TenderDekho Logo
Closed GEM

Directorate Of Medical Education & Research Rohtak UPS 10 KVA Battery IS 16242 Part 1 Tender 2026

Bid Publish Date

30-Sep-2026, 2:08 pm

Bid End Date

13-Oct-2026, 5:00 pm

EMD

₹75,600

Value

₹37,80,000

Progress

Issue30-Sep-2026, 2:08 pm
AwardPending

Tender Overview

Directorate Of Medical Education & Research (Haryana) invites bids for an Online UPS (10 KVA) with Battery conforming to IS 16242 (Part 1) to support medical education facilities in Rohtak, Haryana 124001. Estimated value is ₹3,780,000 with an EMD of ₹75,600. The procurement is governed by detailed Buyer Added Terms: quantity flex up to 25%, and extension rules linked to delivery periods. The project emphasizes supplier readiness for expansion within contract-at-rate constraints and requires bidders to demonstrate turnover and OEM capabilities per the bid document. This tender targets suppliers able to deliver compliant UPS systems and provide service coverage for on-site or carry-in warranties as applicable.

Technical Specifications & Requirements

  • Product category: Online UPS (10 KVA) with Battery
  • Standard compliance: IS 16242 (Part 1); battery-backed UPS as required by the specification
  • Delivery scope: delivery period tied to original delivery order; option to increase quantity by up to 25% during contract; extended timing calculations apply
  • Financials: Estimated value ₹3,780,000; EMD ₹75,600; turnover evidence required from bidders and OEM per bid document
  • Warranty/Service: presence of functional service centers in the same state as each consignee location for carry-in warranty; on-site warranty scenarios noted
  • OEM requirement: OEM turnover criteria apply; if multiple bids, the OEM with the highest bid value must meet turnover criteria
  • Documents & submission: audited statements or CA certificates to demonstrate turnover; required service center details; bid documentation must include OEM authorizations where applicable

Terms, Conditions & Eligibility

  • EMD: ₹75,600; payment terms to be clarified in bid
  • Turnover criteria: minimum average annual turnover over last 3 years; evidence via audited balances or CA certificate
  • Delivery timeline: timeline aligned to original delivery order; option-driven extension based on quantity change
  • Service capability: functional service center in each consignee state for carry-in warranty; or on-site warranty where applicable
  • OEM qualification: OEM turnover criteria must be met; in bunch bids, OEM with highest bid value must satisfy criteria
  • Documentation: GST, PAN, experience certificates, financial statements, EMD submission, technical compliance documents, and OEM authorizations as required in terms
  • Right to revise: purchaser reserves right to adjust quantity up to 25% during and after contract; compliance with option clause mandatory

Key Specifications

  • Product/service names: Online UPS 10 KVA with Battery

  • Estimated value: ₹3,780,000

  • EMD: ₹75,600

  • Standards: IS 16242 (Part 1) conformity

  • Delivery: 30+ days typical; option to modify delivery per clause

  • Warranty/Service: service center presence in each consignee state; on-site warranty where applicable

Terms & Conditions

  • Option Clause allows quantity variation up to 25% during and after award

  • Turnover evidence required: bidder and OEM average turnover over last 3 years

  • Service Centre requirement: functional centers in each consignee state for carry-in warranty

Important Clauses

Payment Terms

Terms to be defined in bid; EMD submitted with bid; payment aligned to delivery and acceptance

Delivery Schedule

Delivery period starts from last date of original delivery order; extended time proportional to quantity change

Penalties/Liquidated Damages

Penalty terms to be outlined in bid; adherence to delivery and warranty commitments

Bidder Eligibility

  • Minimum average turnover over last 3 financial years as specified in bid

  • OEM turnover criterion met in case of bunch bids

  • Functional service center presence in each consignee state or on-site warranty applicable

Advertisement

Authority & Contact

Office Name

University Of Health Sciences Rohtak

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

180

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

4 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

18

OEM Avg. Turnover

112

Past Performance

40 %

Warranty Period

2 years

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2)

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

24

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Rohtak

Delivery Pincodes

124001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sanjay Gupta124001,PGIMS, ROHTAK 124001 University of Health Sciences, Rohtak HARYANARohtakHaryana12400118045-

Authority Records

MEDICAL EDUCATION AND RESEARCH DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9929743.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 4

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements for last 3 years or CA certificate indicating turnover

4

EMD submission proof (DD/online payment receipt)

5

Technical bid documents and IS 16242 (Part 1) compliance statements

6

OEM authorization letters and service centre details

7

Experience certificates for similar UPS supply or installation projects

8

Any other documents as specified in T&C (delivery, warranty, penalties)

Frequently Asked Questions

Key insights about HARYANA tender market

How to bid for UPS tender in Rohtak Haryana 2026}

Bidders must submit GST, PAN, turnover proofs, EMD ₹75,600, and OEM authorizations. Provide IS 16242 (Part 1) compliance statements and service center details. Ensure turnover meets the bidder and OEM criteria and include audited financials or CA certificates for the last three years.

What documents are required for Rohtak UPS procurement bid 2026?

Required documents include GST certificate, PAN, last 3 years turnover proof, EMD receipt, technical bid with IS 16242 compliance, OEM authorization letters, service center details in Haryana, and experience certificates for similar UPS installations.

What standards must the 10 KVA UPS Rohtak meet?

The UPS must conform to IS 16242 (Part 1). Submit compliance statements and any testing certificates. Ensure battery safety standards align with IS guidelines and include warranty terms for carry-in or on-site service.

What is the EMD amount for this Rohtak UPS tender?

The EMD is ₹75,600. Submit proof via online payment or bank demand draft with bid submission. EMD ensures bid validity and compliance with tender terms, including option-based quantity adjustments.

When can delivery be extended under the option clause Rohtak bid?

Delivery can be extended if the purchaser exercises the option clause, allowing up to 25% quantity variation. Additional time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.

What service capabilities are required for Rohtak UPS supply?

Bidder must have a functional service centre in Haryana for carry-in warranty, or provide on-site warranty if applicable. Centre must support installation, maintenance, and replacement within agreed SLAs and ensure spares availability.

What turnover evidence is acceptable for eligibility Rohtak UPS?

Submit certified audited balance sheets or CA/Cost Accountant certificates showing the minimum average annual turnover over the last 3 years. If the company is <3 years old, use completed years post-constitution for calculation.

What are the key terms for OEM turnover in multi-bid offers?

In bunch bids, the OEM of the primary product with the highest bid value must meet the OEM turnover criteria. Provide OEM-specific turnover proofs and ensure alignment with the bid’s category requirements.