity _ 300 kg/sqm | 2 | set | con2.gj | 120 | |
| 6 | Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.6 and attach BoQ Specification | Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.6 with following specification _ Location _ Waste management plant Air Washer Plant Load Bearing Capacity _ 300 kg/sqm | 1 | set | con2.gj | 120 | |
| 7 | Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.7 and attach BoQ Specification | Supply and Installation of FRP Structure and Platform With Handrail and Cage Ladder as per Drawing No.7 with following specification _ Location _ Chiller/Comp. area Air Washer Plant Load Bearing Capacity _ 300 kg/sqm | 1 | set | con2.gj | 120 |
Discover companies most likely to bid on this tender
Certificate (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about GUJARAT tender market
The eligibility requirements for this tender include being a registered entity with the capability to fulfill the requirements outlined. Additionally, bidders need to submit necessary documentation and certificates proving their expertise in relevant projects. If exemption from experience criteria is sought, supporting documents must be uploaded for evaluation.
Bidders are required to submit various certificates including compliance documents as specified in the Additional Terms and Conditions (ATC). These include proof of experience in similar projects and certifications relevant to the materials used in the FRP structure.
To register, bidders should visit the designated tender portal and create an account following the specified registration guidelines. Once registered, they can access the tender documents and submit their bids accordingly.
Documents must be submitted in electronic formats specified in the tender guidelines. Common formats include PDF for submissions of reports, specifications, and compliance documents.
All technical specifications required for this tender are outlined in the BoQ documentation. Bidders must ensure that their proposals meet these specifications to ensure compliance and project success.
Yes, all submissions must adhere to the quality standards set by the Department of Atomic Energy. This includes compliance with safety and structural integrity norms set forth in the tender documents.
Bidders must establish compliance with both technical and financial requirements as highlighted in the tender documentation. This involves adherence to standards set in the attached BoQ specifications.
Testing criteria will be detailed in the technical documents provided with the tender. Successful bidders should include a plan to meet these criteria effectively in their proposals.
The Earnest Money Deposit (EMD) required for this tender is ₹46,600. This deposit must be submitted along with other required documentation to validate the bid.
Performance securities are mandated as per the guidelines specified in the tender documents. Bidders should prepare for this requirement to guarantee service and project fulfillment.
Payment terms will be clearly laid out in the tender documentation, including the conditions that must be fulfilled prior to payment release.
Price evaluation is conducted based on the total value of bids submitted, factoring in both technical compliance and financial viability of the proposals.
Bids should be submitted electronically through the designated portal where the tender is posted. Ensure all documents are in the required formats to avoid disqualification.
Timelines and deadlines for submission will be specified in the tender documents. It is crucial for bidders to stay informed about these dates to ensure timely submission.
The evaluation and selection process will evaluate all bids based on adherence to technical specifications, financial documentation, and overall value of the bid.
The notification process for results will be conducted via the tender portal where all bidders will be informed about the outcomes following the evaluation phase.
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS