Supply of Stepper motor with shaft length 100 mm and Shaft Dia 10 mm and Torque 10 Kg.cm,Supply of
EMD
₹26,650
Value
₹5,33,006
Deadline
16 Oct 2025
Location
VIZIANAGARAM, ANDHRA PRADESH
Supply of Stepper motor with shaft length 100 mm and Shaft Dia 10 mm and Torque 10 Kg.cm,Supply of
Tender Key Details
Organization
Directorate General Of Lighthouses And Lightships
Department
NA
Quantity
36
Bid Validity
90 (Days)
Bid Type
Two Packet Bid
Tender Overview
Supply of Stepper motor with shaft length 100 mm and Shaft Dia 10 mm and Torque 10 Kg.cm,Supply of
Important Timeline
Start: 24 Sept 2025
End: 16 Oct 2025
AI-Powered Bidder Prediction
Discover which companies are most likely to bid
Unlock Bidder Insights
Get AI-powered predictions about which companies are most likely to bid on this tender
Additional Information
Supply of Stepper motor with shaft length 100 mm and Shaft Dia 10 mm and Torque 10 Kg.cm,Supply of
Item Category
Supply of Stepper motor with shaft length 100 mm and Shaft Dia 10 mm and Torque 10 Kg.cm , Supply of 10 KG Stepper motor controller with ONOFF Switch, Direction Switch , Supply of Adapter Lead for used to connect the stepper motor controller to the stepper motor , Supply of Stepper motor with shaft length 100 mm and Shaft Dia 12 mm and Torque 20 Kg.cm , Supply of 20 KG Stepper motor controller with ONOFF Switch, Direction Switch, , Supply of Stepper motor with shaft length 100 mm and Shaft Dia 12 mm and Torque 40 Kg.cm , Supply of 40 KG Stepper motor controller with ONOFF Switch, Direction Switch , Supply of Adapter Lead for used to connect the stepper motor controller to the stepper motor.
Organization Details
Authority
Organization
Directorate General Of Lighthouses And Lightships
Department
NA
Ministry
Ministry of Ports, Shipping and Waterways
Contact
State
ANDHRA PRADESH
Documents & Downloads
GeM-Bidding-8394687.pdf
Main Document
BOQ Document
BOQ
BOQ Document
BOQ
Buyer uploaded ATC document
ATC
GEM General Terms and Conditions Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Required Documents from Seller
Experience Criteria,Past Performance,Bidder Turnover,OEM Authorization Certificate,Additional Doc 1 (Requested in ATC),Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Additional Info
Evaluation Method
Total value wise evaluation
Inspection Required
No
Arbitration
No
Bid to RA
No